Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100 *
Ginna 100
Hope Creek 1 100
Indian Point 2 100
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 90 PERFORMING MAINTENANCE ON A CIRC WATER PUMP *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 35 PLANNED LOAD DROP TO 20% POWER FOR A PLANNED ENTRANCE INTO THE DRYWELL TO REPAIR A NITROGEN LEAK. *
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 0 2001-10-08 REFUELING OUTAGE
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 18 REDUCING REACTOR POWER TO TAKE THE MAIN TURBINE OFF LINE FOR REPAIRS. *
Farley 2 100
Harris 1 0 2001-09-21 REFUELING OUTAGE - DEFUELED
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 0 2001-10-28 MAINTENANCE OUTAGE
Oconee 1 100
Oconee 2 100
Oconee 3 0 2001-11-10 REFUELING OUTAGE
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2001-11-25 REFUELING OUTAGE - EXITING MIDLOOP OPS *
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 0 2001-10-14 REFUELING OUTAGE
Surry 2 32 INCREASING POWER *
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 96 100% EQUIVALENT ELECTRICAL
Byron 1 99 *
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 46 REDUCING POWER DOWN TO 25% TO PERFORM WORK ON MG SET FOR RECIRC PUMP "3B". *
Duane Arnold 93 HOLDING POWER AT MAXIMUM PER INTERIM POWER UPRATE *
Fermi 2 60 HOLDING POWER LEVEL FOR NEUTRON MONITORING EQUIPMENT ADJUSTMENTS *
Kewaunee 0 2001-09-23 REFUELING OUTAGE
La Salle 1 98 COASTDOWN TO REFUELING OUTAGE
La Salle 2 90 SURVEILLANCE TESTING *
Monticello 0 2001-11-03 REFUELING OUTAGE
Palisades 0 2001-06-20 MAINTENANCE OUTAGE
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100 *
Comanche Peak 1 98 *
Comanche Peak 2 100
Cooper 0 2001-11-03 REFUELING OUTAGE
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 99 *
Grand Gulf 1 100
Palo Verde 1 99
Palo Verde 2 98
Palo Verde 3 72 REDUCING POWER DOWN TO 12% FOR PLANNED MAIN TURBINE WORK. *
River Bend 1 100
San Onofre 2 100
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.