Skip to main content

Power Reactor Status Report for November 03, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100 *
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 0 2001-10-09 REFUELING OUTAGE - STARTUP IN PROGRESS *
Indian Point 2 0 2001-10-26 MAINTENANCE OUTAGE
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 74 INCREASING POWER AFTER DECREASING TO 60% TO PERFORM A ROD PATTERN ADJUSTMENT *
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 0 2001-10-08 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS *
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 0 2001-10-05 REFUELING OUTAGE - HEAD DETENSIONED - PREPARING FOR HEAD LIFT *
Farley 2 100
Harris 1 0 2001-09-21 REFUELING OUTAGE - DEFUELED
Hatch 1 100
Hatch 2 100 *
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 0 2001-10-28 MAINTENANCE OUTAGE - HEAD DETENSIONED - PREPARING TO LIFT HEAD FOR INSPECTION *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 0 2001-10-21 REFUELING OUTAGE - DEFUELED
Sequoyah 2 100
Summer 100
Surry 1 0 2001-10-14 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS *
Surry 2 100
Turkey Point 3 94 HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT A TURBINE VALVE PROBLEM *
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 84 HOLDING POWER AT THIS LEVEL DUE TO TURBINE GENERATOR VIBRATION
Byron 1 99 100% OF RATED ELECTRICAL CAPABILITY
Byron 2 100
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 0 2001-10-20 REFUELING OUTAGE - PREPARING FOR HYDRO *
Dresden 3 100
Duane Arnold 100
Fermi 2 0 2001-10-27 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS *
Kewaunee 0 2001-09-23 REFUELING OUTAGE - DEFUELED
La Salle 1 100
La Salle 2 100
Monticello 7 PREPARING TO TAKE THE UNIT OFF LINE TO ENTER A REFUELING OUTAGE *
Palisades 0 2001-06-20 MAINTENANCE OUTAGE
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 6 INCREASING POWER - PREPARING TO PLACE THE UNIT ON LINE AFTER RECOVERING FROM A MANUAL REACTOR TRIP DUE TO A STEAM LEAK ON 10/31/01 (Refer to event #38448) *
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 18 HOLDING POWER AT THIS LEVEL TO WAIT FOR AS-TILT VALUES TO COME BACK INTO SPEC AFTER RECOVERING FROM AN AUTOMATIC REACTOR TRIP FROM 22% POWER DURING CEA TROUBLESHOOTING ON 11/01/01 (Refer to event #38457) *
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 17 PREPARING TO TAKE THE UNIT OFF LINE TO ENTER A REFUELING OUTAGE *
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 96 HOLDING POWER AT THIS LEVEL TO PERFORM WEEKLY STEAM GENERATOR BLOWDOWNS *
Palo Verde 2 0 2001-10-10 MAINTENANCE OUTAGE
Palo Verde 3 0 2001-09-28 REFUELING OUTAGE *
River Bend 1 100
San Onofre 2 100
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.