Skip to main content

Power Reactor Status Report for May 19, 2001

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 0 2001-05-18 SCHEDULED OUTAGE *
Calvert Cliffs 2 98 *
FitzPatrick 100
Ginna 100
Hope Creek 1 82 INCREASING POWER *
Indian Point 2 100
Indian Point 3 0 2001-04-27 REFUELING OUTAGE
Limerick 1 67 PLANNED LOAD REDUCTION *
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 1 STARTUP *
Oyster Creek 100 *
Peach Bottom 2 48 WATERBOX CLEANING IN PROGRESS *
Peach Bottom 3 100
Pilgrim 1 26 INCREASING POWER *
Salem 1 25 INCREASING POWER *
Salem 2 100
Seabrook 1 95 HOLDING POWER DUE TO LOSS OF A CIRCULATING WATER PUMP
Susquehanna 1 100
Susquehanna 2 60 PERFORMING WATERBOX INSPECTION. *
Three Mile Island 1 75 OBSERVING "A" MAIN TRANSFORMER GASES. *
Vermont Yankee 0 2001-04-27 REFUELING OUTAGE

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 57 TESTING IN PROGRESS *
Brunswick 2 100
Catawba 1 92 INCREASING POWER AFTER TESTING *
Catawba 2 100
Crystal River 3 0 2001-05-18 SCHEDULED MAINTENANCE WORK ON THE FEEDWATER SYSTEM. *
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 92 BEARING TROUBLE WITH ONE CONDENSATE BOOSTER PUMP
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 90 INCREASING POWER *
Oconee 2 0 2001-04-25 REFUELING OUTAGE
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 88 MAIN FEED PUMP WORK *
Surry 1 100
Surry 2 0 2001-05-11 MAINTENANCE OUTAGE
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 97 RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE
Braidwood 2 100
Byron 1 98 RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE
Byron 2 99 RECENTLY COMPLETED POWER UPRATE - POWER LIMITED BY TURBINE
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Duane Arnold 0 2001-04-12 REFUELING OUTAGE
Fermi 2 100
Kewaunee 97 MAXIMUM POWER LEVEL DUE TO PLUGGED STEAM GENERATOR TUBES *
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 88 INCREASING POWER *
Perry 1 73 HOLDING POWER FOR CIRC WATER PUMP PROBLEM *
Point Beach 1 100
Point Beach 2 60 WATERBOX CLEANING *
Prairie Island 1 100
Prairie Island 2 0 2001-05-09 MAINTENANCE OUTAGE
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 2001-04-06 REFUELING OUTAGE
Columbia Generating Station 13 COASTDOWN TO REFUELING OUTAGE *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 2001-04-28 REFUELING OUTAGE
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 99
Palo Verde 2 99 *
Palo Verde 3 45 REDUCING REACTOR POWER FOR MAIN TURBINE WORK *
River Bend 1 100
San Onofre 2 100
San Onofre 3 0 2001-02-03 MAINTENANCE OUTAGE
South Texas 1 100
South Texas 2 90 TESTING *
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.