Power Reactor Status Report for October 16, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2000-09-22 EXITING REFUELING OUTAGE *
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 0 2000-10-07 REFUELING OUTAGE - PHASE 1 OF FUEL SHUFFLE COMPLETE - CONTROL ROD DRIVE CHANGEOUTS IN PROGRESS *
Ginna 0 2000-09-18 EXITING REFUELING OUTAGE - PREPARING TO ENTER MODE 3 *
Hope Creek 1 100
Indian Point 2 0 2000-02-15 DEFUELED
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 0 2000-10-13 ENTERING REFUELING OUTAGE
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 0 2000-10-05 REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS *
Seabrook 1 90 COASTDOWN TO REFUELING OUTAGE *
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100 UNUSUAL EVENT DECLARED AND TERMINATED ON 10/14/00 DUE TO A FIRE IN THE PROTECTED AREA LASTING LONGER THAN 10 MINUTES (REFER TO EVENT #37430)
Catawba 1 0 2000-10-14 ENTERING REFUELING OUTAGE
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 0 2000-09-29 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS
Hatch 2 100
McGuire 1 100
McGuire 2 87 HOLDING POWER AT THIS LEVEL TO PERFORM T(ave) TESTING AFTER EXITING A REFUELING OUTAGE *
North Anna 1 100
North Anna 2 100 DECREASED TO ABOUT 26% POWER ON 10/14/00 TO ENTER CONTAINMENT AND MANUALLY ISOLATE A SMALL IDENTIFIED LEAK (0.1 GPM) POSSIBLY ON A SAMPLE LINE VALVE IN A LOOP ROOM - UNIT REMAINED ON LINE *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100 .
Sequoyah 1 0 2000-10-06 FORCED MAINTENANCE OUTAGE
Sequoyah 2 79 COASTDOWN TO REFUELING OUTAGE *
Summer 0 2000-10-07 REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS *
Surry 1 100
Surry 2 0 2000-09-30 REFUELING OUTAGE - DEFUELED
Turkey Point 3 100
Turkey Point 4 0 2000-09-24 REFUELING OUTAGE - REFUELED
Vogtle 1 0 2000-09-17 EXITING REFUELING OUTAGE *
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100 *
Byron 2 100
Clinton 0 2000-10-14 ENTERING REFUELING OUTAGE - HEAD DETENSIONING IN PROGRESS *
D.C. Cook 1 0 1997-09-08 REFUELING OUTAGE - DEFUELED
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Duane Arnold 100
Fermi 2 100
Kewaunee 96 MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES
La Salle 1 100
La Salle 2 97 HOLDING POWER AT THIS LEVEL DUE TO THERMAL LIMITS
Monticello 100
Palisades 100
Perry 1 98 ADMINISTRATIVE POWER LIMIT DUE TO POWER UPRATE *
Point Beach 1 100
Point Beach 2 0 2000-10-13 ENTERING REFUELING OUTAGE *
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 0 2000-10-14 ENTERING REFUELING OUTAGE - PREPARING FOR CORE ALTERATIONS *
Quad Cities 2 95 HOLDING POWER AT THIS LEVEL DUE TO A TURBINE CONTROL VALVE PROBLEM *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2000-09-15 REFUELING OUTAGE - REPLACING STEAM GENERATORS - DEFUELED
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 2000-09-30 REFUELING OUTAGE - DEFUELED
Cooper 0 2000-10-14 AUTOMATIC REACTOR SCRAM FROM 100% POWER DUE TO A MAIN GENERATOR TRIP FOR UNKNOWN REASONS (REFER TO EVENT #37429)
Diablo Canyon 1 0 2000-10-08 ENTERING REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS *
Diablo Canyon 2 100
Fort Calhoun 0 2000-10-14 FORCED MAINTENANCE OUTAGE DUE TO INDICATION OF REACTOR COOLANT PUMP SEAL DEGRADATION (NOT LEAKAGE) - PLAN TO REPLACE SEAL *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2000-10-03 REFUELING OUTAGE - DEFUELED
Palo Verde 3 99 HOLDING POWER AT THIS LEVEL DUE TO THERMAL LIMITS
River Bend 1 97 INCREASING POWER AT A RATE OF 1% PER DAY - POWER UPRATE IN PROGRESS *
San Onofre 2 0 2000-10-07 ENTERING REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS *
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 0 2000-10-14 ENTERING REFUELING OUTAGE *
Wolf Creek 1 0 2000-09-29 REFUELING OUTAGE - DEFUELED

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.