Skip to main content

Power Reactor Status Report for October 09, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2000-09-22 REFUELING OUTAGE - DEFUELED
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 0 2000-10-07 REFUELING OUTAGE *
Ginna 0 2000-09-18 EXITING REFUELING OUTAGE
Hope Creek 1 100 *
Indian Point 2 0 2000-02-15 DEFUELED
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100 *
Millstone 3 100
Nine Mile Point 1 0 2000-09-24 APPROACHING CRITICALITY *
Nine Mile Point 2 100
Oyster Creek 80 COASTDOWN TO REFUELING OUTAGE *
Peach Bottom 2 91 HAVE WATER BOX "2C" VALVED OUT TO REPAIR A LEAK. *
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 0 2000-10-05 ENTERING REFUELING OUTAGE R11
Seabrook 1 95 COASTDOWN TO REFUELING OUTAGE *
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100 *
Brunswick 2 100
Catawba 1 88 COASTDOWN TO REFUELING OUTAGE
Catawba 2 100
Crystal River 3 100
Farley 1 89 REDUCED REACTOR POWER DUE TO "1C" COOLING TOWER BEING TAKEN OUT OF SERVICE FOR REPAIRS. *
Farley 2 100
Harris 1 99 *
Hatch 1 0 2000-09-29 REFUELING OUTAGE
Hatch 2 100
McGuire 1 100
McGuire 2 0 2000-09-01 EXITING REFUELING OUTAGE
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100 .
Sequoyah 1 0 2000-10-06 INVESTIGATING PROBLEM WITH VIBRATION OF RCP #4. *
Sequoyah 2 84 COASTDOWN TO REFUELING OUTAGE *
Summer 0 2000-10-07 ENTERING REFUELING OUTAGE #12 *
Surry 1 100
Surry 2 0 2000-09-30 REFUELING OUTAGE - DEFUELED
Turkey Point 3 100
Turkey Point 4 0 2000-09-24 REFUELING OUTAGE - DEFUELED
Vogtle 1 0 2000-09-17 REFUELING OUTAGE - REFUELING
Vogtle 2 100
Watts Bar 1 70 INCREASING POWER LEVEL TO 75% FOR A CORE FLUX MAP. *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 86 TURBINE VALVE TESTING *
Braidwood 2 100
Byron 1 0 2000-09-22 EXITING REFUELING OUTAGE
Byron 2 100
Clinton 99 COASTDOWN TO REFUELING OUTAGE *
D.C. Cook 1 0 1997-09-08 REFUELING OUTAGE - DEFUELED
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Duane Arnold 100
Fermi 2 100
Kewaunee 96 MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES
La Salle 1 56 INCREASING REACTOR POWER *
La Salle 2 75 COASTDOWN TO REFUELING OUTAGE - TURBINE CONTROL VALVE # 1 CLOSED. *
Monticello 100
Palisades 100
Perry 1 95 HOLDING POWER LEVEL DUE TO MSR # 2A & # 2B BEING ISOLATED. *
Point Beach 1 90 REDUCED POWER FOR PLANNED MAINTENANCE
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 81 COASTDOWN TO REFUELING OUTAGE
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2000-09-15 REFUELING OUTAGE - REPLACING STEAM GENERATORS - DEFUELED
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 2000-09-30 REFUELING OUTAGE
Cooper 100
Diablo Canyon 1 0 2000-10-08 ENTERING REFUELING OUTAGE. *
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2000-10-03 REFUELING OUTAGE
Palo Verde 3 99
River Bend 1 100 *
San Onofre 2 0 2000-10-07 ENTERING REFUELING OUTAGE *
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 0 2000-09-29 REFUELING OUTAGE

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.