Power Reactor Status Report for October 01, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2000-09-22 REFUELING OUTAGE
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 95 *
Ginna 0 2000-09-18 REFUELING OUTAGE
Hope Creek 1 100 *
Indian Point 2 0 2000-02-15 DEFUELED
Indian Point 3 100
Limerick 1 100
Limerick 2 100
Millstone 2 100 *
Millstone 3 100
Nine Mile Point 1 0 2000-09-24 MAINTENANCE OUTAGE
Nine Mile Point 2 100
Oyster Creek 82 COASTDOWN TO REFUELING OUTAGE *
Peach Bottom 2 0 2000-09-15 REFUELING OUTAGE
Peach Bottom 3 75 HOLDING FOR REACTOR FEED PUMP TEST *
Pilgrim 1 1 POWER <1% - SHUTTING DOWN TO HOT SHUTDOWN DUE TO FEEDWATER HEATER LEAK *
Salem 1 100
Salem 2 89 COASTDOWN TO REFUELING OUTAGE *
Seabrook 1 99 COASTDOWN TO REFUELING OUTAGE *
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100 *
Catawba 1 96 COASTDOWN TO REFUELING OUTAGE
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 100
Harris 1 95 INCREASING POWER FOLLOWING TURBINE VALVE TEST *
Hatch 1 0 2000-09-29 MANUAL REACTOR SCRAM FROM 55% POWER - SEE EVENT # 37390 - ENTERING REFUELING OUTAGE *
Hatch 2 100
McGuire 1 100
McGuire 2 0 2000-09-01 REFUELING OUTAGE - 150 FUEL ASSEMBLIES LOADED *
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100 .
Sequoyah 1 0 2000-09-25 MAINTENANCE OUTAGE
Sequoyah 2 90 COASTDOWN TO REFUELING OUTAGE *
Summer 89 COASTDOWN TO REFUELING OUTAGE *
Surry 1 100
Surry 2 0 2000-09-30 REFUELING OUTAGE *
Turkey Point 3 100
Turkey Point 4 0 2000-09-24 REFUELING OUTAGE
Vogtle 1 0 2000-09-17 REFUELING OUTAGE - DEFUELED
Vogtle 2 100
Watts Bar 1 0 2000-09-09 REFUELING OUTAGE

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 0 2000-09-22 REFUELING OUTAGE - DEFUELED *
Byron 2 100
Clinton 98 COASTDOWN TO REFUELING OUTAGE
D.C. Cook 1 0 1997-09-08 REFUELING OUTAGE - DEFUELED
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 0 2000-09-16 REFUELING OUTAGE
Duane Arnold 100
Fermi 2 100
Kewaunee 96 MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES
La Salle 1 85 REDUCED POWER FOR SURVEILLANCE TEST *
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 98
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 87 COASTDOWN TO REFUELING OUTAGE *
Quad Cities 2 93 REDUCING POWER DUE TO PROBLEMS WITH THE "3" CONTROL VALVE *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2000-09-15 REFUELING OUTAGE - REPLACING STEAM GENERATORS - DEFUELED
Callaway 100
Columbia Generating Station 100 *
Comanche Peak 1 100
Comanche Peak 2 0 2000-09-30 REFUELING OUTAGE *
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100 *
Palo Verde 1 100
Palo Verde 2 89 COASTDOWN TO REFUELING OUTAGE *
Palo Verde 3 0 2000-09-27 MAINTENANCE OUTAGE
River Bend 1 100
San Onofre 2 95 COASTDOWN TO REFUELING OUTAGE
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 0 2000-09-29 REFUELING OUTAGE *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.