Power Reactor Status Report for September 17, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 85 COASTDOWN TO REFUELING OUTAGE *
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 76 COASTDOWN TO REFUELING OUTAGE
Hope Creek 1 100
Indian Point 2 0 2000-02-15 DEFUELED
Indian Point 3 100
Limerick 1 76 INCREASING POWER *
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 95 CONDENSATE DEMINERALIZER CLEANING
Nine Mile Point 2 32 INCREASING POWER *
Oyster Creek 85 COASTDOWN TO REFUELING OUTAGE
Peach Bottom 2 0 2000-09-15 MANUAL REACTOR SCRAM. SEE EVENT 37330.
Peach Bottom 3 100
Pilgrim 1 100 *
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 58 CONDENSER BACKWASHING *
Catawba 1 100
Catawba 2 100
Crystal River 3 100 *
Farley 1 100
Farley 2 90 TURBINE VALVE TESTING *
Harris 1 100
Hatch 1 99 COASTDOWN TO REFUELING OUTAGE *
Hatch 2 100
McGuire 1 100
McGuire 2 0 2000-09-01 REFUELING OUTAGE - DEFUELED
North Anna 1 100
North Anna 2 100 *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 99 *
Saint Lucie 1 100
Saint Lucie 2 100 .
Sequoyah 1 100
Sequoyah 2 100
Summer 100 COASTDOWN TO REFUELING OUTAGE *
Surry 1 100
Surry 2 95 COASTDOWN TO REFUELING OUTAGE *
Turkey Point 3 100
Turkey Point 4 95 COASTDOWN TO REFUELING OUTAGE
Vogtle 1 0 2000-09-17 REFUELING OUTAGE *
Vogtle 2 100
Watts Bar 1 0 2000-09-09 REFUELING OUTAGE

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 77 COASTDOWN TO REFUELING OUTAGE *
Byron 2 100
Clinton 100 *
D.C. Cook 1 0 1997-09-08 REFUELING OUTAGE - DEFUELED
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 0 2000-09-16 REFUELING OUTAGE
Duane Arnold 100
Fermi 2 100
Kewaunee 96 MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 25 INCREASING POWER *
Perry 1 98 ADMINISTRATIVE POWER LIMIT
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 43 TURBINE VALVE TESTING *
Prairie Island 2 100
Quad Cities 1 89 COASTDOWN TO REFUELING OUTAGE *
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2000-09-15 REFUELING OUTAGE *
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 92 FOLLOWING LOAD SCHEDULE *
Diablo Canyon 1 100
Diablo Canyon 2 60 INCREASING POWER *
Fort Calhoun 100
Grand Gulf 1 0 2000-09-15 STARTUP IN PROGRESS *
Palo Verde 1 100
Palo Verde 2 99 *
Palo Verde 3 100
River Bend 1 100
San Onofre 2 100
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 97 COASTDOWN TO REFUELING OUTAGE *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.