Power Reactor Status Report for September 10, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 91 COASTDOWN TO REFUELING OUTAGE
Calvert Cliffs 1 100
Calvert Cliffs 2 93 REDUCED POWER TO CLEAN WATERBOXES *
FitzPatrick 100
Ginna 84 COASTDOWN TO REFUELING OUTAGE *
Hope Creek 1 97 INCREASING POWER TO 100% *
Indian Point 2 0 2000-02-15 DEFUELED
Indian Point 3 100
Limerick 1 100
Limerick 2 35 REDUCED POWER DUE TO TRIP OF THE "2A" RECIRC PUMP WHICH WAS CAUSED BY A BLOWN FUSE - ANTICIPATE INCREASING POWER LATER TODAY *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 0 2000-09-09 MAINTENANCE OUTAGE *
Oyster Creek 86 COASTDOWN TO REFUELING OUTAGE *
Peach Bottom 2 73 COASTDOWN TO REFUELING OUTAGE *
Peach Bottom 3 100
Pilgrim 1 100 *
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100 *
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2000-09-09 MAINTENANCE OUTAGE - COOLDOWN TO MODE 5 IN PROGRESS *
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 98 COASTDOWN TO REFUELING OUTAGE *
Hatch 2 100
McGuire 1 100
McGuire 2 0 2000-09-01 REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS *
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 89 REDUCED POWER FOR TURBINE VALVE TESTING *
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100 .
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 87 COASTDOWN TO REFUELING OUTAGE
Vogtle 2 100
Watts Bar 1 0 2000-09-09 REFUELING OUTAGE - COOLDOWN IN PROGRESS *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 84 COASTDOWN TO REFUELING OUTAGE *
Byron 2 100
Clinton 91 INCREASING POWER TO 100% *
D.C. Cook 1 0 1997-09-08 REFUELING OUTAGE - DEFUELED
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 88 COASTDOWN TO REFUELING OUTAGE *
Duane Arnold 100
Fermi 2 100
Kewaunee 96 MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES *
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 0 2000-09-05 FORCED MAINTENANCE OUTAGE - STARTED TWO REACTOR COOLANT PUMPS - HEATUP IN PROGRESS *
Perry 1 70 REDUCED POWER FOR ROD SEQUENCE EXCHANGE - PRIOR ADMINISTRATIVE POWER LIMIT IS 98% *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 93 COASTDOWN TO REFUELING OUTAGE
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 99
Callaway 99 INCREASING POWER TO 100% *
Columbia Generating Station 78 REDUCED POWER FOR ROD SEQUENCE EXCHANGE *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 70 REDUCED POWER FOR TURBINE VALVE TESTING *
Diablo Canyon 1 100
Diablo Canyon 2 0 2000-09-05 FORCED MAINTENANCE OUTAGE
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 99
Palo Verde 3 99
River Bend 1 100
San Onofre 2 100
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100 *
Wolf Creek 1 98 *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.