UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Beaver Valley 1 |
100 |
|
|
|
|
| Beaver Valley 2 |
94 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
| Calvert Cliffs 1 |
100 |
|
|
|
|
| Calvert Cliffs 2 |
100 |
|
|
|
|
| FitzPatrick |
100 |
|
|
|
|
| Ginna |
88 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Hope Creek 1 |
100 |
|
|
|
|
| Indian Point 2 |
0 |
2000-02-15 |
DEFUELED |
|
|
| Indian Point 3 |
100 |
|
|
|
|
| Limerick 1 |
100 |
|
|
|
|
| Limerick 2 |
100 |
|
|
|
|
| Millstone 2 |
100 |
|
|
|
|
| Millstone 3 |
100 |
|
|
|
|
| Nine Mile Point 1 |
100 |
|
|
|
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
100 |
|
|
|
|
| Peach Bottom 2 |
75 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Peach Bottom 3 |
100 |
|
|
|
|
| Pilgrim 1 |
100 |
|
|
|
|
| Salem 1 |
100 |
|
|
|
|
| Salem 2 |
100 |
|
|
|
|
| Seabrook 1 |
100 |
|
|
|
|
| Susquehanna 1 |
100 |
|
|
|
|
| Susquehanna 2 |
100 |
|
|
|
|
| Three Mile Island 1 |
100 |
|
|
|
|
| Vermont Yankee |
100 |
|
|
|
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Browns Ferry 1 |
0 |
1985-03-03 |
DEFUELED |
|
|
| Browns Ferry 2 |
100 |
|
|
* |
|
| Browns Ferry 3 |
47 |
|
HOLDING POWER AT THIS LEVEL DUE TO A RECIRCULATION PUMP TRIP |
* |
|
| Brunswick 1 |
100 |
|
|
|
|
| Brunswick 2 |
100 |
|
|
|
|
| Catawba 1 |
100 |
|
|
|
|
| Catawba 2 |
100 |
|
|
|
|
| Crystal River 3 |
100 |
|
|
|
|
| Farley 1 |
100 |
|
|
|
|
| Farley 2 |
100 |
|
|
|
|
| Harris 1 |
100 |
|
|
|
|
| Hatch 1 |
100 |
|
|
|
|
| Hatch 2 |
100 |
|
|
|
|
| McGuire 1 |
100 |
|
|
|
|
| McGuire 2 |
0 |
2000-09-01 |
REFUELING OUTAGE |
* |
|
| North Anna 1 |
100 |
|
|
|
|
| North Anna 2 |
100 |
|
|
|
|
| Oconee 1 |
100 |
|
|
|
|
| Oconee 2 |
100 |
|
|
|
|
| Oconee 3 |
100 |
|
|
|
|
| Robinson 2 |
100 |
|
|
|
|
| Saint Lucie 1 |
100 |
|
|
|
|
| Saint Lucie 2 |
92 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING |
* |
|
| Sequoyah 1 |
100 |
|
|
|
|
| Sequoyah 2 |
100 |
|
|
|
|
| Summer |
100 |
|
|
|
|
| Surry 1 |
100 |
|
|
|
|
| Surry 2 |
100 |
|
|
|
|
| Turkey Point 3 |
100 |
|
|
|
|
| Turkey Point 4 |
100 |
|
|
|
|
| Vogtle 1 |
91 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Vogtle 2 |
100 |
|
|
|
|
| Watts Bar 1 |
77 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Braidwood 1 |
100 |
|
|
|
|
| Braidwood 2 |
100 |
|
|
|
|
| Byron 1 |
88 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Byron 2 |
100 |
|
|
* |
|
| Clinton |
100 |
|
|
|
|
| D.C. Cook 1 |
0 |
1997-09-08 |
REFUELING OUTAGE - DEFUELED |
|
|
| D.C. Cook 2 |
100 |
|
|
|
|
| Davis-Besse |
100 |
|
|
|
|
| Dresden 2 |
100 |
|
|
|
|
| Dresden 3 |
91 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Duane Arnold |
100 |
|
|
|
|
| Fermi 2 |
100 |
|
|
|
|
| Kewaunee |
96 |
|
MAXIMUM POWER DUE TO PLUGGED STEAM GENERATOR TUBES |
|
|
| La Salle 1 |
100 |
|
|
|
|
| La Salle 2 |
100 |
|
|
|
|
| Monticello |
100 |
|
|
|
|
| Palisades |
0 |
2000-09-05 |
FORCED MAINTENANCE OUTAGE - TECH SPEC REQUIRED SHUTDOWN DUE TO THE POTENTIAL FOR LOOSE PARTS AFFECTING EMERGENCY CORE COOLING SYSTEM OPERABILITY - PROBLEM WITH THE COMMON MINIMUM FLOW VALVE FOR THE 'A' SAFEGUARDS PUMPS (REFER TO EVENT #37291) |
* |
|
| Perry 1 |
98 |
|
|
|
|
| Point Beach 1 |
100 |
|
|
|
|
| Point Beach 2 |
100 |
|
|
|
|
| Prairie Island 1 |
100 |
|
|
|
|
| Prairie Island 2 |
100 |
|
|
|
|
| Quad Cities 1 |
94 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
| Quad Cities 2 |
100 |
|
|
* |
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Arkansas Nuclear 1 |
100 |
|
|
|
|
| Arkansas Nuclear 2 |
99 |
|
|
|
|
| Callaway |
100 |
|
|
|
|
| Columbia Generating Station |
7 |
|
EXITING A PLANNED MAINTENANCE OUTAGE - 'A' RECIRCULATION PUMP UPPER SEAL REPAIRS ARE COMPLETE. |
* |
|
| Comanche Peak 1 |
100 |
|
|
|
|
| Comanche Peak 2 |
100 |
|
|
|
|
| Cooper |
100 |
|
|
|
|
| Diablo Canyon 1 |
100 |
|
|
|
|
| Diablo Canyon 2 |
0 |
2000-09-05 |
FORCED MAINTENANCE OUTAGE TO REPAIR A STEAM LEAK ON THE EXTRACTION LINE TO THE 4A FEEDWATER HEATER |
* |
|
| Fort Calhoun |
100 |
|
|
|
|
| Grand Gulf 1 |
93 |
|
HOLDING POWER - DE-RATED DUE TO HOTWELL TEMPERATURE CONCERNS |
|
|
| Palo Verde 1 |
100 |
|
|
|
|
| Palo Verde 2 |
99 |
|
|
|
|
| Palo Verde 3 |
99 |
|
|
|
|
| River Bend 1 |
100 |
|
|
|
|
| San Onofre 2 |
100 |
|
|
|
|
| San Onofre 3 |
100 |
|
|
|
|
| South Texas 1 |
100 |
|
|
|
|
| South Texas 2 |
100 |
|
|
|
|
| Waterford 3 |
100 |
|
|
|
|
| Wolf Creek 1 |
8 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM AUXILIARY TRANSFORMER REPAIRS |
* |
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.