Skip to main content

Power Reactor Status Report for June 03, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 93 REDUCED POWER FOR WATERBOX CLEANING AND TURBINE VALVE TESTING *
FitzPatrick 100
Ginna 100
Hope Creek 1 0 2000-06-01 MAIN TRANSFORMER REPAIR IN PROGRESS *
Indian Point 2 0 2000-02-15 REFUELING OUTAGE - DEFUELED
Indian Point 3 2 HOLDING POWER WITH GENERATOR OFFLINE TO REPAIR STEAM LEAK ON HEATER DRAIN TANK *
Limerick 1 100
Limerick 2 100
Millstone 2 50 HOLDING POWER TO CORRECT FEEDWATER HEATER PROBLEM - WILL INCREASE POWER TO 65% FOR ADDITIONAL REACTOR ENGINEERING CALCULATIONS *
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 19 HOLDING POWER WITH TURBINE OFFLINE FOR EHC SYSTEM LEAK REPAIR *
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100 *
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100 *
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 0 2000-06-02 MAINTENANCE OUTAGE - COOLDOWN IN PROGRESS *
D.C. Cook 1 0 1997-09-08 REFUELING OUTAGE - DEFUELED
D.C. Cook 2 0 1997-09-09 REFUELING OUTAGE
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Duane Arnold 100 *
Fermi 2 100
Kewaunee 32 HOLDING POWER FOR CHEMISTRY SOAK OF STEAM GENERATORS FOLLOWING OUTAGE *
La Salle 1 100
La Salle 2 100 REDUCING POWER TO 85% FOR SURVEILLANCE TESTING *
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 0 2000-04-28 REFUELING OUTAGE
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 86 REDUCING POWER TO 85% FOR ROD SEQUENCE EXCHANGE AND OTHER PLANNED MAINTENANCE *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
San Onofre 2 100
San Onofre 3 100
South Texas 1 100
South Texas 2 8 HOLDING POWER FOR REPAIR OF EXCESSIVE HYDROGEN LEAKAGE ON MAIN GENERATOR *
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.