Skip to main content

Power Reactor Status Report for October 23, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 1999-10-22 GOING TO A COLD SHUTDOWN CONDITION TO REPAIR A PRESSURIZER SAFETY VALVE *
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100
FitzPatrick 1 STARTUP IN PROGRESS. RANGE 7 ON IRMs *
Ginna 100
Hope Creek 1 100
Indian Point 2 99 TURBINE CONTROL VALVES FULLY OPEN
Indian Point 3 44 HOLDING POWER LEVEL BECAUSE THEY ARE AT THEIR QUADRANT POWER TILT RATIO LIMIT *
Limerick 1 100
Limerick 2 95 REDUCING REACTOR POWER LEVEL TO 80% TO PERFORM A ROD PATTERN ADJUSTMENT *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100 *
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 0 1999-09-29 EXITING REFUELING OUTAGE - REACTOR VESSEL HEAD TENSIONED *
Pilgrim 1 100
Salem 1 0 1999-09-17 EXITING REFUELING OUTAGE
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 100 *
Vermont Yankee 96 COASTDOWN TO REFUELING OUTAGE

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Crystal River 3 0 1999-10-01 REFUELING OUTAGE - DEFUELED
Farley 1 100
Farley 2 0 1999-10-15 ENTERING REFUELING OUTAGE
Harris 1 100
Hatch 1 100
Hatch 2 98 MAXIMUM OPERATING POWER
McGuire 1 0 1999-09-17 REFUELING OUTAGE - DEFUELED
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 0 1999-09-24 EXITING REFUELING OUTAGE
Saint Lucie 1 100
Saint Lucie 2 100 *
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 0 1999-10-03 REFUELING OUTAGE - DEFUELED
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100 *
Byron 2 0 1999-10-23 ENTERING REFUELING OUTAGE *
Clinton 100
D.C. Cook 1 0 1997-09-08 REFUELING OUTAGE - DEFUELED
D.C. Cook 2 0 1997-09-09 REFUELING OUTAGE - DEFUELED
Davis-Besse 10 MAIN TURBINE OFF LINE - REPAIRING SEAL OIL LEAK ON THE MAIN GENERATOR *
Dresden 2 0 1999-10-01 REACTOR VESSEL HEAD HAS BEEN TENSIONED. *
Dresden 3 100
Duane Arnold 0 1999-10-22 ENTERING REFUELING OUTAGE *
Fermi 2 97
Kewaunee 97
La Salle 1 0 1999-10-22 ENTERING REFUELING OUTAGE *
La Salle 2 100
Monticello 100
Palisades 0 1999-10-15 REFUELING OUTAGE - GOING TO MID LOOP OPERATION TO INSTALL STEAM GENERATOR NOZZLE DAMS. *
Perry 1 100
Point Beach 1 0 1999-10-15 ENTERING REFUELING OUTAGE
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 1999-10-02 EXITING REFUELING OUTAGE *
Columbia Generating Station 1 STARTUP IN PROGRESS - CURRENTLY AT RANGE 7 ON IRMs. *
Comanche Peak 1 0 1999-09-24 EXITING REFUELING OUTAGE *
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 1999-09-25 EXITING REFUELING OUTAGE *
Fort Calhoun 0 1999-10-01 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS *
Grand Gulf 1 0 1999-10-22 ENTERING REFUELING OUTAGE *
Palo Verde 1 0 1999-10-02 REFUELING OUTAGE - DEFUELED
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
San Onofre 2 100
San Onofre 3 100
South Texas 1 100
South Texas 2 0 1999-10-12 REFUELING OUTAGE - DEFUELED
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.