UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Beaver Valley 1 |
62 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED MAINTENANCE ON A FEEDWATER PUMP - MAINTENANCE COMPLETE - PLAN TO INCREASE POWER TODAY |
* |
|
| Beaver Valley 2 |
100 |
|
|
|
|
| Calvert Cliffs 1 |
0 |
1999-05-10 |
MAINTENANCE OUTAGE |
* |
|
| Calvert Cliffs 2 |
100 |
|
|
|
|
| FitzPatrick |
100 |
|
|
|
|
| Ginna |
98 |
|
OPERATING AT REDUCED LOAD DUE TO DELTA-T SETPOINT ISSUES |
* |
|
| Hope Creek 1 |
100 |
|
|
|
|
| Indian Point 2 |
99 |
|
MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES FULLY OPEN |
|
|
| Indian Point 3 |
63 |
|
HOLDING POWER AT THIS LEVEL DUE TO A HEATER DRAIN TANK PUMP TRIP |
* |
|
| Limerick 1 |
100 |
|
|
|
|
| Limerick 2 |
0 |
1999-04-16 |
REFUELING OUTAGE - REACTOR VESSEL HEAD IN PLACE BUT NOT TENSIONED |
* |
|
| Millstone 2 |
63 |
|
INCREASING POWER TO 75% FOR AN NRC HOLD |
* |
|
| Millstone 3 |
0 |
1999-05-01 |
REFUELING OUTAGE - FUEL OFFLOAD SUSPENDED DUE TO PROBLEMS WITH SIGMA MACHINE |
|
|
| Nine Mile Point 1 |
0 |
1999-04-11 |
REFUELING OUTAGE - DEFUELED |
|
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
100 |
|
|
* |
|
| Peach Bottom 2 |
100 |
|
|
|
|
| Peach Bottom 3 |
100 |
|
|
|
|
| Pilgrim 1 |
0 |
1999-05-08 |
REFUELING OUTAGE - FIRST PHASE OF FUEL SHUFFLE COMPLETE |
* |
|
| Salem 1 |
100 |
|
|
|
|
| Salem 2 |
0 |
1999-04-03 |
REFUELING OUTAGE |
|
|
| Seabrook 1 |
89 |
|
INCREASING POWER AFTER EXITING A REFUELING OUTAGE |
* |
|
| Susquehanna 1 |
100 |
|
|
|
|
| Susquehanna 2 |
100 |
|
|
|
|
| Three Mile Island 1 |
100 |
|
|
|
|
| Vermont Yankee |
100 |
|
|
|
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Browns Ferry 1 |
0 |
1985-03-03 |
DEFUELED |
|
|
| Browns Ferry 2 |
60 |
|
INCREASING POWER AFTER RECOVERING FROM AN AUTOMATIC TURBINE TRIP/REACTOR SCRAM FROM 100% POWER DURING MAIN TURBINE OVERSPEED TESTING ON 05/15/99 (REFER TO EVENT #35720) - CAUSE DETERMINED TO BE A PROBLEM WITH A LINKAGE IN THE TRIP MECHANISM |
* |
|
| Browns Ferry 3 |
100 |
|
|
|
|
| Brunswick 1 |
100 |
|
|
|
|
| Brunswick 2 |
0 |
1999-04-16 |
REFUELING OUTAGE |
|
|
| Catawba 1 |
0 |
1999-04-21 |
REFUELING OUTAGE |
|
|
| Catawba 2 |
0 |
1999-05-03 |
MAINTENANCE OUTAGE - EXPERIENCING GENERATOR PROBLEMS |
* |
|
| Crystal River 3 |
100 |
|
|
|
|
| Farley 1 |
100 |
|
|
|
|
| Farley 2 |
100 |
|
|
|
|
| Harris 1 |
100 |
|
|
|
|
| Hatch 1 |
97 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM POWER UPRATE TESTING |
|
|
| Hatch 2 |
98 |
|
MAXIMUM OPERATING POWER |
|
|
| McGuire 1 |
100 |
|
|
|
|
| McGuire 2 |
100 |
|
|
|
|
| North Anna 1 |
100 |
|
|
|
|
| North Anna 2 |
100 |
|
|
|
|
| Oconee 1 |
100 |
|
|
|
|
| Oconee 2 |
100 |
|
|
|
|
| Oconee 3 |
50 |
|
INCREASING POWER AFTER EXITING A FORCED MAINTENANCE OUTAGE DUE TO LOW REACTOR COOLANT PUMP OIL LEVEL - OUTAGE BEGAN ON 05/15/99 |
* |
|
| Robinson 2 |
100 |
|
|
|
|
| Saint Lucie 1 |
100 |
|
|
|
|
| Saint Lucie 2 |
100 |
|
|
|
|
| Sequoyah 1 |
100 |
|
|
|
|
| Sequoyah 2 |
100 |
|
|
|
|
| Summer |
73 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM FLUX MAPPING AFTER EXITING A REFUELING OUTAGE |
|
|
| Surry 1 |
100 |
|
|
|
|
| Surry 2 |
0 |
1999-04-18 |
REFUELING OUTAGE |
|
|
| Turkey Point 3 |
100 |
|
|
|
|
| Turkey Point 4 |
100 |
|
|
|
|
| Vogtle 1 |
100 |
|
|
|
|
| Vogtle 2 |
100 |
|
|
|
|
| Watts Bar 1 |
100 |
|
|
|
|
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Braidwood 1 |
100 |
|
LOAD REDUCED TO 15% ON 05/16/99 DUE TO A TECH SPEC REQUIRED SHUTDOWN RESULTING FROM SMALL AIR POCKETS IN THE HIGH AREAS OF THE COMMON RESIDUAL HEAT REMOVAL INJECTION LINES (REFER TO EVENT #35724) - NOTICE OF ENFORCEMENT DISCRETION GRANTED ON 05/16/99 |
* |
|
| Braidwood 2 |
0 |
1999-04-23 |
REFUELING OUTAGE |
|
|
| Byron 1 |
0 |
1999-05-13 |
AUTOMATIC REACTOR TRIP FROM 100% POWER DUE TO AN INADVERTENT POWER RANGE HIGH FLUX SIGNAL DURING SURVEILLANCE TESTING (REFER TO EVENT #35710) - CAUSE DETERMINED TO BE PERSONNEL ERROR |
* |
|
| Byron 2 |
100 |
|
|
|
|
| Clinton |
0 |
1999-05-14 |
REFUELING OUTAGE - MANUAL REACTOR SCRAM FROM 4% POWER DUE TO A LEVEL TRANSIENT ASSOCIATED WITH A FEED REGULATING VALVE MALFUNCTION (REFER TO EVENT #35715) - CAUSE DETERMINED TO BE BINDING ON PART OF VALVE THAT GIVES FEEDBACK TO CONTROL SYSTEM |
|
|
| D.C. Cook 1 |
0 |
1997-09-08 |
MAINTENANCE OUTAGE |
|
|
| D.C. Cook 2 |
0 |
1997-09-09 |
REFUELING OUTAGE |
|
|
| Davis-Besse |
100 |
|
|
|
|
| Dresden 2 |
100 |
|
|
* |
|
| Dresden 3 |
99 |
|
|
* |
|
| Duane Arnold |
100 |
|
|
|
|
| Fermi 2 |
97 |
|
ADMINISTRATIVE POWER LIMIT |
|
|
| Kewaunee |
97 |
|
POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING |
|
|
| La Salle 1 |
100 |
|
|
|
|
| La Salle 2 |
100 |
|
|
|
|
| Monticello |
0 |
1999-05-08 |
MAINTENANCE OUTAGE |
|
|
| Palisades |
0 |
1999-05-07 |
MAINTENANCE OUTAGE - AT NORMAL OPERATING TEMPERATURE AND PRESSURE |
* |
|
| Perry 1 |
100 |
|
|
|
|
| Point Beach 1 |
0 |
1999-05-14 |
MANUAL REACTOR TRIP FROM 100% POWER AND MANUAL SAFETY INJECTION DUE TO A STEAM LEAK ON THE 4B FEEDWATER HEATER STEAM SIDE (REFER TO EVENT #35714) - BREAK REPORTED TO BE 27" LONG AND APPROXIMATELY ½" WIDE |
|
|
| Point Beach 2 |
30 |
|
HOLDING POWER AT THIS LEVEL FOLLOWING INSPECTION OF THE #4 FEEDWATER HEATERS - HEATERS IN SATISFACTORY CONDITION - PLAN TO TAKE UNIT OFF LINE TODAY, RESTORE SECONDARY SYSTEMS, AND RETURN UNIT TO SERVICE |
* |
|
| Prairie Island 1 |
0 |
1999-04-16 |
REFUELING OUTAGE - REACTOR VESSEL HEAD ON AND TENSIONED - PREPARING FOR FILL AND VENT |
* |
|
| Prairie Island 2 |
100 |
|
|
|
|
| Quad Cities 1 |
100 |
|
|
|
|
| Quad Cities 2 |
100 |
|
|
|
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Arkansas Nuclear 1 |
100 |
|
|
|
|
| Arkansas Nuclear 2 |
100 |
|
|
|
|
| Callaway |
100 |
|
|
|
|
| Columbia Generating Station |
0 |
1999-04-17 |
MAINTENANCE OUTAGE |
|
|
| Comanche Peak 1 |
100 |
|
|
|
|
| Comanche Peak 2 |
100 |
|
|
|
|
| Cooper |
100 |
|
|
|
|
| Diablo Canyon 1 |
100 |
|
|
|
|
| Diablo Canyon 2 |
100 |
|
|
|
|
| Fort Calhoun |
100 |
|
|
|
|
| Grand Gulf 1 |
100 |
|
|
|
|
| Palo Verde 1 |
100 |
|
|
|
|
| Palo Verde 2 |
100 |
|
|
|
|
| Palo Verde 3 |
100 |
|
|
|
|
| River Bend 1 |
0 |
1999-04-03 |
REFUELING OUTAGE - PLAN TO RECOMMENCE FUEL SHUFFLE ON DAY SHIFT |
* |
|
| San Onofre 2 |
100 |
|
|
|
|
| San Onofre 3 |
60 |
|
INCREASING POWER AFTER RECOVERING FROM A MANUAL REACTOR TRIP FROM 24% POWER ON 05/15/99 WHEN A FEED REG VALVE FAILED OPEN (REFER TO EVENT #35721) - CAUSE DETERMINED TO BE A FEED REG VALVE POSITIONER PROBLEM (RELAY FAILURE CAUSED #35713 TRIP ON 05/13/99) |
* |
|
| South Texas 1 |
12 |
|
UNIT ON LINE AND INCREASING POWER AFTER RECOVERING FROM AN AUTOMATIC REACTOR FROM 100% POWER DUE TO LOSS OF A REACTOR COOLANT PUMP FROM UNDERVOLTAGE ON AUXILIARY BUS ON 05/16/99 (REFER TO EVENT #35722) - CAUSED BY A BLOWN FUSE IN POTENTIAL TRANSFORMER |
* |
|
| South Texas 2 |
100 |
|
|
|
|
| Waterford 3 |
93 |
|
DECREASING TO 90% POWER TO PERFORM WORK ON A MAIN TURBINE GOVERNOR VALVE |
* |
|
| Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.