Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 0 1999-05-01 SHUTDOWN DUE TO PROBLEMS WITH THE MAIN TURBINE SEAL OIL SYSTEM. *
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 0 1999-03-12 REFUELING OUTAGE
FitzPatrick 100
Ginna 25 ENTERED AND EXITED TECHNICAL SPECIFICATION SHUTDOWN. SEE EVENT # 35668 FOR DETAILS. *
Hope Creek 1 100
Indian Point 2 99
Indian Point 3 100
Limerick 1 100
Limerick 2 0 1999-04-16 REFUELING OUTAGE
Millstone 2 0 1996-02-20 PLANT STARTUP ON HOLD
Millstone 3 0 1999-05-01 ENTERING REFUELING OUTAGE
Nine Mile Point 1 0 1999-04-11 REFUELING OUTAGE - DEFUELED
Nine Mile Point 2 15 SYNCHRONIZED TO THE GRID. *
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 80 INOPERABLE MAIN STEAM ISOLATION VALVE
Salem 1 100
Salem 2 0 1999-04-03 REFUELING OUTAGE
Seabrook 1 0 1999-03-27 REFUELING OUTAGE *
Susquehanna 1 100
Susquehanna 2 100 *
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 0 1999-04-11 REFUELING OUTAGE
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 0 1999-04-16 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *
Catawba 1 0 1999-04-21 REFUELING OUTAGE
Catawba 2 9 EXPERIENCED A FULL LOAD REJECTION WHEN THE MAIN GENERATOR OUTPUT BREAKERS OPENED AT 1815 HOURS ON 05/03/99. LICENSEE INVESTIGATING WHY THE MAIN GENERATOR BREAKERS OPENED. LICENSEE STABILIZED REACTOR POWER AT 9%. *
Crystal River 3 100
Farley 1 100 *
Farley 2 49 OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD *
Harris 1 100
Hatch 1 59 SLOWLY INCREASING REACTOR POWER LEVEL DUE TO MSR RELATED PROBLEM. *
Hatch 2 98 MAXIMUM OPERATING POWER
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 1999-04-18 EXITING REFUELING OUTAGE *
Summer 0 1999-04-03 EXITING REFUELING OUTAGE
Surry 1 100
Surry 2 0 1999-04-18 REFUELING OUTAGE - DEFUELED
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 0 1999-04-23 REFUELING OUTAGE
Byron 1 95 REDUCED REACTOR POWER LEVEL TO SWAP MAIN FEEDWATER PUMPS (TAKING THE MOTOR DRIVEN PUMP OUT OF SERVICE AND PLACING THE TURBINE DRIVEN PUMP INTO SERVICE) *
Byron 2 100
Clinton 0 1996-09-06 INSERTING ALL CONTROL RODS. WILL INVESTIGATE SRM AND PERIOD INDICATION PROBLEM. LICENSEE WILL REMAIN IN STARTUP MODE. *
D.C. Cook 1 0 1997-09-08 MAINTENANCE OUTAGE
D.C. Cook 2 0 1997-09-09 REFUELING OUTAGE
Davis-Besse 0 1999-04-23 MAINTENANCE OUTAGE
Dresden 2 100
Dresden 3 93 REDUCED REACTOR POWER LEVEL DOWN TO 88% BEFORE NOED WAS GRANTED DUE TO A TECH SPEC REQUIRED SHUTDOWN. SEE EVENT # 35667 FOR DETAILS WHY THE LICENSEE WAS IN A REQUIRED TECH SPEC SHUTDOWN. *
Duane Arnold 100
Fermi 2 97 ADMINISTRATIVE POWER LIMIT
Kewaunee 97
La Salle 1 100
La Salle 2 100 *
Monticello 100
Palisades 100
Perry 1 28 INCREASING REACTOR POWER LEVEL *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 0 1999-04-16 REFUELING OUTAGE
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 0 1999-04-17 MAINTENANCE OUTAGE
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 58 INCREASING REACTOR POWER LEVEL *
Palo Verde 3 100
River Bend 1 0 1999-04-03 REFUELING OUTAGE
San Onofre 2 100
San Onofre 3 0 1999-03-27 REFUELING OUTAGE
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 0 1999-04-03 REFUELING OUTAGE

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.