Power Reactor Status Report for March 25, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 98 POWER LIMITED DUE TO A MOISTURE SEPARATOR REHEATER BEING OUT OF SERVICE
Beaver Valley 2 0 1999-02-26 EXITING REFUELING OUTAGE *
Calvert Cliffs 1 100
Calvert Cliffs 2 0 1999-03-12 REFUELING OUTAGE
FitzPatrick 100
Ginna 0 1999-03-01 REFUELING OUTAGE - DEFUELED
Hope Creek 1 0 1999-02-12 REFUELING OUTAGE -REFUELED
Indian Point 2 99 MAXIMUM OPERATING POWER
Indian Point 3 100
Limerick 1 100
Limerick 2 89 COASTDOWN TO REFUELING OUTAGE
Millstone 2 0 1996-02-20 REFUELING OUTAGE - PREPARING TO GO TO MODE 4
Millstone 3 100
Nine Mile Point 1 91 REDUCED REACTOR POWER FOR ROD PATTERN ADJUSTMENT *
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 80 PROBLEM WITH DEBRIS IN THE INTAKE
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 0 1999-03-12 REFUELING OUTAGE
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 87 COASTDOWN TO REFUELING OUTAGE *
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 98 COASTDOWN TO REFUELING OUTAGE
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 49 WILL OPERATE AT THIS POWER FOR 40 DAYS TO AVOID COASTDOWN DURING PEAK AUGUST DEMAND PERIOD *
Harris 1 100
Hatch 1 0 1999-03-01 REFUELING OUTAGE- FUEL SHUFFLE IN PROGRESS
Hatch 2 98 MAXIMUM OPERATING POWER
McGuire 1 100
McGuire 2 0 1999-03-12 REFUELING OUTAGE
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 74 COASTDOWN TO REFUELING OUTAGE *
Summer 94 COASTDOWN TO REFUELING OUTAGE
Surry 1 100
Surry 2 80 COASTDOWN TO REFUELING OUTAGE *
Turkey Point 3 100
Turkey Point 4 0 1999-03-15 REFUELING OUTAGE
Vogtle 1 0 1999-02-27 EXITING REFUELING OUTAGE
Vogtle 2 100
Watts Bar 1 0 1999-02-27 REFUELING OUTAGE

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 97 INCREASING REACTOR POWER LEVEL AFTER TURBINE TESTING *
Byron 2 100
Clinton 0 1996-09-06 REFUELING OUTAGE
D.C. Cook 1 0 1997-09-08 MAINTENANCE OUTAGE
D.C. Cook 2 0 1997-09-09 REFUELING OUTAGE
Davis-Besse 100
Dresden 2 99 *
Dresden 3 52 INCREASING REACTOR POWER LEVEL *
Duane Arnold 100
Fermi 2 97 POWER LIMITED DUE TO POWER UPRATE ISSUES
Kewaunee 97 POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING
La Salle 1 100
La Salle 2 0 1996-09-20 REFUELING OUTAGE - DEFUELED
Monticello 100
Palisades 100
Perry 1 88 COASTDOWN TO REFUELING OUTAGE
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100 *
Callaway 100
Columbia Generating Station 85 LOAD FOLLOWING
Comanche Peak 1 100
Comanche Peak 2 0 1999-03-20 ENTERING REFUELING OUTAGE
Cooper 100
Diablo Canyon 1 100 *
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 93 COASTDOWN TO REFUELING OUTAGE
Palo Verde 3 100
River Bend 1 78 POWER SUPPRESSED DUE TO FUEL LEAKERS
San Onofre 2 100
San Onofre 3 90 LOWERED REACTOR POWER LEVEL TO CHECK MAIN STEAM SAFETY VALVE SETPOINTS (SIMMER TESTING). *
South Texas 1 83 COASTDOWN TO REFUELING OUTAGE *
South Texas 2 100
Waterford 3 0 1999-02-19 EXITING REFUELING OUTAGE *
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.