Power Reactor Status Report for March 23, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 98 POWER LIMITED DUE TO A MOISTURE SEPARATOR REHEATER BEING OUT OF SERVICE
Beaver Valley 2 0 1999-02-26 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS
Calvert Cliffs 1 100
Calvert Cliffs 2 0 1999-03-12 REFUELING OUTAGE
FitzPatrick 100
Ginna 0 1999-03-01 REFUELING OUTAGE - DEFUELED
Hope Creek 1 0 1999-02-12 REFUELING OUTAGE -REFUELED
Indian Point 2 99 MAXIMUM OPERATING POWER
Indian Point 3 100
Limerick 1 100
Limerick 2 89 COASTDOWN TO REFUELING OUTAGE *
Millstone 2 0 1996-02-20 REFUELING OUTAGE - PREPARING TO GO TO MODE 4
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 80 PROBLEM WITH DEBRIS IN THE INTAKE
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 0 1999-03-12 REFUELING OUTAGE - CORE ALTERATIONS IN PROGRESS
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 0 1985-03-03 DEFUELED
Browns Ferry 2 89 COASTDOWN TO REFUELING OUTAGE
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 98 COASTDOWN *
Catawba 1 100
Catawba 2 100
Crystal River 3 100
Farley 1 100
Farley 2 50 WILL OPERATE AT THIS POWER FOR 45 DAYS TO AVOID COASTDOWN DURING PEAK AUGUST DEMAND PERIOD
Harris 1 100
Hatch 1 0 1999-03-01 REFUELING OUTAGE
Hatch 2 98 MAXIMUM OPERATING POWER
McGuire 1 100
McGuire 2 0 1999-03-12 REFUELING OUTAGE
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 98 REDUCED POWER FOR TURBINE VALVE TEST *
Sequoyah 1 100
Sequoyah 2 75 COASTDOWN TO REFUELING OUTAGE *
Summer 95 COASTDOWN TO REFUELING OUTAGE *
Surry 1 100
Surry 2 81 COASTDOWN TO REFUELING OUTAGE *
Turkey Point 3 100
Turkey Point 4 0 1999-03-15 REFUELING OUTAGE
Vogtle 1 0 1999-02-27 REFUELING OUTAGE - FUEL RELOAD COMPLETE *
Vogtle 2 100
Watts Bar 1 0 1999-02-27 REFUELING OUTAGE - REFUELING

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 94 REDUCED POWER FOR STEAM GENERATOR SAFETY TESTING *
Byron 2 100
Clinton 0 1996-09-06 REFUELING OUTAGE
D.C. Cook 1 0 1997-09-08 MAINTENANCE OUTAGE
D.C. Cook 2 0 1997-09-09 REFUELING OUTAGE
Davis-Besse 100
Dresden 2 100 *
Dresden 3 0 1999-03-21 SHUTDOWN DUE TO TS REQUIREMENT FOR DRYWELL LEAKAGE REPAIR - SEE EVENT #35496
Duane Arnold 100
Fermi 2 97 POWER LIMITED DUE TO POWER UPRATE ISSUES
Kewaunee 97 POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING
La Salle 1 100
La Salle 2 0 1996-09-20 REFUELING OUTAGE - DEFUELED
Monticello 100
Palisades 100
Perry 1 89 COASTDOWN TO REFUELING OUTAGE
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 99 *
Quad Cities 2 99 *

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 85 LOAD FOLLOW *
Comanche Peak 1 100
Comanche Peak 2 0 1999-03-20 SHUTDOWN FOR REFUELING OUTAGE
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 92 COASTDOWN *
Palo Verde 3 100
River Bend 1 79 POWER SUPPRESSED DUE TO FUEL LEAKERS
San Onofre 2 100 *
San Onofre 3 97 *
South Texas 1 84 COASTDOWN TO REFUELING OUTAGE *
South Texas 2 100
Waterford 3 0 1999-02-19 REFUELING OUTAGE - REACTOR VESSEL REASSEMBLED *
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.