UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Beaver Valley 1 |
99 |
|
MAXIMUM OPERATING POWER |
* |
|
| Beaver Valley 2 |
0 |
1999-02-26 |
REFUELING OUTAGE - DEFUELED |
|
|
| Calvert Cliffs 1 |
100 |
|
|
|
|
| Calvert Cliffs 2 |
0 |
1999-03-12 |
ENTERING REFUELING OUTAGE |
|
|
| FitzPatrick |
100 |
|
|
|
|
| Ginna |
0 |
1999-03-01 |
REFUELING OUTAGE - DEFUELED |
|
|
| Hope Creek 1 |
0 |
1999-02-12 |
REFUELING OUTAGE - FUEL LOAD IN PROGRESS |
* |
|
| Indian Point 2 |
100 |
|
|
* |
|
| Indian Point 3 |
58 |
|
HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT A MAIN FEEDWATER PUMP DISCHARGE VALVE PROBLEM |
* |
|
| Limerick 1 |
100 |
|
|
|
|
| Limerick 2 |
93 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Millstone 2 |
0 |
1996-02-20 |
REFUELING OUTAGE |
|
|
| Millstone 3 |
100 |
|
|
|
|
| Nine Mile Point 1 |
100 |
|
|
|
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
100 |
|
|
|
|
| Peach Bottom 2 |
100 |
|
|
|
|
| Peach Bottom 3 |
100 |
|
|
* |
|
| Pilgrim 1 |
100 |
|
|
|
|
| Salem 1 |
100 |
|
|
|
|
| Salem 2 |
100 |
|
|
|
|
| Seabrook 1 |
100 |
|
|
|
|
| Susquehanna 1 |
100 |
|
|
|
|
| Susquehanna 2 |
0 |
1999-03-12 |
REFUELING OUTAGE - REACTOR VESSEL HEAD REMOVAL IN PROGRESS |
* |
|
| Three Mile Island 1 |
100 |
|
|
|
|
| Vermont Yankee |
100 |
|
|
|
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Browns Ferry 1 |
0 |
1985-03-03 |
DEFUELED |
|
|
| Browns Ferry 2 |
93 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Browns Ferry 3 |
100 |
|
|
|
|
| Brunswick 1 |
100 |
|
|
|
|
| Brunswick 2 |
100 |
|
|
* |
|
| Catawba 1 |
100 |
|
|
|
|
| Catawba 2 |
100 |
|
|
|
|
| Crystal River 3 |
100 |
|
|
|
|
| Farley 1 |
100 |
|
|
|
|
| Farley 2 |
100 |
|
|
|
|
| Harris 1 |
0 |
1999-03-12 |
MAINTENANCE OUTAGE DUE TO AN AUTOMATIC REACTOR TRIP/TURBINE TRIP FROM 100% POWER ON 03/12/99 - (REFER TO EVENT #35462) - FAILED FEEDWATER REGULATING VALVE OPERATOR POSITIONER REPLACED |
* |
|
| Hatch 1 |
0 |
1999-03-01 |
REFUELING OUTAGE - INSPECTING FUEL PRIOR TO PERFORMANCE OF A FUEL SHUFFLE |
|
|
| Hatch 2 |
98 |
|
MAXIMUM OPERATING POWER |
|
|
| McGuire 1 |
100 |
|
|
|
|
| McGuire 2 |
0 |
1999-03-12 |
ENTERING REFUELING OUTAGE |
|
|
| North Anna 1 |
98 |
|
HOLDING POWER AT THIS LEVEL TO CONVERT FROM A STEAM FLOW CALORIMETRIC TO A FEED FLOW CALORIMETRIC |
* |
|
| North Anna 2 |
100 |
|
|
|
|
| Oconee 1 |
100 |
|
|
|
|
| Oconee 2 |
100 |
|
|
|
|
| Oconee 3 |
100 |
|
|
|
|
| Robinson 2 |
99 |
|
INCREASING POWER FOLLOWING A LOAD REDUCTION TO 98% POWER FOR THE PERFORMANCE OF ROD TESTING |
* |
|
| Saint Lucie 1 |
100 |
|
|
|
|
| Saint Lucie 2 |
100 |
|
|
|
|
| Sequoyah 1 |
100 |
|
|
|
|
| Sequoyah 2 |
81 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
| Summer |
100 |
|
|
|
|
| Surry 1 |
100 |
|
|
|
|
| Surry 2 |
87 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
| Turkey Point 3 |
100 |
|
|
|
|
| Turkey Point 4 |
0 |
1999-03-15 |
ENTERING REFUELING OUTAGE |
* |
|
| Vogtle 1 |
0 |
1999-02-27 |
REFUELING OUTAGE - FUEL RELOAD COMPLETE |
* |
|
| Vogtle 2 |
100 |
|
|
|
|
| Watts Bar 1 |
0 |
1999-02-27 |
REFUELING OUTAGE - DEFUELED |
|
|
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Braidwood 1 |
100 |
|
|
|
|
| Braidwood 2 |
100 |
|
|
* |
|
| Byron 1 |
100 |
|
|
|
|
| Byron 2 |
80 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING |
* |
|
| Clinton |
0 |
1996-09-06 |
REFUELING OUTAGE |
|
|
| D.C. Cook 1 |
0 |
1997-09-08 |
MAINTENANCE OUTAGE |
|
|
| D.C. Cook 2 |
0 |
1997-09-09 |
REFUELING OUTAGE |
|
|
| Davis-Besse |
100 |
|
|
|
|
| Dresden 2 |
100 |
|
|
* |
|
| Dresden 3 |
99 |
|
MAXIMUM OPERATING POWER |
|
|
| Duane Arnold |
99 |
|
LETTING XENON BUILD IN AND INCREASING POWER FOLLOWING A REDUCTION TO APPROXIMATELY 50% TO PERFORM A ROD SEQUENCE EXCHANGE AND TURBINE VALVE TESTING |
* |
|
| Fermi 2 |
97 |
|
POWER LIMITED DUE TO POWER UPRATE ISSUES |
|
|
| Kewaunee |
98 |
|
POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING |
* |
|
| La Salle 1 |
100 |
|
|
|
|
| La Salle 2 |
0 |
1996-09-20 |
REFUELING OUTAGE - DEFUELED |
|
|
| Monticello |
100 |
|
|
|
|
| Palisades |
100 |
|
|
|
|
| Perry 1 |
92 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Point Beach 1 |
100 |
|
|
* |
|
| Point Beach 2 |
100 |
|
|
|
|
| Prairie Island 1 |
100 |
|
|
|
|
| Prairie Island 2 |
100 |
|
|
|
|
| Quad Cities 1 |
99 |
|
MAXIMUM OPERATING POWER DUE TO JET PUMP RISER BRACE LIMITATIONS |
* |
|
| Quad Cities 2 |
100 |
|
|
|
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in Report (*) |
Scrams (#) |
| Arkansas Nuclear 1 |
100 |
|
|
|
|
| Arkansas Nuclear 2 |
100 |
|
|
|
|
| Callaway |
100 |
|
|
|
|
| Columbia Generating Station |
88 |
|
INCREASING POWER AFTER HOLDING AT APPROXIMATELY 65% POWER FOR LOAD FOLLOWING |
* |
|
| Comanche Peak 1 |
100 |
|
|
|
|
| Comanche Peak 2 |
100 |
|
|
|
|
| Cooper |
100 |
|
|
|
|
| Diablo Canyon 1 |
20 |
|
UNIT ON LINE AFTER EXITING A REFUELING OUTAGE - PLAN TO INCREASE POWER FOLLOWING TAILBOARD MEETING AND TO PERFORM POWER ASCENSION TESTING WHEN 30% POWER IS ATTAINED |
* |
|
| Diablo Canyon 2 |
100 |
|
|
|
|
| Fort Calhoun |
100 |
|
|
|
|
| Grand Gulf 1 |
100 |
|
|
|
|
| Palo Verde 1 |
100 |
|
|
* |
|
| Palo Verde 2 |
100 |
|
|
|
|
| Palo Verde 3 |
99 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM HIGH RATE BLOWDOWNS |
* |
|
| River Bend 1 |
81 |
|
POWER SUPPRESSED DUE TO FUEL LEAKERS |
|
|
| San Onofre 2 |
100 |
|
|
|
|
| San Onofre 3 |
100 |
|
|
|
|
| South Texas 1 |
89 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| South Texas 2 |
100 |
|
|
|
|
| Waterford 3 |
0 |
1999-02-19 |
REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS |
|
|
| Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.