Event Notification Report for February 01, 2023

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
01/31/2023 - 02/01/2023

EVENT NUMBERS
56329

Power Reactor
Event Number: 56329
Facility: Farley
Region: 2     State: AL
Unit: [1] [] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: Ryan Harlos
HQ OPS Officer: Brian P. Smith
Notification Date: 02/01/2023
Notification Time: 13:40 [ET]
Event Date: 02/01/2023
Event Time: 09:56 [CST]
Last Update Date: 02/02/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS Actuation - Critical 50.72(b)(3)(iv)(A) - Valid Specif Sys Actuation
Person (Organization):
Miller, Mark (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 A/R Y 100 Power Operation 0 Hot Standby
Event Text
EN Revision Imported Date: 2/3/2023

EN Revision Text: AUTOMATIC REACTOR TRIP DUE AND AUTOMATIC ACTUATION OF AUXILIARY FEEDWATER SYSTEM

The following information was provided by the licensee via email:

"At 0956 CST with Unit 1 in Mode 1 at 100 percent power, the reactor automatically tripped due to a turbine trip. The trip was not complex with all safety related systems responding normally post-trip. During the trip, the non safety related '1A' 4160V bus lost power resulting in the loss of one Reactor Coolant Pump (RCP-1A). Operations responded and stabilized the plant. The '1A' 4160V bus was re-energized at 1031 CST. Decay heat is being removed by steam dumps to the main condenser. Farley Unit 2 is not affected.

"An automatic actuation of [Auxiliary Feedwater] AFW also occurred, which is an expected response from the reactor trip.

"Due to the Reactor Protection System actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B) and an eight-hour report per 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the Auxiliary Feedwater System.

"There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified."