Event Number: 54907
Facility: Fort Calhoun
Region: 4     State: NE
Unit: [1] [] []
RX Type: (1) CE
NRC Notified By: Brock Lindau
HQ OPS Officer: Thomas Herrity
Notification Date: 09/23/2020
Notification Time: 18:56 [ET]
Event Date: 09/23/2020
Event Time: 15:28 [CDT]
Last Update Date: 09/23/2020
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(2)(xi) - Offsite Notification
Person (Organization):
RICK DEESE (R4DO)
JEFFERY GRANT (IRD)
CHRIS MILLER (NRR EO)
ANDREA KOCK (NMSS)
NMSS_EVENTS_NOTIFICATION (EMAIL)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Defueled 0 Defueled
Event Text
OFFSITE NOTIFICATION - PRESS RELEASE FOR A FIRE IN CONTAINMENT

"At 1528 CDT, a fire was reported in containment. Fire was extinguished using a portable fire extinguisher by dedicated fire watch. Offsite fire departments responded at 1541 CDT and the fire was confirmed extinguished at 1601 CDT. There were no injuries reported. The state Fire Marshal of Nebraska has been notified. There was no release of radioactivity or hazardous materials.

"The following statement is planned to be released to the media:

"A small industrial fire broke out this afternoon at OPPD's Fort Calhoun Station, the decommissioning nuclear plant just south of Blair, Nebraska. It had been put out by fire extinguishers before firefighters arrived. No release of radioactivity occurred. All employees and contractors are accounted for and safe.

"Based on our preliminary investigation, the fire appears to have been caused by a torch used for cutting. Firefighters are using a thermal gun to identify any potential remaining hot spots.

"The plant is undergoing decommissioning and all spent nuclear fuel is fully secured in industry-standard dry cask storage, located away from the site of today's fire. The public remains safe and the facility remains secure. All work at the site is on a temporary hold. Safety remains our highest priority.

"OPPD will provide additional information as it becomes available."