Event Notification Report for June 21, 2020

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
06/20/2020 - 06/21/2020

EVENT NUMBERS
54752

Power Reactor
Event Number: 54752
Facility: Catawba
Region: 2     State: SC
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Scott Milton
HQ OPS Officer: Ossy Font
Notification Date: 06/22/2020
Notification Time: 01:00 [ET]
Event Date: 06/21/2020
Event Time: 21:00 [EDT]
Last Update Date: 06/22/2020
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
MARK MILLER (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
UNPLANNED TECHNICAL SUPPORT CENTER VENTILATION MAINTENANCE

"At 2100 on June 21, 2020, a condition was discovered which will require corrective maintenance activities to be performed on the Technical Support Center (TSC) HVAC. The work will include repair of the Condensing Unit system. The estimated duration of repair is unknown at this time.

"If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable. If relocation of the TSC becomes necessary, the Emergency Director will relocate the TSC staff to the alternate facility.

"This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the discovered condition of the TSC affects the functionality of an emergency response facility.

"There was no impact on the health and safety of the public or plant personnel.

"The NRC Resident Inspector has been notified."