Event Notification Report for April 04, 2020

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
04/03/2020 - 04/04/2020

EVENT NUMBERS
5463954640

Power Reactor
Event Number: 54639
Facility: CALLAWAY
Region: 4     State: MO
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: JEFF GULICK
HQ OPS Officer: THOMAS KENDZIA
Notification Date: 04/04/2020
Notification Time: 05:31 [ET]
Event Date: 04/04/2020
Event Time: 01:15 [CDT]
Last Update Date: 04/04/2020
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
VINCENT GADDY (R4DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 A/R Y 100 Power Operation 0 Hot Standby
Event Text
AUTOMATIC REACTOR TRIP

"At 0114 [CDT] on April 04, 2020 the plant was in Mode 1 at 100 percent power when a Digital Feedwater Trouble alarm was received unexpectedly. Operators identified a full feedwater demand signal and lowering level in the 'C' Steam Generator. At 0115 a Reactor Trip signal for Low Steam Generator Level was received. All systems responded as expected. A Feedwater Isolation signal was received due to the reactor trip with RCS average temperature less than 564 degrees Fahrenheit. Auxiliary Feedwater started on a valid actuation signal to restore and maintain Steam Generator levels. The Plant is being maintained stable in Mode 3 with no complications.

"The NRC Resident Inspector has been notified of the Reactor Trip."

All control rods fully inserted from the reactor trip signal, and decay heat is being removed via the Auxiliary Feedwater and Steam Dump Systems.


Fuel Cycle Facility
Event Number: 54640
Facility: GLOBAL NUCLEAR FUEL - AMERICAS
Region: 2     State: NC
Unit: [] [] []
RX Type: URANIUM FUEL FABRICATION
Comments: LEU CONVERSION (UF6 TO UO2)
LEU FABRICATION
LWR COMMERICAL FUEL
NRC Notified By: PHILLIP OLLIS
HQ OPS Officer: ANDREW WAUGH
Notification Date: 04/04/2020
Notification Time: 18:43 [ET]
Event Date: 04/04/2020
Event Time: 09:30 [EDT]
Last Update Date: 04/04/2020
Emergency Class: NON EMERGENCY
10 CFR Section:
PART 70 APP A (c) - OFFSITE NOTIFICATION/NEWS REL
Person (Organization):
MARK MILLER (R2DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
Event Text
OFFSITE NOTIFICATION

At approximately 0930 EDT on April 4, 2020, the New Hanover County Deputy Fire Marshall was notified per state code requirements that the fire alarm system and accompanying fire pumps encompassing the fuel manufacturing operation (FMO) were placed on backup power due to a planned power outage. Additional compensatory measures were enacted. Power was restored at approximately 1800 EDT on April 4, 2020. Because the New Hanover County Deputy Fire Marshall was notified, a concurrent notification to the NRC Operations Center is being made per 10 CFR 70, Appendix A(c).