Event Notification Report for August 19, 2019

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
08/18/2019 - 08/19/2019

EVENT NUMBERS
5422954232

Power Reactor
Event Number: 54229
Facility: DAVIS BESSE
Region: 3     State: OH
Unit: [1] [] []
RX Type: [1] B&W-R-LP
NRC Notified By: TIM THOMPSON
HQ OPS Officer: KERBY SCALES
Notification Date: 08/19/2019
Notification Time: 14:46 [ET]
Event Date: 08/19/2019
Event Time: 09:24 [EDT]
Last Update Date: 08/19/2019
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(B) - POT RHR INOP
Person (Organization):
KENNETH RIEMER (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
AUXILIARY FEEDWATER SYSTEM INOPERABLE

"At 0924 EDT, on August 19, 2019, it was discovered that both trains of the Auxiliary Feedwater System were simultaneously inoperable; therefore, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v)(B). The door separating the two steam-driven Auxiliary Feedwater Pump Rooms was inadvertently left open during maintenance activities for more than an hour. The door was immediately closed upon discovery, restoring operability to the Auxiliary Feedwater System. The non-safety grade Motor-Driven Feedwater Pump remained operable during this time; additionally, the beyond-design basis diesel-driven Emergency Feedwater Pump also remained available. There was no impact on the health and safety of the public or plant personnel.

"The NRC Resident Inspector has been notified."


Power Reactor
Event Number: 54232
Facility: COOPER
Region: 4     State: NE
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: ROY GILES
HQ OPS Officer: KERBY SCALES
Notification Date: 08/20/2019
Notification Time: 18:28 [ET]
Event Date: 08/19/2019
Event Time: 09:39 [CDT]
Last Update Date: 08/20/2019
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
CALE YOUNG (R4DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF PUBLIC PROMPT NOTIFICATION SYSTEM

"At 0939 CDT, on 8/19/19, the National Weather Service reported to Cooper Nuclear Station that the National Warning System (NAWAS) Radio would neither transmit nor receive. The system has been intermittently available since then, but never declared fully functional. The backup notification system has been verified to be available throughout this period. Additional information from the National Weather Service received 8/20/19 at 1414 determined that the Shubert Tower transmitter is non-functional and would not be repaired until 8/21/19. The transmission outage is conservatively assumed to have begun at the first notification on 8/19/19 at 0939. The Shubert Tower transmitter activates the [EMERGENCY ALERT SYSTEM] EAS/Tone Alert Radios used for public notification. This is considered to be a major loss of the Public Prompt Notification System capability and is reportable under 10 CFR 50.72(b)(3)(xiii) when the primary notification system is or will be unavailable for greater than 24 hours with the backup system available.

"The NRC Senior Resident has been informed."