02/04/2019 - 02/05/2019
Power Reactor
Event Number: 53861
Facility: QUAD CITIES
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: DEREK DROCKELMAN
HQ OPS Officer: JEFFREY WHITED
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: DEREK DROCKELMAN
HQ OPS Officer: JEFFREY WHITED
Notification Date: 02/06/2019
Notification Time: 02:22 [ET]
Event Date: 02/05/2019
Event Time: 18:04 [CST]
Last Update Date: 02/06/2019
Notification Time: 02:22 [ET]
Event Date: 02/05/2019
Event Time: 18:04 [CST]
Last Update Date: 02/06/2019
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
ROBERT DALEY (R3DO)
ROBERT DALEY (R3DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
UNIT ONE HPCI SYSTEM INOPERABLE DUE TO BLOWN FUSE
"On February 5, 2019, at 1804 [CST], during a Unit 1 High Pressure Coolant Injection (HPCI) operability surveillance, a fuse blew in the logic for the motor speed changer for the turbine. The Unit 1 HPCI system was taken out of service for planned maintenance earlier in the day. The fuse issue was not related to any maintenance activities. Had HPCI been demanded, this fuse failure would not have allowed HPCI to reach its required speed. HPCI remains inoperable pending resolution of the issue. The Reactor Core Isolation Cooling (RCIC) system was confirmed operable. There were no other systems inoperable at the time of the event. HPCI had been last successfully tested on November 6, 2018.
"This event is being reported as a condition that could have prevented fulfillment of a safety function in accordance with 10 CFR 50.72(b)(3)(v)(D). The HPCI system is a single train system and the loss of HPCI could impact the plant's ability to mitigate the consequences of an accident.
"The NRC Senior Resident Inspector has been notified."
Inoperable HPCI places the unit in a 14 day Technical Specification Limiting Condition of Operability.
"On February 5, 2019, at 1804 [CST], during a Unit 1 High Pressure Coolant Injection (HPCI) operability surveillance, a fuse blew in the logic for the motor speed changer for the turbine. The Unit 1 HPCI system was taken out of service for planned maintenance earlier in the day. The fuse issue was not related to any maintenance activities. Had HPCI been demanded, this fuse failure would not have allowed HPCI to reach its required speed. HPCI remains inoperable pending resolution of the issue. The Reactor Core Isolation Cooling (RCIC) system was confirmed operable. There were no other systems inoperable at the time of the event. HPCI had been last successfully tested on November 6, 2018.
"This event is being reported as a condition that could have prevented fulfillment of a safety function in accordance with 10 CFR 50.72(b)(3)(v)(D). The HPCI system is a single train system and the loss of HPCI could impact the plant's ability to mitigate the consequences of an accident.
"The NRC Senior Resident Inspector has been notified."
Inoperable HPCI places the unit in a 14 day Technical Specification Limiting Condition of Operability.
Power Reactor
Event Number: 53863
Facility: INDIAN POINT
Region: 1 State: NY
Unit: [2] [3] []
RX Type: [2] W-4-LP,[3] W-4-LP
NRC Notified By: TERRY R. JONES
HQ OPS Officer: BETHANY CECERE
Region: 1 State: NY
Unit: [2] [3] []
RX Type: [2] W-4-LP,[3] W-4-LP
NRC Notified By: TERRY R. JONES
HQ OPS Officer: BETHANY CECERE
Notification Date: 02/06/2019
Notification Time: 12:46 [ET]
Event Date: 02/05/2019
Event Time: 18:00 [EST]
Last Update Date: 02/06/2019
Notification Time: 12:46 [ET]
Event Date: 02/05/2019
Event Time: 18:00 [EST]
Last Update Date: 02/06/2019
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 - FITNESS FOR DUTY
10 CFR Section:
26.719 - FITNESS FOR DUTY
Person (Organization):
CHRISTOPHER CAHILL (R1DO)
FFD GROUP (EMAIL)
CHRISTOPHER CAHILL (R1DO)
FFD GROUP (EMAIL)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
FITNESS-FOR-DUTY - CONTRABAND DISCOVERED IN PROTECTED AREA
On February 05, 2019 at approximately 1800 EST, candy that contained alcohol was discovered in the plant protected area. The candy was removed from the protected area by station security management.
The licensee notified the NRC Resident Inspector and the State of New York Public Service Commission.
On February 05, 2019 at approximately 1800 EST, candy that contained alcohol was discovered in the plant protected area. The candy was removed from the protected area by station security management.
The licensee notified the NRC Resident Inspector and the State of New York Public Service Commission.