Skip to main content

Event Notification Report for January 21, 2019

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
01/20/2019 - 01/21/2019

EVENT NUMBERS
5383953841

Non-Agreement State
Event Number: 53839
Rep Org: BAXTER
Licensee: BAXTER
Region: 1
City: AIBONITO   State: PR
County:
License #: 52-2117501
Agreement: N
Docket:
NRC Notified By: MARCOS TORRES
HQ OPS Officer: OSSY FONT
Notification Date: 01/22/2019
Notification Time: 08:36 [ET]
Event Date: 01/21/2019
Event Time: 09:00 [ATL]
Last Update Date: 01/22/2019
Emergency Class: NON EMERGENCY
10 CFR Section:
36.83(a)(10) - POOL COND HIGH
Person (Organization):
MEL GRAY (R1DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
Event Text
IRRADIATOR POOL WATER CONDUCTIVITY EXCEEDS LIMIT

During a routine surveillance, oil was seen in the pool with the underwater irradiator. Testing found that the pool's conductivity was 180 micro Siemens per centimeter (æS/cm), exceeding the 20 æS/cm regulatory limit and the 100 æS/cm reportability limit. The licensee is currently filtering the water to clean up the pool and at the time of the notification had lowered the conductivity to 160 æS/cm. Additional filters are being purchased and the licensee estimates a few more days before the conductivity will be below the regulatory limit.

A leaking chiller was identified as the source of the oil. An assessment is being conducted to either repair or replace the chiller.


Non-Power Reactor
Event Number: 53841
Rep Org: UNIV OF MISSOURI-COLUMBIA
Licensee: UNIVERSITY OF MISSOURI
Region: 0
City: COLUMBIA   State: MO
County: BOONE
License #: R-103
Agreement: N
Docket: 05000186
NRC Notified By: BRUCE MEFFERT
HQ OPS Officer: BRIAN P. SMITH
Notification Date: 01/22/2019
Notification Time: 12:15 [ET]
Event Date: 01/21/2019
Event Time: 12:35 [CST]
Last Update Date: 01/22/2019
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
GEOFFREY WERTZ (NRR)
ELIZABETH REED (NRR)
Event Text
DEVIATION OF TS 3.3.a(1) for ANTI-SIPHON DEVICE FOUND INOPERABLE

"On January 21, 2019 at approximately 1235 CST, with all four (4) shim control rods fully inserted into the reactor core during performance of a pre-startup checklist, the University of Missouri-Columbia Research Reactor (MURR) deviated from Technical Specification (TS) 3.3.a(1) due to test jumpers being installed while electrical power was available to the shim rod drive mechanism electromagnets. Prior to this event, the reactor was shut down for a regularly-scheduled maintenance period. A required notification per TS 6.6.c(1) to report to the NRC Operations Center that an Abnormal Occurrence, as defined by MURR TS 1.1, had occurred. Specifically, MURR was not in compliance with all TS Limiting Conditions for Operations, specifically TS 3.3.a(1).

"For about ten (10) seconds at approximately 1235 CST, power was available to the shim rod drive mechanism electromagnets while electrical test jumpers, which hold anti-siphon system isolation valves V543A and V543B closed, were inserted. In effect, the anti-siphon system was not operable while the reactor was technically operating for ten (10) seconds per the following definitions:

1. TS 1.23 Reactor in Operation - The reactor shall be considered in operation unless it is either shutdown or secured.
2. TS 1.27 Reactor Shutdown - The reactor is shutdown when: All four (4) of the shim blades (rods) are fully inserted and power is unavailable to the shim rod drive mechanism electromagnets.
3. TS 1.26 Reactor Secured - MURR did not meet the definition of Reactor Secured during the event.

"Though all four shim rods were fully inserted and a reactor startup had not commenced, electrical power being available to the shim rod drive mechanism electromagnets caused the reactor to technically be in Operation for a very brief period. Though this event happened at approximately 1235 CST, it was not fully identified as an abnormal occurrence per TS 1.1.b until approximately 1625 CST, after a reactor startup was performed to 10 MW operation. Once the abnormal occurrence was realized, the Reactor Facility Director was immediately notified at 1715 CST, and he gave permission to continue reactor operation. A detailed event report will follow within 14 days as required by MURR TS 6.6.c(3)."