Event Notification Report for January 05, 2019

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
01/04/2019 - 01/05/2019

EVENT NUMBERS
53815

!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 53815
Facility: PILGRIM
Region: 1     State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: PAUL GALLANT
HQ OPS Officer: DONALD NORWOOD
Notification Date: 01/05/2019
Notification Time: 17:30 [ET]
Event Date: 01/05/2019
Event Time: 10:40 [EST]
Last Update Date: 02/11/2019
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(A) - POT UNABLE TO SAFE SD
Person (Organization):
ANTHONY DIMITRIADIS (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 31 Power Operation 31 Power Operation
Event Text
POTENTIAL LOSS OF MSIV SCRAM FUNCTION DURING MAIN STEAM LINE ISOLATION VALVE TESTING

"At approximately 1040 EST on January 5, 2019, during evaluation of test results for the 'C' Main Steam Isolation Valve (MSIV), it was determined that closure of three of four Main Steam Lines would not necessarily have resulted in a full scram during testing due to failure of a limit switch (LS-6) associated with MSIV-1C while in the test configuration. This condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v), 'Any event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to: (A) Shut down the reactor and maintain it in a safe shutdown condition.'

"The system was restored from the testing configuration at 1057 EST and the failed trip channel was placed in the tripped condition at 1326 EST thus restoring the design function. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified."

* * * RETRACTION AT 1529 EST ON 02/11/19 FROM JOSEPH FRATTASIO TO JEFF HERRERA * * *

"The purpose of the notification is to retract ENS Notification 53815 made on 01/05/19 for Pilgrim Nuclear Power Station. The previous notification reported that there was a potential loss of Main Steam Isolation Valve (MSIV) scram function during main steam line isolation valve testing, at the time of discovery, due to failure of a limit switch (LS-6) associated with MSIV-1C while in the test configuration. Subsequent evaluation has demonstrated that the scram function credited in the design basis was not lost.


"Specifically, after an Engineering Evaluation, it has been determined that the MSIV position RPS logic was not lost for those functions within the design basis and, as such, was capable of performing its intended safety function."

The NRC Resident Inspector has been notified.

Notified the R1DO (Cahill).