Event Number: 53696
Facility: GINNA
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: WADE WEBER
HQ OPS Officer: OSSY FONT
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: WADE WEBER
HQ OPS Officer: OSSY FONT
Notification Date: 10/27/2018
Notification Time: 01:50 [ET]
Event Date: 10/26/2018
Event Time: 00:00 [EDT]
Last Update Date: 10/27/2018
Notification Time: 01:50 [ET]
Event Date: 10/26/2018
Event Time: 00:00 [EDT]
Last Update Date: 10/27/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION 50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION 50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
DONNA JANDA (R1DO)
DONNA JANDA (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
AUTOMATIC START OF THE EMERGENCY DIESEL GENERATOR AND LOSS OF RADIATION MONITOR
"RCS [Reactor Coolant System] Pressure: vented to containment, refueling cavity greater than 23ft. [above reactor vessel]. RCS temperature: 96 degrees Fahrenheit.
"The 12A bus de-energized, 'A' EDG [Emergency Diesel Generator] automatically started and loaded on [emergency] buses 14 and 18. The RCS configuration is refueling cavity level greater than 23ft. above the reactor flange with no impact to shutdown cooling.
"Radiation monitor R-1, Control Room radiation monitor, lost power for 2 hrs 10 min. This placed Ginna in a major loss of emergency preparedness capabilities. A temporary radiation monitor has been installed in the Control Room."
Prior to the notification, the licensee had restored the 12A bus from offsite power and the R-1 monitor was re-energized.
The licensee notified the NRC Resident Inspector.
"RCS [Reactor Coolant System] Pressure: vented to containment, refueling cavity greater than 23ft. [above reactor vessel]. RCS temperature: 96 degrees Fahrenheit.
"The 12A bus de-energized, 'A' EDG [Emergency Diesel Generator] automatically started and loaded on [emergency] buses 14 and 18. The RCS configuration is refueling cavity level greater than 23ft. above the reactor flange with no impact to shutdown cooling.
"Radiation monitor R-1, Control Room radiation monitor, lost power for 2 hrs 10 min. This placed Ginna in a major loss of emergency preparedness capabilities. A temporary radiation monitor has been installed in the Control Room."
Prior to the notification, the licensee had restored the 12A bus from offsite power and the R-1 monitor was re-energized.
The licensee notified the NRC Resident Inspector.