Event Notification Report for December 07, 2017

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
12/06/2017 - 12/07/2017

EVENT NUMBERS
53107

Power Reactor
Event Number: 53107
Facility: SURRY
Region: 2     State: VA
Unit: [1] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: DAVID EVANS
HQ OPS Officer: VINCE KLCO
Notification Date: 12/07/2017
Notification Time: 15:03 [ET]
Event Date: 12/07/2017
Event Time: 13:01 [EST]
Last Update Date: 12/07/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
SHAKUR WALKER (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
OFFSITE NOTIFICATION OF GROUNDWATER RESULTS TO STATE AND LOCAL AGENCIES

"This non-emergency notification is being made in accordance with 10 CFR 50.72(b)(2)(xi), any event or situation related to the protection of the environment for which notification to other government agencies has been made. Dominion Energy is in the process of informing the Virginia Department of Health, Department of Environmental Quality, Department of Emergency Management, and the Surry County Administrator of recent groundwater monitoring results at Surry Power Station in accordance with NEI 07-07, Industry Groundwater Protection Initiative (GPI).

"On December 6, 2017 at 1138 EST, Surry Power Station received analysis results of recent samples from the on-site groundwater monitoring program. As part of the program, 10 new groundwater monitoring wells were recently placed in service within the Protected Area to provide early detection, to better define the site's hydrology, and if necessary, to mitigate any potential leaks. The analysis results from one of the new wells indicated tritium activity level above the GPI communication threshold. Samples were re-analyzed, resulting in different values, with the highest result of 59,300 picoCuries per liter. Since each result was above the voluntary reporting threshold, Surry stakeholder communication was implemented in accordance with the NEI GPI Voluntary Communication Protocol, Criterion 2.2.

"There are no known active leaks at this location; however, Dominion Energy is continuing to investigate the source of the tritium and the reason for the variability in the sample results.

"Tritium was not detected in the on-site monitoring locations outside of the Protected Area. No tritium has been detected in the on-site and off-site drinking water wells. Since the activity is contained within the site restricted area, the health and safety of on-site personnel and members of the public are not affected.

"A 30-day report will be submitted to the NRC in accordance with NEI 07-07.

"The NRC Senior Resident Inspector has been notified."