Skip to main content

Event Notification Report for November 05, 2017

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
11/04/2017 - 11/05/2017

EVENT NUMBERS
53054

Power Reactor
Event Number: 53054
Facility: CLINTON
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: SETH STROPE
HQ OPS Officer: JEFF HERRERA
Notification Date: 11/05/2017
Notification Time: 17:11 [ET]
Event Date: 11/05/2017
Event Time: 12:40 [CST]
Last Update Date: 11/05/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL
Person (Organization):
HIRONORI PETERSON (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 98 Power Operation 98 Power Operation
Event Text
LOSS OF SECONDARY CONTAINMENT PRESSURE DUE TO VOLTAGE TRANSIENT

"At approximately 1240 CST on 11/05/17, the Main Control Room received numerous annunciators that indicated a trip of the Emergency Reserve Auxiliary Transformer (ERAT) Static VAR [volt-ampere reactive] Compensator (SVC) caused by a voltage transient on the 138 kV feed due to thunderstorms in the area. As a result of the voltage transient, the Division 1 Fuel Building ventilation (VF) system isolation dampers closed causing a trip of VF supply and exhaust fans. With no running VF fans, secondary containment differential pressure rose to slightly greater than 0 inches water gauge which exceeded the Technical Specification requirement of greater than 0.25 inches vacuum water gauge at 1241. The Control Room entered EOP-8, Secondary Containment Control. This event is being reported as a Condition that Could Have Prevented Fulfillment of a Safety Function under 10CFR50.72(b)(3)(v)(C). Secondary Containment differential pressure was restored within Technical Specification requirements at 1242 by starting the Standby Gas Treatment HVAC (VG) system.

"The NRC Resident Inspector has been notified."