Event Notification Report for September 09, 2017
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
09/08/2017 - 09/09/2017
Power Reactor
Event Number: 52957
Facility: CRYSTAL RIVER
Region: 1 State: FL
Unit: [3] [] []
RX Type: [3] B&W-L-LP
NRC Notified By: JOHN JERNIGAN
HQ OPS Officer: STEVE SANDIN
Region: 1 State: FL
Unit: [3] [] []
RX Type: [3] B&W-L-LP
NRC Notified By: JOHN JERNIGAN
HQ OPS Officer: STEVE SANDIN
Notification Date: 09/09/2017
Notification Time: 11:50 [ET]
Event Date: 09/09/2017
Event Time: 11:09 [EDT]
Last Update Date: 09/09/2017
Notification Time: 11:50 [ET]
Event Date: 09/09/2017
Event Time: 11:09 [EDT]
Last Update Date: 09/09/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
GLENN DENTEL (R1DO)
SCOTT MOORE (NMSS)
NMSS_EVENTS_NOTIFICA (EMAI)
GLENN DENTEL (R1DO)
SCOTT MOORE (NMSS)
NMSS_EVENTS_NOTIFICA (EMAI)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 3 | N | N | 0 | Defueled | 0 | Defueled |
HURRICANE WARNING ISSUED AFFECTING SITE WITHIN 36 HOURS
Crystal River Unit 3 is currently undergoing decommissioning and is permanently shut down.
The licensee entered their adverse weather procedure EM-220D based on a Hurricane Warning affecting the site within 36 hours. All applicable sections of EM-220D are complete or in progress.
No fuel movement activities are in progress. All equipment including Emergency Diesel Generators (EDGS) is available to perform required spent fuel cooling.
The licensee will inform the NRC Region I Office.
Crystal River Unit 3 is currently undergoing decommissioning and is permanently shut down.
The licensee entered their adverse weather procedure EM-220D based on a Hurricane Warning affecting the site within 36 hours. All applicable sections of EM-220D are complete or in progress.
No fuel movement activities are in progress. All equipment including Emergency Diesel Generators (EDGS) is available to perform required spent fuel cooling.
The licensee will inform the NRC Region I Office.
Power Reactor
Event Number: 52958
Facility: FERMI
Region: 3 State: MI
Unit: [2] [] []
RX Type: [2] GE-4
NRC Notified By: GREG MILLER
HQ OPS Officer: STEVE SANDIN
Region: 3 State: MI
Unit: [2] [] []
RX Type: [2] GE-4
NRC Notified By: GREG MILLER
HQ OPS Officer: STEVE SANDIN
Notification Date: 09/09/2017
Notification Time: 15:04 [ET]
Event Date: 09/09/2017
Event Time: 10:00 [EDT]
Last Update Date: 09/09/2017
Notification Time: 15:04 [ET]
Event Date: 09/09/2017
Event Time: 10:00 [EDT]
Last Update Date: 09/09/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
ANN MARIE STONE (R3DO)
ANN MARIE STONE (R3DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
MECHANICAL DRAFT COOLING TOWER FANS DECLARED INOPERABLE
"At 1000 EDT on September 9, 2017, the Division 2 Mechanical Draft Cooling Tower (MDCT) fans were declared inoperable due to failure of the over speed fan brake inverter. The brakes prevent fan over speed from a design basis tornado. The MDCT fans are required to support operability of the Ultimate Heat Sink (UHS). The UHS is required to support operability of the Division 2 Emergency Equipment Cooling Water (EECW) system. The EECW system cools various safety related components, including the High Pressure Coolant Injection (HPCI) system room cooler. An unplanned HPCI inoperability occurred based on a loss of the HPCI Room Cooler. Investigation into why the Division 2 MDCT fan over speed brake inverter failed is in progress. This report is being made pursuant to 10CFR50.72(b)(3)(v)(D) as a condition that at the time of discovery could have prevented the fulfillment of a safety function needed to mitigate the consequences of an accident based on a loss of a single train safety system."
The licensee entered two (2) LCO Action Statements (AS); 14-day LCO AS 3.5.1 for ECCS (HPCI Inoperable) and 72-hour AS 3.7.2 for UHS. The licensee has two spare inverters on-site. After replacement and successful post-maintenance testing the licensee expects to exit both AS before 72-hours.
The NRC Resident Inspector has been notified.
"At 1000 EDT on September 9, 2017, the Division 2 Mechanical Draft Cooling Tower (MDCT) fans were declared inoperable due to failure of the over speed fan brake inverter. The brakes prevent fan over speed from a design basis tornado. The MDCT fans are required to support operability of the Ultimate Heat Sink (UHS). The UHS is required to support operability of the Division 2 Emergency Equipment Cooling Water (EECW) system. The EECW system cools various safety related components, including the High Pressure Coolant Injection (HPCI) system room cooler. An unplanned HPCI inoperability occurred based on a loss of the HPCI Room Cooler. Investigation into why the Division 2 MDCT fan over speed brake inverter failed is in progress. This report is being made pursuant to 10CFR50.72(b)(3)(v)(D) as a condition that at the time of discovery could have prevented the fulfillment of a safety function needed to mitigate the consequences of an accident based on a loss of a single train safety system."
The licensee entered two (2) LCO Action Statements (AS); 14-day LCO AS 3.5.1 for ECCS (HPCI Inoperable) and 72-hour AS 3.7.2 for UHS. The licensee has two spare inverters on-site. After replacement and successful post-maintenance testing the licensee expects to exit both AS before 72-hours.
The NRC Resident Inspector has been notified.