Event Notification Report for June 08, 2017
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
06/07/2017 - 06/08/2017
Non-Agreement State
Event Number: 53694
Rep Org: WAYNE STATE UNIVERSITY
Licensee: WAYNE STATE UNIVERSITY
Region: 3
City: DETROIT State: MI
County:
License #: 21-00741-08
Agreement: N
Docket:
NRC Notified By: MAHA SRINIVASAN
HQ OPS Officer: DONG HWA PARK
Licensee: WAYNE STATE UNIVERSITY
Region: 3
City: DETROIT State: MI
County:
License #: 21-00741-08
Agreement: N
Docket:
NRC Notified By: MAHA SRINIVASAN
HQ OPS Officer: DONG HWA PARK
Notification Date: 10/26/2018
Notification Time: 09:59 [ET]
Event Date: 06/08/2017
Event Time: 00:00 [EDT]
Last Update Date: 10/26/2018
Notification Time: 09:59 [ET]
Event Date: 06/08/2017
Event Time: 00:00 [EDT]
Last Update Date: 10/26/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
20.2201(a)(1)(ii) - LOST/STOLEN LNM>10X
10 CFR Section:
20.2201(a)(1)(ii) - LOST/STOLEN LNM>10X
Person (Organization):
MICHAEL KUNOWSKI (R3DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
CNSC (CANADA) (FAX)
ILTAB (EMAIL)
MICHAEL KUNOWSKI (R3DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
CNSC (CANADA) (FAX)
ILTAB (EMAIL)
LOST DEVICE
On 10/18/18, the licensee identified a Liquid Scintillation Counter missing during an inventory. The Radiation Safety Officer believes the device was disposed of as electronic waste on 6/8/2017. A Wallac Liquid Scintillation Counter contains a 10 microCurie Ra-226 source.
THIS MATERIAL EVENT CONTAINS A "LESS THAN CAT 3" LEVEL OF RADIOACTIVE MATERIAL
Sources that are "Less than IAEA Category 3 sources," are either sources that are very unlikely to cause permanent injury to individuals or contain a very small amount of radioactive material that would not cause any permanent injury. Some of these sources, such as moisture density gauges or thickness gauges that are Category 4, the amount of unshielded radioactive material, if not safely managed or securely protected, could possibly - although it is unlikely - temporarily injure someone who handled it or were otherwise in contact with it, or who were close to it for a period of many weeks. For additional information go to http://www-pub.iaea.org/MTCD/publications/PDF/Pub1227_web.pdf
On 10/18/18, the licensee identified a Liquid Scintillation Counter missing during an inventory. The Radiation Safety Officer believes the device was disposed of as electronic waste on 6/8/2017. A Wallac Liquid Scintillation Counter contains a 10 microCurie Ra-226 source.
THIS MATERIAL EVENT CONTAINS A "LESS THAN CAT 3" LEVEL OF RADIOACTIVE MATERIAL
Sources that are "Less than IAEA Category 3 sources," are either sources that are very unlikely to cause permanent injury to individuals or contain a very small amount of radioactive material that would not cause any permanent injury. Some of these sources, such as moisture density gauges or thickness gauges that are Category 4, the amount of unshielded radioactive material, if not safely managed or securely protected, could possibly - although it is unlikely - temporarily injure someone who handled it or were otherwise in contact with it, or who were close to it for a period of many weeks. For additional information go to http://www-pub.iaea.org/MTCD/publications/PDF/Pub1227_web.pdf
Part 21
Event Number: 52798
Rep Org: ENGINE SYSTEMS, INC
Licensee: ENGINE SYSTEMS, INC
Region: 1
City: ROCKY MOUNT State: NC
County:
License #:
Agreement: Y
Docket:
NRC Notified By: TOM HORNER
HQ OPS Officer: BETHANY CECERE
Licensee: ENGINE SYSTEMS, INC
Region: 1
City: ROCKY MOUNT State: NC
County:
License #:
Agreement: Y
Docket:
NRC Notified By: TOM HORNER
HQ OPS Officer: BETHANY CECERE
Notification Date: 06/09/2017
Notification Time: 17:00 [ET]
Event Date: 06/08/2017
Event Time: 00:00 [EDT]
Last Update Date: 06/09/2017
Notification Time: 17:00 [ET]
Event Date: 06/08/2017
Event Time: 00:00 [EDT]
Last Update Date: 06/09/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21(d)(3)(i) - DEFECTS AND NONCOMPLIANCE
10 CFR Section:
21.21(d)(3)(i) - DEFECTS AND NONCOMPLIANCE
Person (Organization):
LADONNA SUGGS (R2DO)
JESSE ROLLINS (R4DO)
PART 21/50.55 REACTO (EMAI)
LADONNA SUGGS (R2DO)
JESSE ROLLINS (R4DO)
PART 21/50.55 REACTO (EMAI)
PART 21 REPORT - DEFECTIVE MOTOR OPERATED POTENTIOMETER
The following information is excerpted from an Engine Systems, Inc. (ESI) report received via fax:
"Component: Motor operated potentiometer without pre-position feature
P/Ns: 72-07900-100-ESI
2-04E-184-103-ESI
2-00G-009-002-ESI
"System: Emergency Diesel Generator
"Summary:
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on April 12, 2017 following correspondence with Duke Energy - Catawba Nuclear Plant of a potential issue with a motor operated potentiometer (MOP) supplied by ESI. During bench testing, Duke was unable to adjust the cams of the MOP to operate the pre-position feature (also referred to as return-to-center). Further investigation revealed that the MOP supplied to Duke did not contain the desired cam arrangement.
"The evaluation was concluded on June 8, 2017 and it was determined that this issue is a reportable defect as defined by 10CFR21. For installations that rely on the pre-position function to drive generator output voltage to a predetermined setpoint in an emergency event, an incorrect cam arrangement on the motor operated potentiometer could negatively affect the emergency diesel generator [EDG] set's output voltage. This may prevent the EDG from carrying its safety-related loads in an emergency event.
"Discussion:
A motor operated potentiometer is commonly used in the voltage regulator system of emergency diesel generator sets to allow for local or remote adjustment of generator output voltage. The assembly supplied by ESI was a replacement for obsolete Portec/NEI part number 72-07900-100. ESI initiated a Supplier Deviation Notification [SDN] (Part Number Change) to replace the obsolete part with one that would serve as a functional replacement using the same mounting footprint. To accomplish this, a Basler brand MOP was selected. The "-ESI" suffix was added to designate a modification to the Basler MOP by replacing the standard 2W, open-wound potentiometer with a 3W, precision-wound potentiometer identical to the one used in the original Portec units. The SDN indicated that the replacement MOP would have the pre-position feature. Note that the SDN would later be revised to include replacements for Cooper-Bessemer part numbers 2-04E-184-103 and 2-00G-009-002 which represented the same Portec part number 72-07900-100.
"The Basler MOP selected by ESI for the assembly was model MOC2103. A review of Basler model MOC2103 indicates that it is not a return-to-center style device and instead contains a standard cam arrangement. Photos on the following page depict the differences between the two cam arrangement styles. ESI inadvertently selected the incorrect model for this application. Reviewing the qualification testing performed by ESI revealed that ESl's testing duplicated the original Portec test procedure (whereby one cam is set to close above setpoint and one cam is set to close below setpoint). However, the testing was shown to be inadequate to fully ensure the return-to-center functionality. Though the cams were properly set above and below setpoint, a further verification that the unit would return to center, even if sufficiently away from setpoint, was not performed. For installations that rely on the preposition function, it is possible that the MOPs supplied by ESI would not return the potentiometer to setpoint. Since the MOP is used to set output voltage of the emergency diesel generator, the consequences of this issue are that the EDG may not maintain voltage within its required range to support its safety-related loads.
"Root cause evaluation:
ESI selected the incorrect MOP to be used for this assembly. The original MOP used was a Portec/NEI P/N 72-07900-100 which became obsolete in the 1990s. ESI offered a replacement assembly (using the "-ESI" suffix) that included a Basler brand MOP, modified by replacing the factory supplied potentiometer to replicate the original Portec design. The original Portec MOP had the return-to-center feature and Basler offers some models with return-to-center and some without. ESI inadvertently selected the model without return-to-center.
"As a secondary cause, ESl's functional testing did not adequately verify the MOPs ability to return to center. The test procedure has steps to set the cams and limit switches as would be performed for the return-to-center style; however, the testing did not ensure that the cams would return the potentiometer back to the center, regardless of starting position.
[photos submitted with report with following captions:]
"Photo 1: Desired Return-to-Center Cam Arrangement Photo 2: As-Supplied Standard Cam Arrangement
Photos 3&4: Return-to-Center Cam Profile & Arrangement
Photo 5&6: Standard Cam Profile & Arrangement
"Evaluation of previous shipments:
ESI has supplied the replacement MOP from 2009 to 2016 on five (5) separate safety-related orders. A review of each order Indicates that the incorrect MOP was selected for the assembly.
"Affected Customers:
ESI has supplied motor operated potentiometers with the incorrect cam arrangement to the following customers.
"Part Number 72-07900-100-ESI; Customer Duke Energy - Catawba; Customer PO 196046; Qty 6; ESI Serial Numbers 3013905-1.1-1 thru 6; MOP Serial Numbers H01931980, H01995582, H01995584, H01995585, H01995586, H01995587; C-of-C Date 5/30/2015
"Part Number 72-07900-100-ESI; Customer Dremel/CFE - Laguna Verde; Customer PO 14-011/700427979; Qty 1; ESI Serial Number 3011566-3.1-1; MOP Serial Number H01798043; C-of-C Date 2/13/2015
"Part Number 2-04E-184-103-ESI; Customer APS - Palo Verde; Customer PO 500530279; Qty 3; ESI Serial Numbers 3005695-1.1-1 thru 3; MOP Serial Numbers: H00958610, H00961219, 333861; C-of-C Date 7/31/2009
"Part Number 2-04E-184-103-ESI; Customer APS - Palo Verde; Customer PO 500555659; Qty 3; ESI Serial Numbers 3008341-1.1-1 thru 3; MOP Serial Numbers H01151813, H01161548, H01161550; C-of-C Date 212/2012
"Part Number 2-00G-009-002-ESI; Customer South Texas Project; Customer PO 200410; Qty 2; ESI Serial Numbers 3015607-1.1-1 thru 2; MOP Serial Numbers H02027435, H02027436; C-of-C Date 8/19/2016
"Total Quantity 15
"Corrective Action:
Customers that have installed the motor operated potentiometer must evaluate the impact on their specific system. It may be acceptable to continue to use the MOP if other provisions are in place to ensure the EDG voltage is within an acceptable range for safety-related operation. Credit may also be taken for site acceptance testing following installation of the MOP. If the MOP is deemed acceptable for the application, no further action is necessary.
"For those customers that have determined the MOP is unacceptable for their application and/or would simply rather ensure they have the correct MOP, it may be returned to ESI for warranty replacement. Once a warranty order and Return Goods Authorization (RGA) is issued, supply of safety-related replacement MOP(s) is expected to be complete within 90 days.
"To prevent recurrence of this issue, ESI is implementing a revision to the procurement process for this assembly to update the part number of the MOP utilized. In addition, the dedication inspection and testing activities are being revised to ensure testing properly validates the return-to-center feature. This action is currently underway and will be completed prior to any future shipments."
If you have any questions, you may call:
Tom Horner
Quality Assurance Manager
Tel: (252) 977-2720
ESI Report ID: 10CFR21-0117, Rev. 0, dated 06/09/17
The following information is excerpted from an Engine Systems, Inc. (ESI) report received via fax:
"Component: Motor operated potentiometer without pre-position feature
P/Ns: 72-07900-100-ESI
2-04E-184-103-ESI
2-00G-009-002-ESI
"System: Emergency Diesel Generator
"Summary:
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on April 12, 2017 following correspondence with Duke Energy - Catawba Nuclear Plant of a potential issue with a motor operated potentiometer (MOP) supplied by ESI. During bench testing, Duke was unable to adjust the cams of the MOP to operate the pre-position feature (also referred to as return-to-center). Further investigation revealed that the MOP supplied to Duke did not contain the desired cam arrangement.
"The evaluation was concluded on June 8, 2017 and it was determined that this issue is a reportable defect as defined by 10CFR21. For installations that rely on the pre-position function to drive generator output voltage to a predetermined setpoint in an emergency event, an incorrect cam arrangement on the motor operated potentiometer could negatively affect the emergency diesel generator [EDG] set's output voltage. This may prevent the EDG from carrying its safety-related loads in an emergency event.
"Discussion:
A motor operated potentiometer is commonly used in the voltage regulator system of emergency diesel generator sets to allow for local or remote adjustment of generator output voltage. The assembly supplied by ESI was a replacement for obsolete Portec/NEI part number 72-07900-100. ESI initiated a Supplier Deviation Notification [SDN] (Part Number Change) to replace the obsolete part with one that would serve as a functional replacement using the same mounting footprint. To accomplish this, a Basler brand MOP was selected. The "-ESI" suffix was added to designate a modification to the Basler MOP by replacing the standard 2W, open-wound potentiometer with a 3W, precision-wound potentiometer identical to the one used in the original Portec units. The SDN indicated that the replacement MOP would have the pre-position feature. Note that the SDN would later be revised to include replacements for Cooper-Bessemer part numbers 2-04E-184-103 and 2-00G-009-002 which represented the same Portec part number 72-07900-100.
"The Basler MOP selected by ESI for the assembly was model MOC2103. A review of Basler model MOC2103 indicates that it is not a return-to-center style device and instead contains a standard cam arrangement. Photos on the following page depict the differences between the two cam arrangement styles. ESI inadvertently selected the incorrect model for this application. Reviewing the qualification testing performed by ESI revealed that ESl's testing duplicated the original Portec test procedure (whereby one cam is set to close above setpoint and one cam is set to close below setpoint). However, the testing was shown to be inadequate to fully ensure the return-to-center functionality. Though the cams were properly set above and below setpoint, a further verification that the unit would return to center, even if sufficiently away from setpoint, was not performed. For installations that rely on the preposition function, it is possible that the MOPs supplied by ESI would not return the potentiometer to setpoint. Since the MOP is used to set output voltage of the emergency diesel generator, the consequences of this issue are that the EDG may not maintain voltage within its required range to support its safety-related loads.
"Root cause evaluation:
ESI selected the incorrect MOP to be used for this assembly. The original MOP used was a Portec/NEI P/N 72-07900-100 which became obsolete in the 1990s. ESI offered a replacement assembly (using the "-ESI" suffix) that included a Basler brand MOP, modified by replacing the factory supplied potentiometer to replicate the original Portec design. The original Portec MOP had the return-to-center feature and Basler offers some models with return-to-center and some without. ESI inadvertently selected the model without return-to-center.
"As a secondary cause, ESl's functional testing did not adequately verify the MOPs ability to return to center. The test procedure has steps to set the cams and limit switches as would be performed for the return-to-center style; however, the testing did not ensure that the cams would return the potentiometer back to the center, regardless of starting position.
[photos submitted with report with following captions:]
"Photo 1: Desired Return-to-Center Cam Arrangement Photo 2: As-Supplied Standard Cam Arrangement
Photos 3&4: Return-to-Center Cam Profile & Arrangement
Photo 5&6: Standard Cam Profile & Arrangement
"Evaluation of previous shipments:
ESI has supplied the replacement MOP from 2009 to 2016 on five (5) separate safety-related orders. A review of each order Indicates that the incorrect MOP was selected for the assembly.
"Affected Customers:
ESI has supplied motor operated potentiometers with the incorrect cam arrangement to the following customers.
"Part Number 72-07900-100-ESI; Customer Duke Energy - Catawba; Customer PO 196046; Qty 6; ESI Serial Numbers 3013905-1.1-1 thru 6; MOP Serial Numbers H01931980, H01995582, H01995584, H01995585, H01995586, H01995587; C-of-C Date 5/30/2015
"Part Number 72-07900-100-ESI; Customer Dremel/CFE - Laguna Verde; Customer PO 14-011/700427979; Qty 1; ESI Serial Number 3011566-3.1-1; MOP Serial Number H01798043; C-of-C Date 2/13/2015
"Part Number 2-04E-184-103-ESI; Customer APS - Palo Verde; Customer PO 500530279; Qty 3; ESI Serial Numbers 3005695-1.1-1 thru 3; MOP Serial Numbers: H00958610, H00961219, 333861; C-of-C Date 7/31/2009
"Part Number 2-04E-184-103-ESI; Customer APS - Palo Verde; Customer PO 500555659; Qty 3; ESI Serial Numbers 3008341-1.1-1 thru 3; MOP Serial Numbers H01151813, H01161548, H01161550; C-of-C Date 212/2012
"Part Number 2-00G-009-002-ESI; Customer South Texas Project; Customer PO 200410; Qty 2; ESI Serial Numbers 3015607-1.1-1 thru 2; MOP Serial Numbers H02027435, H02027436; C-of-C Date 8/19/2016
"Total Quantity 15
"Corrective Action:
Customers that have installed the motor operated potentiometer must evaluate the impact on their specific system. It may be acceptable to continue to use the MOP if other provisions are in place to ensure the EDG voltage is within an acceptable range for safety-related operation. Credit may also be taken for site acceptance testing following installation of the MOP. If the MOP is deemed acceptable for the application, no further action is necessary.
"For those customers that have determined the MOP is unacceptable for their application and/or would simply rather ensure they have the correct MOP, it may be returned to ESI for warranty replacement. Once a warranty order and Return Goods Authorization (RGA) is issued, supply of safety-related replacement MOP(s) is expected to be complete within 90 days.
"To prevent recurrence of this issue, ESI is implementing a revision to the procurement process for this assembly to update the part number of the MOP utilized. In addition, the dedication inspection and testing activities are being revised to ensure testing properly validates the return-to-center feature. This action is currently underway and will be completed prior to any future shipments."
If you have any questions, you may call:
Tom Horner
Quality Assurance Manager
Tel: (252) 977-2720
ESI Report ID: 10CFR21-0117, Rev. 0, dated 06/09/17
Power Reactor
Event Number: 52795
Facility: SUSQUEHANNA
Region: 1 State: PA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: DARVIN DUTTRY
HQ OPS Officer: MARK ABRAMOVITZ
Region: 1 State: PA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: DARVIN DUTTRY
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 06/08/2017
Notification Time: 19:10 [ET]
Event Date: 06/08/2017
Event Time: 15:27 [EDT]
Last Update Date: 06/08/2017
Notification Time: 19:10 [ET]
Event Date: 06/08/2017
Event Time: 15:27 [EDT]
Last Update Date: 06/08/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(A) - ECCS INJECTION 50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(2)(xi) - OFFSITE NOTIFICATION 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
10 CFR Section:
50.72(b)(2)(iv)(A) - ECCS INJECTION 50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(2)(xi) - OFFSITE NOTIFICATION 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
BLAKE WELLING (R1DO)
BLAKE WELLING (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | A/R | Y | 100 | Power Operation | 0 | Hot Shutdown |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
AUTOMATIC REACTOR SCRAM AFTER MAIN TURBINE CONTROL LOGIC LOSS OF POWER
"At 1527 hrs [EDT] on June 8, 2017, Susquehanna Steam Electric Station Unit 1 reactor automatically scrammed due to a loss of Main Turbine Electro-Hydraulic Control (EHC) logic power causing a High Flux Reactor Power RPS [Reactor Protection System] trip.
"All control rods [fully] inserted and both reactor recirculation pumps tripped due to reaching reactor water level 2. Reactor water level lowered to -49 inches causing Level 3 (+13 inches) and Level 2 (-38 inches) isolations. HPCI [High Pressure Coolant Injection] and RCIC [Reactor Core Isolation Cooling] automatically initiated and were overridden by control room operators after RPV [Reactor Pressure Vessel] water level was restored to the normal band with feedwater. HPCI and RCIC injected to the Reactor Coolant System during reactor level stabilization. All isolations and initiations occurred as expected. No main steam relief valves opened. Pressure was controlled via main turbine bypass valve operation. All safety systems operated as expected.
"Secondary Containment Zone 1, 2, and 3 differential pressure lowered to 0 inch WG [Water Gauge] due to a trip of the Reactor Building Ventilation system that resulted from Unit 1 Level 2 isolation. Differential pressure was restored to Zones 1, 2, and 3 by the initiation of Standby Gas Treatment System on the Unit 1 Level 2 initiation.
"Unit 1 reactor is currently stable in Mode 3. Investigation into the loss of Main Turbine EHC logic power is underway.
"The NRC Resident Inspector has been notified. A voluntary notification to PEMA and press release will occur."
The suspected cause of the loss of power to the EHC logic circuit is ongoing maintenance on the system.
"At 1527 hrs [EDT] on June 8, 2017, Susquehanna Steam Electric Station Unit 1 reactor automatically scrammed due to a loss of Main Turbine Electro-Hydraulic Control (EHC) logic power causing a High Flux Reactor Power RPS [Reactor Protection System] trip.
"All control rods [fully] inserted and both reactor recirculation pumps tripped due to reaching reactor water level 2. Reactor water level lowered to -49 inches causing Level 3 (+13 inches) and Level 2 (-38 inches) isolations. HPCI [High Pressure Coolant Injection] and RCIC [Reactor Core Isolation Cooling] automatically initiated and were overridden by control room operators after RPV [Reactor Pressure Vessel] water level was restored to the normal band with feedwater. HPCI and RCIC injected to the Reactor Coolant System during reactor level stabilization. All isolations and initiations occurred as expected. No main steam relief valves opened. Pressure was controlled via main turbine bypass valve operation. All safety systems operated as expected.
"Secondary Containment Zone 1, 2, and 3 differential pressure lowered to 0 inch WG [Water Gauge] due to a trip of the Reactor Building Ventilation system that resulted from Unit 1 Level 2 isolation. Differential pressure was restored to Zones 1, 2, and 3 by the initiation of Standby Gas Treatment System on the Unit 1 Level 2 initiation.
"Unit 1 reactor is currently stable in Mode 3. Investigation into the loss of Main Turbine EHC logic power is underway.
"The NRC Resident Inspector has been notified. A voluntary notification to PEMA and press release will occur."
The suspected cause of the loss of power to the EHC logic circuit is ongoing maintenance on the system.