Event Notification Report for May 30, 2017
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/29/2017 - 05/30/2017
EVENT NUMBERS
52775527765277752779
Power Reactor
Event Number: 52775
Facility: SOUTH TEXAS
Region: 4 State: TX
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: WILLIAM HERZOG
HQ OPS Officer: JEFF ROTTON
Region: 4 State: TX
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: WILLIAM HERZOG
HQ OPS Officer: JEFF ROTTON
Notification Date: 05/30/2017
Notification Time: 14:10 [ET]
Event Date: 05/30/2017
Event Time: 09:29 [CDT]
Last Update Date: 05/30/2017
Notification Time: 14:10 [ET]
Event Date: 05/30/2017
Event Time: 09:29 [CDT]
Last Update Date: 05/30/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
NEIL OKEEFE (R4DO)
NEIL OKEEFE (R4DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
LOSS OF EMERGENCY OPERATIONS FACILITY INTEGRATED COMPUTER SYSTEM DATA FOR PLANNED MAINTENANCE
"On May 30, 2017 at 0929 (CDT), South Texas Project (STP) removed from service Integrated Computer System (ICS) connections to the Emergency Operations Facility (EOF) for planned maintenance. The ICS computers are used in the EOF to directly monitor selected plant parameters and to provide Emergency Response assessment capabilities. This planned maintenance implements a software modification and is expected to last for four days.
"This is reportable under 10 CFR 50.72(b)(3)(xiii) because the EOF assessment capabilities would not be able to be restored within the facility activation time and assessment capabilities cannot be performed at a backup facility (i.e., there is no backup EOF).
"While ICS connections in the EOF are out of service, if the Emergency Plan is entered and the Technical Support Center (TSC) and EOF are staffed, the EOF will not activate and Emergency Director authority will remain in the TSC. The Emergency Response Organization team members that report to the EOF and TSC have been notified regarding the status of the ICS computers in the EOF.
"The planned modification that impacts the ICS computers in the EOF does not affect the health and safety of the public or station employees. The NRC Resident Inspector has been notified."
The licensee notified the Matagorda County Sheriff, and the State of Texas Department of Public Safety and the Department of State Health Services.
"On May 30, 2017 at 0929 (CDT), South Texas Project (STP) removed from service Integrated Computer System (ICS) connections to the Emergency Operations Facility (EOF) for planned maintenance. The ICS computers are used in the EOF to directly monitor selected plant parameters and to provide Emergency Response assessment capabilities. This planned maintenance implements a software modification and is expected to last for four days.
"This is reportable under 10 CFR 50.72(b)(3)(xiii) because the EOF assessment capabilities would not be able to be restored within the facility activation time and assessment capabilities cannot be performed at a backup facility (i.e., there is no backup EOF).
"While ICS connections in the EOF are out of service, if the Emergency Plan is entered and the Technical Support Center (TSC) and EOF are staffed, the EOF will not activate and Emergency Director authority will remain in the TSC. The Emergency Response Organization team members that report to the EOF and TSC have been notified regarding the status of the ICS computers in the EOF.
"The planned modification that impacts the ICS computers in the EOF does not affect the health and safety of the public or station employees. The NRC Resident Inspector has been notified."
The licensee notified the Matagorda County Sheriff, and the State of Texas Department of Public Safety and the Department of State Health Services.
Agreement State
Event Number: 52776
Rep Org: VIRGINIA RAD MATERIALS PROGRAM
Licensee: E.I. DUPONT DE NEMOURS AND COMPANY
Region: 1
City: RICHMOND State: VA
County:
License #: 041-313-1
Agreement: Y
Docket:
NRC Notified By: CHARLES COLEMAN
HQ OPS Officer: JEFF ROTTON
Licensee: E.I. DUPONT DE NEMOURS AND COMPANY
Region: 1
City: RICHMOND State: VA
County:
License #: 041-313-1
Agreement: Y
Docket:
NRC Notified By: CHARLES COLEMAN
HQ OPS Officer: JEFF ROTTON
Notification Date: 05/30/2017
Notification Time: 16:23 [ET]
Event Date: 05/30/2017
Event Time: 00:00 [EDT]
Last Update Date: 05/30/2017
Notification Time: 16:23 [ET]
Event Date: 05/30/2017
Event Time: 00:00 [EDT]
Last Update Date: 05/30/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
FRED BOWER (R1DO)
NMSS_EVENTS_NOTIFICA (EMAI)
FRED BOWER (R1DO)
NMSS_EVENTS_NOTIFICA (EMAI)
AGREEMENT STATE - FIXED GAUGE SHUTTER STUCK OPEN
The following information was provided by the Commonwealth of Virginia via email:
"On May 30, 2017, the licensee reported that the shutter of a fixed gauge failed to close during a routine test of the shutter mechanism. The gauge is a Ronan Model SA1, serial number 1093CK, with a 200 millicurie cesium-137 source (effective May 1995). It is used to measure the level of material inside a process vessel. The gauge is located approximately 10 feet from ground level. It is accessible only by a platform which has been restricted by the licensee. The licensee has contacted the manufacturer to repair or replace the gauge."
VA Event Report ID No.: VA-17-007
The following information was provided by the Commonwealth of Virginia via email:
"On May 30, 2017, the licensee reported that the shutter of a fixed gauge failed to close during a routine test of the shutter mechanism. The gauge is a Ronan Model SA1, serial number 1093CK, with a 200 millicurie cesium-137 source (effective May 1995). It is used to measure the level of material inside a process vessel. The gauge is located approximately 10 feet from ground level. It is accessible only by a platform which has been restricted by the licensee. The licensee has contacted the manufacturer to repair or replace the gauge."
VA Event Report ID No.: VA-17-007
Power Reactor
Event Number: 52777
Facility: CLINTON
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: GLENN BENJAMIN
HQ OPS Officer: JEFF ROTTON
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: GLENN BENJAMIN
HQ OPS Officer: JEFF ROTTON
Notification Date: 05/30/2017
Notification Time: 22:22 [ET]
Event Date: 05/30/2017
Event Time: 20:38 [CDT]
Last Update Date: 05/30/2017
Notification Time: 22:22 [ET]
Event Date: 05/30/2017
Event Time: 20:38 [CDT]
Last Update Date: 05/30/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
ROBERT DALEY (R3DO)
ROBERT DALEY (R3DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | A/R | Y | 28 | Power Operation | 0 | Hot Shutdown |
AUTOMATIC REACTOR SCRAM
"At 2038 [CDT], Clinton Power Station received an automatic RPS [Reactor Protection System]actuation. EOP-1 [Emergency Operating Procedure] was entered on RPV [Reactor Pressure Vessel] Level 3. The cause of the scram is unknown at this time. All systems responded appropriately following the scram and the plant is currently stable."
Reactor level is being maintained by normal feedwater and decay heat is being removed to the main condenser via the steam dump bypass valves. The plant is in a normal shutdown electrical lineup. The plant main generator was synchronized to the electrical grid and the plant was conducting control rod scram time testing at the time of the reactor trip.
The licensee notified the NRC Resident Inspector.
"At 2038 [CDT], Clinton Power Station received an automatic RPS [Reactor Protection System]actuation. EOP-1 [Emergency Operating Procedure] was entered on RPV [Reactor Pressure Vessel] Level 3. The cause of the scram is unknown at this time. All systems responded appropriately following the scram and the plant is currently stable."
Reactor level is being maintained by normal feedwater and decay heat is being removed to the main condenser via the steam dump bypass valves. The plant is in a normal shutdown electrical lineup. The plant main generator was synchronized to the electrical grid and the plant was conducting control rod scram time testing at the time of the reactor trip.
The licensee notified the NRC Resident Inspector.
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Non-Agreement State
Event Number: 52779
Rep Org: VETERANS HEALTH ADMINISTRATION
Licensee: VETERANS HEALTH ADMINISTRATION
Region: 4
City: NORTH LITTLE ROCK State: AR
County:
License #: 03-23853-01VA
Agreement: Y
Docket:
NRC Notified By: EDWIN LEIDHOLDT
HQ OPS Officer: JEFF ROTTON
Licensee: VETERANS HEALTH ADMINISTRATION
Region: 4
City: NORTH LITTLE ROCK State: AR
County:
License #: 03-23853-01VA
Agreement: Y
Docket:
NRC Notified By: EDWIN LEIDHOLDT
HQ OPS Officer: JEFF ROTTON
Notification Date: 05/31/2017
Notification Time: 20:08 [ET]
Event Date: 05/30/2017
Event Time: 07:00 [CDT]
Last Update Date: 04/04/2018
Notification Time: 20:08 [ET]
Event Date: 05/30/2017
Event Time: 07:00 [CDT]
Last Update Date: 04/04/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
20.1906(d)(2) - EXTERNAL RAD LEVELS > LIMITS
10 CFR Section:
20.1906(d)(2) - EXTERNAL RAD LEVELS > LIMITS
Person (Organization):
ROBERT DALEY (R3DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
ROBERT DALEY (R3DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
EXTERNAL CONTAMINATION ON PACKAGE GREATER THAN ALLOWABLE LIMITS
"Pursuant to 10 CFR 20.1906, Veterans Health Administration (VHA) National Health Physics Program is notifying NRC of the receipt of two packages of radioactive material with removable surface contamination on the outside that exceeded NRC reporting limits.
"The packages were received on the morning of Tuesday, May 30, 2017, by the Robert J. Dole VA Medical Center in Wichita, Kansas. This facility is a site of use under the VA St. Louis Health Care System, St. Louis, Missouri, which holds VHA permit number 24-00144-05 under the VHA master materials license. The packages were surveyed at about 0700 CDT. The wipe tests performed on the external surfaces of the packages indicated removable contamination of about 1,450 and 1,390 dpm/cm2 as compared to the regulatory limit of 240 dpm/cm2 for beta-gamma emitters. The packages contained unit dosages of fluorine-18 fluorodeoxyglucose. The packages were shipped from Cardinal Health in Wichita, Kansas, which was also the final delivery carrier. A facility nuclear medicine technologist notified the final delivery carrier by telephone of the contaminated packages soon after discovery of the contamination. VHA National Health Physics Program, which manages the master materials license, was notified of the incident at about 1700 CDT on Wednesday May 31, 2017.
"The VHA is aware that this notification does not conform to the timeliness requirements in 10 CFR 20.1906. VHA will take appropriate action regarding this apparent noncompliance. VHA will notify our NRC Region III Project Manager of this incident."
* * * RETRACTION ON 4/4/18 AT 1330 EDT FROM LYNN GRAVES TO DONALD NORWOOD * * *
"On July 18, 2017, the review by the facility Radiation Safety Officer (RSO) determined the event was 'suspect' due to radiation levels from a dose calibrator inducing spurious results in the well counter used for package surveys. The package did not have external radioactive contamination.
"The root cause of the report of contamination was identified by the PET [Positron Emission Tomography] technologist. It was a result of counting the package wipes with a radioactive source in the adjacent dose calibrator causing crosstalk between the two instruments. Correct technique was discussed by the RSO with the PET technologist. In addition, staff training of the correct technique was provided for all department personnel. During an onsite inspection in January 2018, the root cause was verified with the inspector having a high degree of confidence that the Wichita facility did not receive an externally contaminated package on May 30, 2017."
The licensee notified R3 (Parker).
Notified R3DO (Orth) and NMSS Events Notification E-mail group.
"Pursuant to 10 CFR 20.1906, Veterans Health Administration (VHA) National Health Physics Program is notifying NRC of the receipt of two packages of radioactive material with removable surface contamination on the outside that exceeded NRC reporting limits.
"The packages were received on the morning of Tuesday, May 30, 2017, by the Robert J. Dole VA Medical Center in Wichita, Kansas. This facility is a site of use under the VA St. Louis Health Care System, St. Louis, Missouri, which holds VHA permit number 24-00144-05 under the VHA master materials license. The packages were surveyed at about 0700 CDT. The wipe tests performed on the external surfaces of the packages indicated removable contamination of about 1,450 and 1,390 dpm/cm2 as compared to the regulatory limit of 240 dpm/cm2 for beta-gamma emitters. The packages contained unit dosages of fluorine-18 fluorodeoxyglucose. The packages were shipped from Cardinal Health in Wichita, Kansas, which was also the final delivery carrier. A facility nuclear medicine technologist notified the final delivery carrier by telephone of the contaminated packages soon after discovery of the contamination. VHA National Health Physics Program, which manages the master materials license, was notified of the incident at about 1700 CDT on Wednesday May 31, 2017.
"The VHA is aware that this notification does not conform to the timeliness requirements in 10 CFR 20.1906. VHA will take appropriate action regarding this apparent noncompliance. VHA will notify our NRC Region III Project Manager of this incident."
* * * RETRACTION ON 4/4/18 AT 1330 EDT FROM LYNN GRAVES TO DONALD NORWOOD * * *
"On July 18, 2017, the review by the facility Radiation Safety Officer (RSO) determined the event was 'suspect' due to radiation levels from a dose calibrator inducing spurious results in the well counter used for package surveys. The package did not have external radioactive contamination.
"The root cause of the report of contamination was identified by the PET [Positron Emission Tomography] technologist. It was a result of counting the package wipes with a radioactive source in the adjacent dose calibrator causing crosstalk between the two instruments. Correct technique was discussed by the RSO with the PET technologist. In addition, staff training of the correct technique was provided for all department personnel. During an onsite inspection in January 2018, the root cause was verified with the inspector having a high degree of confidence that the Wichita facility did not receive an externally contaminated package on May 30, 2017."
The licensee notified R3 (Parker).
Notified R3DO (Orth) and NMSS Events Notification E-mail group.