Event Notification Report for May 25, 2017
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/24/2017 - 05/25/2017
EVENT NUMBERS
52869
Power Reactor
Event Number: 52869
Facility: COLUMBIA GENERATING STATION
Region: 4 State: WA
Unit: [2] [] []
RX Type: [2] GE-5
NRC Notified By: SANDRA CHRISTIANSON
HQ OPS Officer: DONG HWA PARK
Region: 4 State: WA
Unit: [2] [] []
RX Type: [2] GE-5
NRC Notified By: SANDRA CHRISTIANSON
HQ OPS Officer: DONG HWA PARK
Notification Date: 07/24/2017
Notification Time: 13:36 [ET]
Event Date: 05/25/2017
Event Time: 16:47 [PDT]
Last Update Date: 07/24/2017
Notification Time: 13:36 [ET]
Event Date: 05/25/2017
Event Time: 16:47 [PDT]
Last Update Date: 07/24/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
MICHAEL HAY (R4DO)
MICHAEL HAY (R4DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | N | 0 | Refueling | 0 | Refueling |
INVALID HIGH PRESSURE CORE SPRAY (HPCS) SYSTEM ACTUATION IN MODE 5
"At 1647 [PDT] on May 25, 2017, during the performance of a post-maintenance test for replacement of a Reactor Pressure Vessel (RPV) low water level 3 indicator switch (MS-LIS-24A), a pressure perturbation in the common pressure reference line resulted in tripping of the RPV Level 2 instruments and an unplanned start of High Pressure Core Spray (HPCS) pump (HPCS-P-1) and its supporting emergency diesel (DG3). The Reactor Pressure Vessel was flooded up during the refueling outage, thus, the actuations of the HPCS pump and its supporting emergency diesel (DG3) were unplanned and invalid. The HPCS pump did not inject into the RPV due to the RPV level being above Level 8 which is an interlock to close the HPCS RPV injection valve (HPCS-V-4).
"During the event, the single train HPCS system initiated normally but did not inject into the reactor pressure vessel as expected due to flooded-up conditions of the reactor pressure vessel for refueling outage activities. The emergency diesel generator started normally in response to the initiation signal of HPCS. Both HPCS and the emergency diesel generator functioned successfully. All systems responded in conformance with their design and there was no safety significance associated with this event.
"At the time of the event, the licensee notified the NRC Resident [Inspector]."
"At 1647 [PDT] on May 25, 2017, during the performance of a post-maintenance test for replacement of a Reactor Pressure Vessel (RPV) low water level 3 indicator switch (MS-LIS-24A), a pressure perturbation in the common pressure reference line resulted in tripping of the RPV Level 2 instruments and an unplanned start of High Pressure Core Spray (HPCS) pump (HPCS-P-1) and its supporting emergency diesel (DG3). The Reactor Pressure Vessel was flooded up during the refueling outage, thus, the actuations of the HPCS pump and its supporting emergency diesel (DG3) were unplanned and invalid. The HPCS pump did not inject into the RPV due to the RPV level being above Level 8 which is an interlock to close the HPCS RPV injection valve (HPCS-V-4).
"During the event, the single train HPCS system initiated normally but did not inject into the reactor pressure vessel as expected due to flooded-up conditions of the reactor pressure vessel for refueling outage activities. The emergency diesel generator started normally in response to the initiation signal of HPCS. Both HPCS and the emergency diesel generator functioned successfully. All systems responded in conformance with their design and there was no safety significance associated with this event.
"At the time of the event, the licensee notified the NRC Resident [Inspector]."