Event Number: 52761
Facility: LASALLE
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: TODD CASAGRANDE
HQ OPS Officer: JEFF HERRERA
Region: 3 State: IL
Unit: [1] [] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: TODD CASAGRANDE
HQ OPS Officer: JEFF HERRERA
Notification Date: 05/17/2017
Notification Time: 12:29 [ET]
Event Date: 05/17/2017
Event Time: 09:08 [CDT]
Last Update Date: 05/17/2017
Notification Time: 12:29 [ET]
Event Date: 05/17/2017
Event Time: 09:08 [CDT]
Last Update Date: 05/17/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
JAMNES CAMERON (R3DO)
JAMNES CAMERON (R3DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
LOW PRESSURE CORE SPRAY PUMP INOPERABLE DUE TO MINIMUM FLOW VALVE CLOSURE
"This report is being made pursuant to 10 CFR 50.72(b)(3)(v)(D) for an event or condition that could have prevented fulfillment of a safety function needed to mitigate the consequences of an accident. The Low Pressure Core Spray (LPCS) Pump Injection HI Flow alarm was received at 09:08 CDT on May 17, 2017, at which point the minimum flow valve was observed to go closed. The LPCS pump remained in standby during the event. To prevent damage if the pump were to auto start, the control switch for the LPCS pump was placed in pull to lock. This condition prevents LPCS, a single train safety system, from performing its design function. This is a reportable condition as an 8 hour ENS notification.
"The required action of Technical Specifications (TS) 3.5.1, 'ECCS - Operating,' was entered on May 17, 2017 at 09:08 CDT when the condition was identified and the LPCS system was determined to be inoperable. Investigation into the cause of the condition is in progress. There were no related work activities in progress at the time the condition was identified."
The licensee notified the NRC Resident Inspector.
"This report is being made pursuant to 10 CFR 50.72(b)(3)(v)(D) for an event or condition that could have prevented fulfillment of a safety function needed to mitigate the consequences of an accident. The Low Pressure Core Spray (LPCS) Pump Injection HI Flow alarm was received at 09:08 CDT on May 17, 2017, at which point the minimum flow valve was observed to go closed. The LPCS pump remained in standby during the event. To prevent damage if the pump were to auto start, the control switch for the LPCS pump was placed in pull to lock. This condition prevents LPCS, a single train safety system, from performing its design function. This is a reportable condition as an 8 hour ENS notification.
"The required action of Technical Specifications (TS) 3.5.1, 'ECCS - Operating,' was entered on May 17, 2017 at 09:08 CDT when the condition was identified and the LPCS system was determined to be inoperable. Investigation into the cause of the condition is in progress. There were no related work activities in progress at the time the condition was identified."
The licensee notified the NRC Resident Inspector.