Skip to main content

Event Notification Report for January 23, 2017

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
01/22/2017 - 01/23/2017

EVENT NUMBERS
52505

Power Reactor
Event Number: 52505
Facility: LASALLE
Region: 3     State: IL
Unit: [] [2] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: CHRISTOPHER SMITH
HQ OPS Officer: BETHANY CECERE
Notification Date: 01/23/2017
Notification Time: 10:34 [ET]
Event Date: 01/23/2017
Event Time: 08:06 [CST]
Last Update Date: 01/23/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
KENNETH RIEMER (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 M/R Y 99 Power Operation 0 Hot Shutdown
Event Text
MANUAL REACTOR SCRAM DUE TO STATOR WATER COOLING RUNBACK SIGNAL AND TURBINE BYPASS VALVE OPENING

"This notification is being provided pursuant with 10 CFR 50.72 (b)(2)(iv)(B).

"[On January 23, 2017] at 0806 [CST], Unit 2 Manual Scram was inserted due to a Stator Water Cooling runback signal and a Turbine Bypass Valve opening. The Plant is stable, reactor pressure is being maintained with Bypass valves. Reactor water level is being controlled with feedwater. Investigation into the cause of the event is in progress."

All control rods fully inserted.

The licensee has notified the NRC Resident Inspector.