Event Number: 52361
Rep Org: OK DEQ RAD MANAGEMENT
Licensee: BUILDING AND EARTH SCIENCES
Region: 4
City: TULSA   State: OK
County:
License #: OK-31032-01
Agreement: Y
Docket:
NRC Notified By: KEVIN SAMPSON
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 11/10/2016
Notification Time: 15:30 [ET]
Event Date: 11/10/2016
Event Time: 14:00 [CST]
Last Update Date: 11/10/2016
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
VIVIAN CAMPBELL (R4DO)
NMSS_EVENTS_NOTIFICA (EMAI)
Event Text
AGREEMENT STATE REPORT - DAMAGED MOISTURE DENSITY GAUGE

The following report was received via e-mail:

"Building and Earth Sciences had a Troxler Model 3430 portable gauge run over by construction equipment at a temporary job site in Tulsa, OK. The source rod has been retracted and the sources are shielded. A leak test has been collected and will be counted as soon as possible. The gauge will be returned to Troxler for repair or disposal."


Non-Agreement State
Event Number: 52362
Rep Org: NORTHERN INDIANA PUBLIC SVC COMPANY
Licensee: NORTHERN INDIANA PUBLIC SVC COMPANY
Region: 3
City: VALPARAISO   State: IN
County:
License #: 13-14984-01
Agreement: N
Docket:
NRC Notified By: ANDREW G. FISHMAN
HQ OPS Officer: STEVE SANDIN
Notification Date: 11/11/2016
Notification Time: 12:57 [ET]
Event Date: 11/10/2016
Event Time: 14:00 [CST]
Last Update Date: 11/11/2016
Emergency Class: NON EMERGENCY
10 CFR Section:
30.50(b)(2) - SAFETY EQUIPMENT FAILURE
Person (Organization):
HIRONORI PETERSON (R3DO)
NMSS_EVENTS_NOTIFICA (EMAI)
Event Text
SHUTTER FAILURE ON A FIXED GAUGE

At 1400 CST on 11/10/16, technicians performed a routine shutter check on a fixed gauge located at their Wheatfield, IN facility. The gauge, a Kay-Ray Model 7062BP, S/N 30340 containing 50 mCi Cs-137 as of 8/81, failed to properly operate with the shutter returning to the mid-position. The shutter is currently in the locked closed position with no potential for personnel exposure. The gauge is 30 ft. above floor level with the beam directed upward. The licensee will contact the manufacturer for repairs.


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 52480
Facility: FITZPATRICK
Region: 1     State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: MARK HAWES
HQ OPS Officer: DONALD NORWOOD
Notification Date: 01/10/2017
Notification Time: 22:45 [ET]
Event Date: 11/10/2016
Event Time: 16:04 [EST]
Last Update Date: 03/23/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21(a)(2) - INTERIM EVAL OF DEVIATION
Person (Organization):
ANTHONY DIMITRIADIS (R1DO)
PART 21/50.55 REACT (EMAI)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 67 Power Operation 67 Power Operation
Event Text
PART 21 - FAILURE OF POWER SUPPLIES TO MEET VOLTAGE STABILITY SPECIFICATIONS

"This notification is a 10 CFR 21.21(a)(2) interim report for power supply model N-2ARPS-A6. Two instrument power supplies for the 'B' Residual Heat Removal (RHR) system were being bench tested prior to installation when it was discovered that they failed to meet Vendor Technical Manual specifications for voltage stability for varying loads. The deviation was a voltage drop of approximately 300mV. This did not meet the specification of less than 150mV when varying current from 5 amps (full load) to 2.5 amps. A second replacement power supply exhibited a similar 300 mV drop.

"James A. FitzPatrick (JAF) reviewed the work order instructions to determine if there was a deviation from the recommendations in the Foxboro technical manual F180-0309 Spec 200 Multinest Power Supply 2ARPS Series calibration. Since as-found voltage readings were within the required tolerance of the RHR instrument loops, the power supplies appear to have been capable to perform their intended function. However, this evaluation did not troubleshoot why the power supplies failed to meet the calibration requirements.

"The power supplies were sent to a repair vendor. The input from this vendor is expected to allow JAF to complete the evaluation per 10 CFR 21.21(a)(1) by March 21, 2017, and a notification for failure to comply or defect per 10 CFR 21.21(d)(3)(i) is expected by March 24, 2017, if necessary. This notification is being submitted as an interim report per 10 CFR 21.21(a)(2)."

The licensee notified the NRC Resident Inspector.

* * * RETRACTED AT 1705 EDT ON 03/23/17 FROM MARK HAWES TO S. SANDIN * * *

The licensee is retracting this report based on the following:

"The testing vendor Argo Turboserve Corp provided input to this condition in Non Conformance Report NC161. Engineering reviewed NC161 and discussed this condition with the vendor. The power supplies showed an initial drift following a 100 hour burn-in but continued operation was stable. Therefore, even though the initial voltage drift did not meet the power supply's calibration requirement in F180-0309, it would not be expected to drift significantly further. Engineering concluded that this condition will have a negligible impact on system components. Readings were steady and within the tolerance of the RHR instrument specification. Based on all current information, the component will function over its mission time of 100 days.

"Based on these results, a notification for failure to comply or defect per 10 CFR 21.21(d)(3)(i) is not required and the interim report per 10 CFR 21.21(a)(2) may be retracted."

The licensee informed the NRC Resident Inspector. Notified R1DO (Bickett) and Part 21 Group via email.