Event Number: 52159
Facility: HOPE CREEK
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: MARIAZ DAVIS
HQ OPS Officer: HOWIE CROUCH
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: MARIAZ DAVIS
HQ OPS Officer: HOWIE CROUCH
Notification Date: 08/07/2016
Notification Time: 04:45 [ET]
Event Date: 08/07/2016
Event Time: 01:01 [EDT]
Last Update Date: 08/07/2016
Notification Time: 04:45 [ET]
Event Date: 08/07/2016
Event Time: 01:01 [EDT]
Last Update Date: 08/07/2016
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
SILAS KENNEDY (R1DO)
SILAS KENNEDY (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
HIGH PRESSURE COOLANT INJECTION SYSTEM DECLARED INOPERABLE
"HPCI [high pressure coolant injection] governor valve did not respond as expected.
"During performance of a planned HPCI valve functional test the HPCI governor valve (FD-FV-4879) did not reposition as expected. The HCPI system has been declared inoperable based on the response per Technical Specification 3.5.1 action C.1. All other emergency core cooling systems and the reactor core isolation cooling (RCIC) system remain operable. The unit remains at 100% power.
"The station has initiated an event response team to identify and correct the cause of the failure. No personnel injuries resulted from the event.
"The licensee notified the NRC Resident Inspector and the Lower Alloways Creek Dispatch."
"HPCI [high pressure coolant injection] governor valve did not respond as expected.
"During performance of a planned HPCI valve functional test the HPCI governor valve (FD-FV-4879) did not reposition as expected. The HCPI system has been declared inoperable based on the response per Technical Specification 3.5.1 action C.1. All other emergency core cooling systems and the reactor core isolation cooling (RCIC) system remain operable. The unit remains at 100% power.
"The station has initiated an event response team to identify and correct the cause of the failure. No personnel injuries resulted from the event.
"The licensee notified the NRC Resident Inspector and the Lower Alloways Creek Dispatch."