Skip to main content

Event Notification Report for July 05, 2016

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
07/04/2016 - 07/05/2016

EVENT NUMBERS
52064

Power Reactor
Event Number: 52064
Facility: BRUNSWICK
Region: 2     State: NC
Unit: [] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: MICHAEL NAYLOR
HQ OPS Officer: VINCE KLCO
Notification Date: 07/05/2016
Notification Time: 20:01 [ET]
Event Date: 07/05/2016
Event Time: 16:40 [EDT]
Last Update Date: 07/05/2016
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
MARVIN SYKES (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
Event Text
HIGH PRESSURE COOLANT INJECTION (HPCI) SYSTEM DECLARED INOPERABLE

"On July 5, 2016, at 1640 Eastern Daylight Savings Time (EDT) the Unit 2 HPCI system was declared inoperable due to apparent failure of the HPCI Auxiliary Oil Pump after the 'HPCI Aux Oil Pump Motor Overload' control room annunciator was received. Failure of the HPCI Auxiliary Oil Pump prevents the HPCI system from performing its design safety function. As such, this event is being reported in accordance with 10 CFR 50.72(b)(3)(v)(D) as a condition that at the time of discovery could have prevented the fulfillment of the safety function of a system that is needed to mitigate the consequences of an accident.

"This event did not result in any adverse impact to the health and safety of the public.

"The NRC Senior Resident Inspector has been notified.

"The safety significance of this condition is minimal. All other Emergency Core Cooling Systems and the Reactor Core Isolation Cooling (RCIC) system remain operable.

"Troubleshooting activities are in progress. The HPCI system will remain inoperable until the cause of the failure has been corrected."