Event Notification Report for April 30, 2016

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
04/29/2016 - 04/30/2016

EVENT NUMBERS
51895

Power Reactor
Event Number: 51895
Facility: OYSTER CREEK
Region: 1     State: NJ
Unit: [1] [] []
RX Type: [1] GE-2
NRC Notified By: ANDREW KRUKOWSKI
HQ OPS Officer: DANIEL MILLS
Notification Date: 04/30/2016
Notification Time: 19:14 [ET]
Event Date: 04/30/2016
Event Time: 18:04 [EDT]
Last Update Date: 04/30/2016
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
JAMES DWYER (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R Y 0 Startup 0 Hot Shutdown
Event Text
MANUAL SCRAM DURING REACTOR STARTUP DUE TO INCREASE IN UNIDENTIFIED LEAK RATE

"Today at 1804 EDT, a manual scram was processed during startup due to rising unidentified leak rate. The rise in unidentified leak rate was identified to be coming from the D Reactor Recirc Pump seal cavity. All rods inserted into the core and all systems functioned as expected during the scram.

"The event is reportable within 4 hours per 10 CFR 50.72(b)(2)(iv)(B) - any event or condition that results in actuation of the reactor protection system (RPS) when the reactor is critical except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation."

The reactor is stable in hot shutdown.

The licensee notified the NRC Resident Inspector.