Power Reactor
Event Number: 51547
Facility: TURKEY POINT
Region: 2     State: FL
Unit: [3] [] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: NICHOLAS DESANTIS
HQ OPS Officer: STEVEN VITTO
Notification Date: 11/18/2015
Notification Time: 09:53 [ET]
Event Date: 11/18/2015
Event Time: 03:26 [EST]
Last Update Date: 01/19/2016
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
MIKE ERNSTES (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Cold Shutdown 0 Cold Shutdown
Event Text
INVALID ACTUATION OF 3A EMERGENCY DIESEL GENERATOR (EDG)

"This is a non-emergency eight hour notification in accordance with 10 CFR 50.72(b)(3)(iv)(A), for an automatic actuation of the 3A Emergency Diesel Generator (EDG).

"On 11/18/15 at approximately 0326 [EST] a loss of power was experienced on the 3A 4KV Bus. The redundant 3B 4KV bus did not experience a loss of power. All systems operated as expected following the loss of power with the 3A EDG automatically sequencing onto the 3A 4KV bus and the load sequencer loading as designed. At the time of the actuation, Unit 3 was in a refueling outage in MODE 5. Investigation into the cause of the loss of power is in progress. There was no impact on Unit 4 operation during this time."

The NRC Resident Inspector has been informed.

* * * UPDATE AT 2100 EST ON 01/19/16 FROM JIM SPEICHER TO S. SANDIN * * *

The licensee is retracting the original notification of a valid actuation and has re-categorized this as a 60-day optional report based on the following:

"This 60-day telephone notification is being made under the reporting requirements specified by 10 CFR 50.73(a)(2)(iv)(A) and 10 CFR 50.73(a)(1) to describe an invalid actuation of the 3A EDG. The 3A EDG start resulted from an unexpected actuation of the 3A load sequencer during setup activities for the 3A Engineered Safeguards Integrated Test (ESIT) loss of offsite power (LOOP) sequence.

"On November 18, 2015, at approximately 0330 EST with Unit 3 in Mode 5 during a refueling outage, an unexpected LOOP occurred on the 3A 4160 V bus. At the time, an Instrument and Control (I&C) specialist was working in sequencer cabinet 3C23A verifying proper placement of flags in preparation for the installation of a local test switch that would be used to initiate the 3A ESIT LOOP signal. The 3A EDG started and functioned as designed. Initial troubleshooting determined that there were no actual plant conditions or parameters (e.g., undervoltage, degraded voltage, manual initiation) involved in the actuation.

"The root cause investigation revealed that individuals working in the room near the open cabinet did not have their mobile phones in airplane mode as required and two computer tablets being used adjacent to the sequencer cabinet were not in airplane mode as required prior to entering the 3A sequencer room. The cause of the actuation was determined to be an unintended human interaction in the form of electromagnetic or radio frequency interference at the proximity of the 3C23A cabinet.

"The licensee notified the NRC Resident Inspector."

Notified R2DO (McCoy).


Power Reactor
Event Number: 51549
Facility: GRAND GULF
Region: 4     State: MS
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: SEAN DUNFEE
HQ OPS Officer: DONG HWA PARK
Notification Date: 11/18/2015
Notification Time: 18:30 [ET]
Event Date: 11/18/2015
Event Time: 10:53 [CST]
Last Update Date: 11/18/2015
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 - FITNESS FOR DUTY
Person (Organization):
GREG WARNICK (R4DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
FITNESS FOR DUTY - UNOPENED CAN OF ALCOHOLIC BEVERAGE FOUND IN THE PROTECTED AREA

"An 8 oz. can of alcohol 'Mike's Harder Lemonade' (8% by volume) was discovered inside the protected area. The can was unopened. Site security took possession of the can and removed it from the protected area. This report is being made under 10CFR26.719(b)(1) as a 24 hour telephone notification.

"The licensee notified the NRC Resident Inspector."


Agreement State
Event Number: 51550
Rep Org: MARYLAND DEPT OF THE ENVIRONMENT
Licensee: HITTMAN TRANSPORT SERVICES
Region: 1
City:   State: MD
County: WASHINGTON
License #:
Agreement: Y
Docket:
NRC Notified By: RAY MANLEY
HQ OPS Officer: DONG HWA PARK
Notification Date: 11/18/2015
Notification Time: 18:40 [ET]
Event Date: 11/18/2015
Event Time: 18:00 [EST]
Last Update Date: 11/18/2015
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
DAN SCHROEDER (R1DO)
BERNARD STAPLETON (IRD)
PAM HENDERSON (NMSS)
NMSS_EVENTS_NOTIFICA (EMAI)
Event Text
TRUCK CONTAINING LOW LEVEL WASTE RADIOACTIVE MATERIAL OVERTURNED

At approximately 1800 EST on 11/18/2015, the Maryland State Police responded to an overturned truck on route I-81 in Washington County, MD. The truck departed Three Mile Island Nuclear Generating Station en route to Oak Ridge, TN. Maryland Department of Environment responded to the site with radiation detectors and the hazmat team. The radioactive material was classified as low level waste and contained within the vehicle. The radiation levels on contact were very low, and at 1 meter, radiation levels were at background levels. The State Police closed the road for accident reconstruction.


Power Reactor
Event Number: 51551
Facility: TURKEY POINT
Region: 2     State: FL
Unit: [3] [] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: DIRK DRINKARD
HQ OPS Officer: HOWIE CROUCH
Notification Date: 11/19/2015
Notification Time: 00:56 [ET]
Event Date: 11/18/2015
Event Time: 23:33 [EST]
Last Update Date: 11/19/2015
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
MIKE ERNSTES (R2DO)
BERNARD STAPLETON (IRD)
SCOTT MORRIS (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Cold Shutdown 0 Cold Shutdown
Event Text
AFTER-THE-FACT NOTIFICATION OF UNUSUAL EVENT

"Unit 3 experienced Loss of Offsite Power due to lockout on Unit 3 Startup transformer. The 3B EDG auto started and loaded on the 3B 4KV Bus. The 3A Sequencer was out of service and prevented the 3A EDG from auto starting and supplying 3A 4KV busses. With only 3B 4KV bus powered from an EDG and no offsite power to Unit 3, Unit 3 entered an Unusual Event.

"Core cooling was restored with 3B RHR pump at 2343 EST. At 2350 EST, 3A 4KV Bus was manually loaded onto 3A EDG and conditions for Unusual Event were terminated.

"Additionally this is a non-emergency eight hour notification in accordance with 10CFR50.72(b)(3)(iv)(A), for a valid automatic actuation of the 3B Emergency Diesel Generator."

While core cooling was lost, the core experienced a 3 degree heat up. Spent fuel pit cooling has also been restored. The cause of the transformer lockout is under investigation.

Unit 4 was unaffected and continues to operate at 100% power.

The licensee has notified state and local authorities about this event. The licensee has also notified the NRC Resident Inspector.