Event Notification Report for May 13, 2015
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/12/2015 - 05/13/2015
EVENT NUMBERS
51174
Power Reactor
Event Number: 51174
Facility: PILGRIM
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: EVERETT PERKINS
HQ OPS Officer: DANIEL MILLS
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: EVERETT PERKINS
HQ OPS Officer: DANIEL MILLS
Notification Date: 06/23/2015
Notification Time: 16:57 [ET]
Event Date: 05/13/2015
Event Time: 00:00 [EDT]
Last Update Date: 06/23/2015
Notification Time: 16:57 [ET]
Event Date: 05/13/2015
Event Time: 00:00 [EDT]
Last Update Date: 06/23/2015
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
JOHN ROGGE (R1DO)
JOHN ROGGE (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
VOLUNTARY REPORT - INFORMATION ONLY
"On May 13, 2015, with the unit shut down and the mode switch in Refuel, during the performance of plant procedure 3.M.2-12.4, 'Backfilling Reference Lines for Racks C2205, C2275, and C2251' a full reactor scram occurred. The scram occurred at Step [26](b) of Attachment #1 of the procedure. The plant had been shut down for refueling for a couple of weeks or more and was in 'cold' condition. This event was evaluated for potential reportability under both 10 CFR 50.72 and 50.73 and found to be not reportable as either a prompt report or LER. The following 'System Actuation' sections were most applicable.
"10CFR50.72(b)(2)(iv)(B) Any event or condition that results in actuation of the reactor protection system (RPS) when the reactor is critical - Plant Response: Pilgrim was not critical at the time of the event.
"10CFR50.72(b)(3(iv)(A) Any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B) - Plant Response: Pilgrim was in the process of refilling reference legs as part of restoration from the refueling outage. This was not a valid RPS signal.
"10CFR50.73(a)(2)(iv)(A) Any event or condition that resulted in manual or automatic actuation of any of the systems listed in paragraph (a)(2)(iv)(B) of this section, except when: (2) The actuation was invalid and; (i) Occurred while the system was properly removed from service - Plant Response: This was an invalid actuation that occurred when the system was already properly removed from service. All requirements of plant procedures for removing equipment from service had been met. That included required clearance documentation, equipment and control board tagging and properly positioned valves and power supply breakers.
"Although this event is not reportable, we are making a courtesy notification to the NRC Operations Center."
"On May 13, 2015, with the unit shut down and the mode switch in Refuel, during the performance of plant procedure 3.M.2-12.4, 'Backfilling Reference Lines for Racks C2205, C2275, and C2251' a full reactor scram occurred. The scram occurred at Step [26](b) of Attachment #1 of the procedure. The plant had been shut down for refueling for a couple of weeks or more and was in 'cold' condition. This event was evaluated for potential reportability under both 10 CFR 50.72 and 50.73 and found to be not reportable as either a prompt report or LER. The following 'System Actuation' sections were most applicable.
"10CFR50.72(b)(2)(iv)(B) Any event or condition that results in actuation of the reactor protection system (RPS) when the reactor is critical - Plant Response: Pilgrim was not critical at the time of the event.
"10CFR50.72(b)(3(iv)(A) Any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B) - Plant Response: Pilgrim was in the process of refilling reference legs as part of restoration from the refueling outage. This was not a valid RPS signal.
"10CFR50.73(a)(2)(iv)(A) Any event or condition that resulted in manual or automatic actuation of any of the systems listed in paragraph (a)(2)(iv)(B) of this section, except when: (2) The actuation was invalid and; (i) Occurred while the system was properly removed from service - Plant Response: This was an invalid actuation that occurred when the system was already properly removed from service. All requirements of plant procedures for removing equipment from service had been met. That included required clearance documentation, equipment and control board tagging and properly positioned valves and power supply breakers.
"Although this event is not reportable, we are making a courtesy notification to the NRC Operations Center."