Skip to main content

Event Notification Report for September 13, 2014

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
09/12/2014 - 09/13/2014

EVENT NUMBERS
50455

Power Reactor
Event Number: 50455
Facility: HATCH
Region: 2     State: GA
Unit: [1] [] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: STANLEY STONE
HQ OPS Officer: CHARLES TEAL
Notification Date: 09/13/2014
Notification Time: 09:53 [ET]
Event Date: 09/13/2014
Event Time: 03:07 [EDT]
Last Update Date: 09/13/2014
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(B) - UNANALYZED CONDITION
Person (Organization):
SCOTT SHAEFFER (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
FIRE PENETRATION DID NOT MEET APPENDIX R REQUIREMENTS

"A fire penetration on the Unit 1 reactor building 158 foot elevation was discovered to be degraded such that the associated wall would not meet Appendix R requirements as a 3-hour barrier. In the event of a postulated fire in either of the affected fire areas, separated by the affected penetration, both Unit 1 safe shutdown paths could be compromised. Given this information, the determination was made that this condition meets the reporting criteria of 10CFR50.72(b)(3)(ii)(B).

"Compensatory measures were established in accordance with the plant's Fire Hazard Analysis (FHA). The presence of the compensatory measures in addition to automatic fire detection in these fire areas ensure that the safe shutdown paths are preserved until the degraded condition can be corrected.

"Condition Report: 865615"

The NRC Resident Inspector has been informed.