Event Notification Report for July 20, 2014

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
07/19/2014 - 07/20/2014

EVENT NUMBERS
5028750288

Power Reactor
Event Number: 50287
Facility: TURKEY POINT
Region: 2     State: FL
Unit: [3] [4] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: ROBERT PELL
HQ OPS Officer: DONALD NORWOOD
Notification Date: 07/20/2014
Notification Time: 20:02 [ET]
Event Date: 07/20/2014
Event Time: 14:54 [EDT]
Last Update Date: 08/08/2014
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(B) - POT RHR INOP
Person (Organization):
GERALD MCCOY (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N Y 100 Power Operation 100 Power Operation
4 N Y 100 Power Operation 95 Power Operation
Event Text
ULTIMATE HEAT SINK TEMPERATURE EXCEEDED TECHNICAL SPECIFICATION LIMIT

"At 1454 EDT on 20 July 2014, Turkey Point Units 3 and 4 entered the Action for Technical Specification (TS) 3.7.4, Ultimate Heat Sink (UHS). The action was entered because UHS temperature exceeded the limit of 100 degrees F due to a natural event. This report is in accordance with 10CFR50.72(b)(3)(v)(B) because UHS capability to remove residual heat is impacted. At 1800 EDT the NRC verbally approved a natural event Notice of Enforcement Discretion (NOED) which allows the ultimate heat sink temperature to exceed 100 degrees F up to 103 degrees F. Unit power levels have been maintained at Unit 3 100% and Unit 4 95%.

"The NRC Resident Inspector has been notified."

* * * UPDATE FROM CHRIS TRENT TO DANIEL MILLS AT 2058 EDT ON 7/26/2014 * * *

"At 2046 on 7/20/14, Turkey Point Units 3 and 4 exited the Action for Technical Specification (TS) 3.7.4, Ultimate Heat Sink, when the ultimate heat sink (UHS) temperature decreased below the TS limit of 100 degrees F.

"At 1604 on 7/26/14, Turkey Point Units 3 and 4 entered the Action for TS 3.7.4, Ultimate Heat Sink. The action was entered because UHS temperature exceeded the limit of 100 degrees F. This report is in accordance with 10 CFR 50.72(b)(3)(v)(B) because UHS capability to remove residual heat is impacted. Turkey Point is currently complying with NOED No. 14-2-001, which allows a temporary maximum UHS temperature of 103 degrees F.

"The NRC Resident Inspector was notified."

At 2058 on 7/26/14 the UHS average temperature was 100.3 degrees F and the peak temperature was 100.5 degrees F. Unit 4 is currently operating at 75% power in anticipation of elevated intake temperature in the next several days.

Notified R2DO (Musser)

* * * UPDATE FROM JOSE VASQUEZ TO DANIEL MILLS AT 1913 EDT ON 7/27/2014 * * *

"At 2102 on 7/26/14, Turkey Point Units 3 and 4 exited the Action for Technical Specification (TS) 3.7.4, Ultimate Heat Sink, when the ultimate heat sink (UHS) temperature decreased below the TS limit of 100 degrees F.

"At 1602 on 7/27/14, Turkey Point Units 3 and 4 entered the Action for TS 3.7.4, Ultimate Heat Sink. The action was entered because UHS temperature exceeded the limit of 100 degrees F. This report is in accordance with 10 CFR 50.72(b)(3)(v)(B) because UHS capability to remove residual heat is impacted. Turkey Point is currently complying with NOED No. 14-2-001, which allows a temporary maximum UHS temperature of 103 degrees F.

"The NRC Resident Inspector was notified."

At 1913 on 7/27/14 the UHS average temperature was 101.1 degrees F and the peak temperature was 101.3 degrees F. Units 3 and 4 are currently operating at 75% power in anticipation of elevated intake temperature in the next several days.

Notified R2DO (Musser)

* * *UPDATE PROVIDED BY CHRISTOPHER TRENT TO JEFF ROTTON AT 2103 EDT ON 07/28/2014 * * *

"At 2212 on 7/27/14, Turkey Point Units 3 and 4 exited the Action for Technical Specification (TS) 3.7.4, Ultimate Heat Sink, which was entered at 1602 on 7/27/14, when the ultimate heat sink (UHS) temperature decreased below the TS limit of 100 degrees F.

"At 1445 on 7/28/14, Turkey Point Units 3 and 4 entered the Action for TS 3.7.4, Ultimate Heat Sink. The action was entered because UHS temperature exceeded the limit of 100 degrees F. This report is in accordance with 10 CFR 50.72(b)(3)(v)(B) because UHS capability to remove residual heat is impacted. Turkey Point is currently complying with NOED No. 14-2-001, which allows a temporary maximum UHS temperature of 103 degrees F.

"At 1946 on 7/28/14, UHS temperature decreased below the TS limit of 100 degrees F and Turkey Point Units 3 and 4 exited the Action for Technical Specification (TS) 3.7.4, Ultimate Heat Sink.

'The NRC Resident Inspector was notified."

Peak UHS temperature reached on 7/28/2014 was 101.1 degrees F. Units 3 and 4 are currently operating at 75 percent power in anticipation of continued elevated intake temperatures.

Notified R2DO (Musser)

* * * UPDATE FROM ADRIAN GONZALEZ TO HOWIE CROUCH AT 2113 EDT ON 8/7/14 * * *

"At 1455 on 08/07/14, Turkey Point Units 3 and 4 entered the Action for TS 3/4.7.4, Ultimate Heat Sink. The action was entered because UHS temperature exceeded the limit of 100 degrees F. This report is in accordance with 10 CFR 50.72(b)(3)(v)(B) because UHS capability to remove residual heat is impacted. Turkey Point is currently complying with NOED No. 14-2-001, which allows a temporary maximum UHS temperature of 103 degrees F.

"The NRC Resident lnspector was notified."

UHS temperature was at 100.4 F at the time of the notification.

Notified R2DO (Nease).

* * * UPDATE FROM ADRIAN GONZALEZ TO S. SANDIN AT 1900 EDT ON 8/8/14 * * *

"At 1445 EDT on 08/08/14 Turkey Point Units 3 and 4 entered Action for TS 3/4.7.4, Ultimate Heat Sink. The action was entered because UHS temperature exceeded the limit of 100 degrees F. On 8/08/14 at 1556 EDT Turkey Point Units 3 and 4 received Amendment No. 261 to Renewed Facility Operating License No. DPR-31 and Amendment No. 256 to Renewed Facility Operating License No. DPR-41 for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 and exited the Action for TS 3/4.7 .4, Ultimate Heat Sink."

The licensee informed the NRC Resident Inspector.

UHS temperature was at 101.24 F at the time of the notification.

Notified R2DO (Nease).


Power Reactor
Event Number: 50288
Facility: OCONEE
Region: 2     State: SC
Unit: [1] [2] [3]
RX Type: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-LP
NRC Notified By: B. Le CROY
HQ OPS Officer: STEVE SANDIN
Notification Date: 07/20/2014
Notification Time: 21:12 [ET]
Event Date: 07/20/2014
Event Time: 19:53 [EDT]
Last Update Date: 07/20/2014
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
GERALD MCCOY (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
SMALL KEOWEE HYDROELECTRIC STATION OIL DISCHARGED TO THE KEOWEE RIVER

"On 7/20/2014, at 1700 hours EDT, a spill of approximately five (5) gallons of Teresstic 68 lube oil was identified in the Keowee Hydroelectric Station (KHS) tailrace. Teresstic 68 oil is used at the station as an equipment lubricant. The KHS tailrace feeds into the Keowee River that leads into Lake Hartwell. The estimated area of the oil sheen is approximately 30x50 feet and a cleanup response is currently in progress. The cause of the spill was attributed to a faulty oil float switch in the KHS unwatering pump that allowed the oil to spill into the KHS tailrace (Keowee River).

"South Carolina Department of Health and Environmental Control (SCDHEC) and the National Response Center were notified of the spill on 7/20/2014 at approximately 2002 and 1953 hours [EDT] respectively.

"This event was determined to be reportable pursuant to 10CFR50.72(b)(2)(xi) due to the notifications to the SCDHEC and the National Response Center.

"The licensee notified the NRC Resident Inspector.

"Initial Safety Significance: The oil did not contain any plant produced radiological material and while contained, poses no safety risk with respect to the health and safety of the public.

"Corrective Action(s): The oil spill sheen is isolated to an approximate 30x50 foot area of the Keowee River. Because the KHS is currently not operating, the water spill area is stagnant, i.e., there is little or no movement of the water containing the oil sheen. The source of the leak has been contained and an investigation is underway to determine the actual cause of the spill. There was no impact on plant operations. The event was entered into the station's corrective action program."