Event Notification Report for March 09, 2014

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
03/08/2014 - 03/09/2014

EVENT NUMBERS
50089

Power Reactor
Event Number: 50089
Facility: PEACH BOTTOM
Region: 1     State: PA
Unit: [2] [3] []
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: DAN DULLUM
HQ OPS Officer: DONALD NORWOOD
Notification Date: 05/06/2014
Notification Time: 12:50 [ET]
Event Date: 03/09/2014
Event Time: 16:13 [EST]
Last Update Date: 05/06/2014
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
JOHNATHAN LILLIENDAH (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
60-DAY OPTIONAL TELEPHONIC NOTIFICATION FOR AN INVALID ACTUATION OF AN EMERGENCY SERVICE WATER SYSTEM

"This 60-day report, as allowed by 10CFR 50.73(a)(1), is being made pursuant to 10CFR 50.73(a)(2)(iv)(A) to describe an unplanned, invalid actuation of an emergency service water system.

"On 3/9/14, at approximately 1536 EST, the E2 Emergency Diesel Generator (EDG) was started for a post maintenance operability test. The 'A' safety-related Emergency Service Water (ESW) pump was being used to provide cooling to the EDG. At approximately 1613 EST and 1622 EST, unexpected automatic starts of the 'B' ESW pump and the non-safety related single train Emergency Cooling Water (ECW) pump occurred. The EDG run was terminated at 1622 EST to investigate the cause of the unexpected starts.

"It was determined that a failed angle drive adaptor resulted in invalid input to the speed switch, which resulted in the unplanned starts of the 'B' ESW pump and the ECW pump. Except for the failure of the angle drive adaptor, all systems and equipment operated as expected.

"The NRC resident has been informed of this notification."