Event Notification Report for September 19, 2013

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
09/18/2013 - 09/19/2013

EVENT NUMBERS
4936149362493634936449357

Power Reactor
Event Number: 49361
Facility: PRAIRIE ISLAND
Region: 3     State: MN
Unit: [1] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: STEPHEN SEILHYMER
HQ OPS Officer: CHARLES TEAL
Notification Date: 09/19/2013
Notification Time: 17:13 [ET]
Event Date: 09/19/2013
Event Time: 12:20 [CDT]
Last Update Date: 09/19/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(B) - UNANALYZED CONDITION
Person (Organization):
KENNETH RIEMER (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 80 Power Operation 80 Power Operation
Event Text
NO DOCUMENTED PLAN IN PLACE TO RECEIVE ADDITIONAL FUEL OIL DURING MAXIMUM PROBABLE FLOOD CONDITION

"On September 19, 2013, a potential unanalyzed condition was identified. The current licensing basis requires a 14 day supply of fuel oil. Preliminary calculations show that there is sufficient tank volume for the duration of design basis maximum probable flood condition. However, during maximum flood condition there is currently no documented plan in place to receive additional fuel oil to maintain Unit 1 and Unit 2 Emergency Diesel Generators operable and running to supply emergency power to essential loads for the duration of the effects of a design basis maximum probable flood condition. These effects, such as flooded roads, may exceed 14 days. This is not an immediate safety concern because additional fuel oil can be added to the fuel oil storage tanks for imminent flood conditions.

"The NRC Resident has been notified."


Power Reactor
Event Number: 49362
Facility: RIVER BEND
Region: 4     State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: DANIEL PIPKIN
HQ OPS Officer: HOWIE CROUCH
Notification Date: 09/19/2013
Notification Time: 20:31 [ET]
Event Date: 09/19/2013
Event Time: 14:37 [CDT]
Last Update Date: 09/19/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
RICK DEESE (R4DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
SECONDARY CONTAINMENT INOPERABLE DUE TO AN UNATTENDED OPEN DOOR

"Security personnel reported to the Main Control Room that at time 1437 CDT, an alarm indicated that a secondary containment door was open beyond the normal delay time allowed for entry and exit. Security personnel responded and found the door open and unattended with the dogs extended meaning that the door was unable to be closed. Security personnel secured the door at time 1441 CDT. No deficiencies were found with the door. The fact that the door was open and unattended beyond the time allowed for normal entry and exit violates Technical Specification 3.6.4.1, 'Secondary Containment- Operating,' because surveillance requirement SR 3.6.4.1.3 was not met. This surveillance requires that doors be closed except during normal entry and exit.

"In summary, an SSC was inoperable in a required mode as a result of a personnel error and no redundant equipment in the same system was operable. Thus, the condition is reportable under 10CFR50.72(b)(3)(v)(D)."

The licensee notified the NRC Resident Inspector.


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 49363
Facility: MONTICELLO
Region: 3     State: MN
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: LT IHLENFELDT
HQ OPS Officer: JOHN SHOEMAKER
Notification Date: 09/19/2013
Notification Time: 23:56 [ET]
Event Date: 09/19/2013
Event Time: 17:50 [CDT]
Last Update Date: 10/28/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
KENNETH RIEMER (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
HIGH PRESSURE COOLANT INJECTION INOPERABLE DUE TO STEAM LEAK

"On 9/19/2013, during the performance of the High Pressure Coolant Injection (HPCI) quarterly pump and valve surveillance, a steam leak was discovered. HPCI had previously been declared inoperable due to planned maintenance. As a result of the steam leak, HPCI remains inoperable.

"Action taken: 14 days Required Action TS 3.5.1.J.2 remains in effect and corrective actions are in progress.

"The licensee has notified the NRC Resident Inspector."

* * * RETRACTION FROM RANDY SAND TO PETE SNYDER AT 1546 EDT ON 10/28/13 * * *

"The licensee performed an evaluation that determined the minor steam leak from the High Pressure Coolant Injection (HPCI) turbine reported on 9/20/2013 was not significant enough to prevent HPCI from mitigating the consequences of an accident or mitigating a Station Blackout (SBO) event.

"The licensee performed an engineering evaluation of the HPCI system, the HPCI pump/turbine and the HPCI room environmental conditions assuming conservative leakage conditions existed. The results of this evaluation confirmed that the HPCI system would have been able to perform its design function assuming conservative leakage conditions existed throughout limiting events. The HPCI pump/turbine would not have failed during any accident or SBO event, and sufficient motive (steam) force was available for the HPCI system to perform its design functions. There would have been no unacceptable impact on the HPCI pump/turbine oil system due to the steam leak. The HPCI room environment would not have exceeded allowable limits. For events where AC power is available, the analysis took advantage of the HPCI room cooler that is powered from an essential power source and supplied from a safety related service water system. This cooler was available during the period of the steam leak. The evaluation of room conditions for SBO conditions did not include use of the HPCI room cooler and also showed room conditions would have remained within acceptable values. There would not have been a buildup of fluid sufficient to cause a flood in the HPCI room.

"Therefore, based on the results of the formal engineering evaluation, the HPCI system was capable of performing its safety function and therefore, this event may be retracted."

The licensee will notify the NRC Resident Inspector. Notified R3DO (Daley).


Power Reactor
Event Number: 49364
Facility: COOK
Region: 3     State: MI
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: CHRIS PEAK
HQ OPS Officer: BILL HUFFMAN
Notification Date: 09/20/2013
Notification Time: 05:42 [ET]
Event Date: 09/19/2013
Event Time: 22:30 [EDT]
Last Update Date: 09/20/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
KENNETH RIEMER (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
OFFSITE NOTIFICATION DUE TO AN INADVERTENT ACTIVATION OF AN EMERGENCY SIREN

"On 9/19/13 at approximately 2230 EDT, Emergency Siren 602 inadvertently actuated. Berrien County Dispatch was notified by local residents at 2237 EDT. The cause of the actuation is under investigation but believed to be due to rain water intrusion. The siren was subsequently disconnected by a station technician to prevent further erroneous actuation. The siren remains out of service and is the only siren out of service within the 10 mile Emergency Planning Zone (EPZ). There are a total of 70 sirens.

"This notification is being made under 10 CFR 50.72(b)(2)(xi), Offsite Notification, as a four (4) hour report. The Operations Shift Manager was notified of the actuation on 9/20/13 at 0340 EDT.

"The licensee has notified the NRC Resident Inspector."


Power Reactor
Event Number: 49357
Facility: DUANE ARNOLD
Region: 3     State: IA
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: NATHAN PIEPER
HQ OPS Officer: JOHN SHOEMAKER
Notification Date: 09/19/2013
Notification Time: 09:58 [ET]
Event Date: 09/19/2013
Event Time: 04:50 [CDT]
Last Update Date: 09/25/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
KENNETH RIEMER (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
TECHNICAL SUPPORT CENTER EMERGENCY DIESEL GENERATOR REMOVED FROM SERVICE FOR PLANNED MAINTENANCE

"A planned maintenance evolution at the Duane Arnold Energy Center (DAEC) will remove the emergency power supply to the TSC from service. The TSC would be rendered non-functional with the loss of emergency power. The repair to the power supply is expected to last 2 hours.

"If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures. Maintenance will be expedited to restore the emergency power supply to service.

"This notification is being made in accordance with 10CFR50.72(b)(3)(xiii) due to the loss of an Emergency Response Facility (ERF). An update will be provided once the TSC emergency power supply has been restored to normal operation.

"NRC Resident Inspector has been notified."

* * * UPDATE FROM TIM ERGER TO HOWIE CROUCH AT 1325 EDT ON 9/22/13 * * *

The TSC EDG remains unavailable due to emergent work. The licensee has notified the NRC Resident Inspector.

Notified R3DO (Riemer).

* * * UPDATE FROM MIKE STROPE TO DANIEL MILLS AT 1237 EDT ON 9/25/13 * * *

The TSC EDG has returned to functional status. The licensee notified the NRC Resident Inspector.

Notified R3DO (Dickson).