Event Notification Report for August 29, 2013

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
08/28/2013 - 08/29/2013

EVENT NUMBERS
4931349314

Power Reactor
Event Number: 49313
Facility: MILLSTONE
Region: 1     State: CT
Unit: [] [2] []
RX Type: [1] GE-3,[2] CE,[3] W-4-LP
NRC Notified By: JASON BOOKMILLER
HQ OPS Officer: HOWIE CROUCH
Notification Date: 08/29/2013
Notification Time: 11:33 [ET]
Event Date: 08/29/2013
Event Time: 08:44 [EDT]
Last Update Date: 08/29/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
CHRISTOPHER NEWPORT (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF ASSESSMENT CAPABILITY DUE TO RADIATION MONITOR OUT OF SERVICE FOR PLANNED MAINTENANCE

Millstone Unit 2 removed their plant high range stack radiation monitor RM-8168 from service for pre-planned maintenance. This represents a reportable loss of assessment capability under 10CFR50.72(b)(3)(xiii).

The licensee has notified the NRC Resident Inspector.


Power Reactor
Event Number: 49314
Facility: MONTICELLO
Region: 3     State: MN
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: MARK IHLENFELDT
HQ OPS Officer: VINCE KLCO
Notification Date: 08/29/2013
Notification Time: 18:35 [ET]
Event Date: 08/29/2013
Event Time: 11:00 [CDT]
Last Update Date: 08/29/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(ii)(B) - UNANALYZED CONDITION
Person (Organization):
RICHARD SKOKOWSKI (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 98 Power Operation 98 Power Operation
Event Text
FAILURE TO ADDRESS ALL THE EFFECTS OF EXTERNAL FLOODING SCENARIOS

"On August 28, 2013, Monticello Nuclear Generating Plant (MNGP) was notified of the NRC's final significance determination for a finding involving the failure to maintain a procedure addressing all of the effects of an external flooding scenario on the plant. Specifically, MNGP failed to maintain flood Procedure A.6, 'Acts of Nature,' such that it could support the timely implementation of flood protection activities within the 12 day timeframe credited in the design basis as stated in the updated safety analysis report.

"The finding is not a current safety concern. On February 15, 2013, actions were completed to reduce the flood mitigation plan timeline to less than 12 days by developing an alternate plan for flood protection features, pre-staging equipment and materials, improving the quality of the A.6 procedure, and preplanning work orders necessary to carry out Procedure A.6 actions.

"The NRC Resident Inspector has been notified."