Event Number: 49307
Facility: COLUMBIA GENERATING STATION
Region: 4 State: WA
Unit: [2] [] []
RX Type: [2] GE-5
NRC Notified By: GREG KNUDSON
HQ OPS Officer: VINCE KLCO
Region: 4 State: WA
Unit: [2] [] []
RX Type: [2] GE-5
NRC Notified By: GREG KNUDSON
HQ OPS Officer: VINCE KLCO
Notification Date: 08/26/2013
Notification Time: 01:05 [ET]
Event Date: 08/25/2013
Event Time: 18:18 [PDT]
Last Update Date: 08/26/2013
Notification Time: 01:05 [ET]
Event Date: 08/25/2013
Event Time: 18:18 [PDT]
Last Update Date: 08/26/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL 50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL 50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
GREG WERNER (R4DO)
GREG WERNER (R4DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
LOSS OF SECONDARY CONTAINMENT DIFFERENTIAL PRESSURE
"Reactor Building (Secondary Containment) pressure increased to above the Technical Specification Surveillance requirement of 0,25 inches vacuum water gauge. This event is reportable as an event that could have prevented fulfillment of a safety function needed to control the release of radiation and mitigate the consequences of an accident. The Reactor Building differential pressure controller was placed in manual operation and Secondary Containment pressure was restored to normal (greater than 0.25 inches vacuum water gauge) returning Secondary Containment to operable status. Secondary Containment pressure was outside the allowable Technical Specification requirement for 4 minutes.
"There were no radiological releases associated with the event.
"No safety system actuations or isolations occurred."
The licensee notified the NRC Resident Inspector.
"Reactor Building (Secondary Containment) pressure increased to above the Technical Specification Surveillance requirement of 0,25 inches vacuum water gauge. This event is reportable as an event that could have prevented fulfillment of a safety function needed to control the release of radiation and mitigate the consequences of an accident. The Reactor Building differential pressure controller was placed in manual operation and Secondary Containment pressure was restored to normal (greater than 0.25 inches vacuum water gauge) returning Secondary Containment to operable status. Secondary Containment pressure was outside the allowable Technical Specification requirement for 4 minutes.
"There were no radiological releases associated with the event.
"No safety system actuations or isolations occurred."