Event Notification Report for February 15, 2013
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
02/14/2013 - 02/15/2013
EVENT NUMBERS
48756487574875848759
Power Reactor
Event Number: 48756
Facility: SALEM
Region: 1 State: NJ
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: CHRIS DAHMS
HQ OPS Officer: HOWIE CROUCH
Region: 1 State: NJ
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: CHRIS DAHMS
HQ OPS Officer: HOWIE CROUCH
Notification Date: 02/15/2013
Notification Time: 13:01 [ET]
Event Date: 02/15/2013
Event Time: 20:00 [EST]
Last Update Date: 02/18/2013
Notification Time: 13:01 [ET]
Event Date: 02/15/2013
Event Time: 20:00 [EST]
Last Update Date: 02/18/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
ANTHONY DIMITRIADIS (R1DO)
ANTHONY DIMITRIADIS (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
TECHNICAL SUPPORT CENTER TAKEN OUT OF SERVICE FOR PLANNED MAINTENANCE
"This report is being submitted in accordance with the requirements of 10 CFR 50.72(b)(3)(xiii), for planned maintenance which will result in temporary power outages for the Salem Technical Support Center.
"Planned maintenance will commence on the Salem 13 kV Substation 5, the normal power supply for the Salem Technical Support Center on February 15, 2013 at approximately 2000 hrs. [EST]. Normal and backup power supplies to the Salem Technical Support Center will be removed for approximately 3-4 hours during initial clearance tagging and system alignment, after which the Technical Support Center Emergency Diesel Generator will be available for manual starting to power the facility if needed while the normal power supply is unavailable.
"Substation 5 maintenance is scheduled to be completed by the afternoon of February 17, 2013 when the Salem Technical Support Center Emergency Diesel Generator backup power supply will again be isolated for a period of 3-4 hours during clearance tag removals and system realignment.
"While normal and backup power supplies are unavailable, Salem emergency plan procedures provide guidance for use of the Hope Creek Technical Support Center and the Emergency Operations Facility as backup facilities should activation of the Salem Technical Support Center be required.
"The NRC Resident Inspector has been notified."
The licensee will be notifying Lower Alloways Creek Township.
* * * UPDATE FROM POWELL TO SNYDER ON 2/18/13 AT 0015 EST * * *
The licensee completed work on the power supplies. Normal power was restored at 0010 EST on 12/18/13.
The licensee will notify the NRC Resident Inspector. Notified R1DO (Dimitriadis).
"This report is being submitted in accordance with the requirements of 10 CFR 50.72(b)(3)(xiii), for planned maintenance which will result in temporary power outages for the Salem Technical Support Center.
"Planned maintenance will commence on the Salem 13 kV Substation 5, the normal power supply for the Salem Technical Support Center on February 15, 2013 at approximately 2000 hrs. [EST]. Normal and backup power supplies to the Salem Technical Support Center will be removed for approximately 3-4 hours during initial clearance tagging and system alignment, after which the Technical Support Center Emergency Diesel Generator will be available for manual starting to power the facility if needed while the normal power supply is unavailable.
"Substation 5 maintenance is scheduled to be completed by the afternoon of February 17, 2013 when the Salem Technical Support Center Emergency Diesel Generator backup power supply will again be isolated for a period of 3-4 hours during clearance tag removals and system realignment.
"While normal and backup power supplies are unavailable, Salem emergency plan procedures provide guidance for use of the Hope Creek Technical Support Center and the Emergency Operations Facility as backup facilities should activation of the Salem Technical Support Center be required.
"The NRC Resident Inspector has been notified."
The licensee will be notifying Lower Alloways Creek Township.
* * * UPDATE FROM POWELL TO SNYDER ON 2/18/13 AT 0015 EST * * *
The licensee completed work on the power supplies. Normal power was restored at 0010 EST on 12/18/13.
The licensee will notify the NRC Resident Inspector. Notified R1DO (Dimitriadis).
Agreement State
Event Number: 48757
Rep Org: MA RADIATION CONTROL PROGRAM
Licensee: THERMO FISHER SCIENTIFIC, INC.
Region: 1
City: FRANKLIN State: MA
County:
License #: 55-0447
Agreement: Y
Docket:
NRC Notified By: JOHN SUMARES
HQ OPS Officer: STEVE SANDIN
Licensee: THERMO FISHER SCIENTIFIC, INC.
Region: 1
City: FRANKLIN State: MA
County:
License #: 55-0447
Agreement: Y
Docket:
NRC Notified By: JOHN SUMARES
HQ OPS Officer: STEVE SANDIN
Notification Date: 02/15/2013
Notification Time: 14:00 [ET]
Event Date: 02/15/2013
Event Time: 13:00 [EST]
Last Update Date: 02/15/2013
Notification Time: 14:00 [ET]
Event Date: 02/15/2013
Event Time: 13:00 [EST]
Last Update Date: 02/15/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
ANTHONY DIMITRIADIS (R1DO)
FSME EVENTS RESOURCE (EMAI)
ANTHONY DIMITRIADIS (R1DO)
FSME EVENTS RESOURCE (EMAI)
AGREEMENT STATE REPORT - LEAKING SEALED NI-63 SOURCE IN GAS CHROMATOGRAPH
The following information was received from the Commonwealth of Massachusetts via fax:
"The licensee reported to the Agency (MA Radiation Control Board) that a wipe test survey of an SVAC-G module containing a Ni-63 sealed source yielded 0.0068 microcuries. The licensee gave no further details about the sealed source or the device, and stated that a written report was mailed to the Agency. The SS&D registration certificate indicates the sealed source maximum activity is 5 millicuries. The SS&D certificate indicates the source is contained inside the 'Thermo Fisher Scientific' model SVAC-G module which is contained in a 'Thermo Fisher' model EGIS Defender gas chromatograph instrument."
The following information was received from the Commonwealth of Massachusetts via fax:
"The licensee reported to the Agency (MA Radiation Control Board) that a wipe test survey of an SVAC-G module containing a Ni-63 sealed source yielded 0.0068 microcuries. The licensee gave no further details about the sealed source or the device, and stated that a written report was mailed to the Agency. The SS&D registration certificate indicates the sealed source maximum activity is 5 millicuries. The SS&D certificate indicates the source is contained inside the 'Thermo Fisher Scientific' model SVAC-G module which is contained in a 'Thermo Fisher' model EGIS Defender gas chromatograph instrument."
Power Reactor
Event Number: 48758
Facility: PALISADES
Region: 3 State: MI
Unit: [1] [] []
RX Type: [1] CE
NRC Notified By: TERRY DAVIS
HQ OPS Officer: HOWIE CROUCH
Region: 3 State: MI
Unit: [1] [] []
RX Type: [1] CE
NRC Notified By: TERRY DAVIS
HQ OPS Officer: HOWIE CROUCH
Notification Date: 02/15/2013
Notification Time: 15:05 [ET]
Event Date: 02/15/2013
Event Time: 13:00 [EST]
Last Update Date: 02/15/2013
Notification Time: 15:05 [ET]
Event Date: 02/15/2013
Event Time: 13:00 [EST]
Last Update Date: 02/15/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(i) - PLANT S/D REQD BY TS
10 CFR Section:
50.72(b)(2)(i) - PLANT S/D REQD BY TS
Person (Organization):
PATTY PELKE (R3DO)
PATTY PELKE (R3DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 55 | Power Operation |
TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO COMPONENT COOLING WATER TRAIN OUT OF SERVICE
"At 2030 hours [EST] on February 14, 2013, technical specification (TS) 3.7.7 condition A was entered due to the right train of the component cooling water (CCW) system being declared inoperable. The cause of the inoperable train was the identification of an approximate 40 gallon per hour CCW system to service water system leak inside the 'A' CCW heat exchanger. TS 3.7.7 condition A requires restoration of the inoperable train within 72 hours. If the restoration is not completed within 72 hours, the plant must be in Mode 3 within 6 hours and in Mode 5 within the subsequent 36 hours.
"Due to the inability to repair the leak within the required 72 hour time frame during power operation, a plant shutdown was initiated at approximately 1300 hours on February 15, 2013. Entry into Mode 3 is expected at approximately 1700 hours on February 15, 2013. The plant will enter Mode 5 to execute leak repair. Mode 5 entry is expected at approximately 0800 hours on February 16, 2013.
"This event has no impact on the health and safety of the public. The NRC Resident Inspector has been notified."
"At 2030 hours [EST] on February 14, 2013, technical specification (TS) 3.7.7 condition A was entered due to the right train of the component cooling water (CCW) system being declared inoperable. The cause of the inoperable train was the identification of an approximate 40 gallon per hour CCW system to service water system leak inside the 'A' CCW heat exchanger. TS 3.7.7 condition A requires restoration of the inoperable train within 72 hours. If the restoration is not completed within 72 hours, the plant must be in Mode 3 within 6 hours and in Mode 5 within the subsequent 36 hours.
"Due to the inability to repair the leak within the required 72 hour time frame during power operation, a plant shutdown was initiated at approximately 1300 hours on February 15, 2013. Entry into Mode 3 is expected at approximately 1700 hours on February 15, 2013. The plant will enter Mode 5 to execute leak repair. Mode 5 entry is expected at approximately 0800 hours on February 16, 2013.
"This event has no impact on the health and safety of the public. The NRC Resident Inspector has been notified."
Non-Agreement State
Event Number: 48759
Rep Org: DEPARTMENT OF VETERANS AFFAIRS
Licensee: CARL VINSON VA MEDICAL CENTER
Region: 1
City: DUBLIN State: GA
County:
License #: 03-23853-01VA
Agreement: Y
Docket:
NRC Notified By: THOMAS HUSTON
HQ OPS Officer: STEVE SANDIN
Licensee: CARL VINSON VA MEDICAL CENTER
Region: 1
City: DUBLIN State: GA
County:
License #: 03-23853-01VA
Agreement: Y
Docket:
NRC Notified By: THOMAS HUSTON
HQ OPS Officer: STEVE SANDIN
Notification Date: 02/15/2013
Notification Time: 16:56 [ET]
Event Date: 02/15/2013
Event Time: 07:00 [EST]
Last Update Date: 02/15/2013
Notification Time: 16:56 [ET]
Event Date: 02/15/2013
Event Time: 07:00 [EST]
Last Update Date: 02/15/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
20.1906(d)(1) - SURFACE CONTAM LEVELS > LIMITS
10 CFR Section:
20.1906(d)(1) - SURFACE CONTAM LEVELS > LIMITS
Person (Organization):
PATTY PELKE (R3DO)
FSME EVENTS RESOURCE (EMAI)
PATTY PELKE (R3DO)
FSME EVENTS RESOURCE (EMAI)
PACKAGE RECEIVED AT VA MEDICAL CENTER WITH OUTSIDE CONTAMINATION EXCEEDING LIMITS
"[The Department of Veterans Affairs, Veterans Health Administration (VHA) National Health Physics Programs] has a master materials license from the Nuclear Regulatory Commission. License number is 03-23853-01VA.
"Per 10 CFR 20.1906(d), [the VA] is reporting receipt of a package of radioactive material with removable surface contamination on the outside of the package greater than NRC reporting limits.
"The package was received today (February 15, 2013) at around 7 AM ET by Carl Vinson VA Medical Center, Dublin, Georgia. The package was checked-in and surveyed around 8:30 AM ET. This medical center holds permit number 10-09569-01 under the VHA master materials license.
"Wipe tests performed on the external surface of the package indicated a removable contamination level of 4190 dpm/cm2 as compared to the regulatory limit of 220 dpm/cm2 for beta-gamma emitters.
"The package contained eight unit dosages of radiopharmaceuticals ranging between 6 and 40 millicuries each of Technetium-99m and was shipped from Cardinal Health in Augusta, Georgia. The inner packaging materials were also found to be contaminated.
"The VA facility Nuclear Medicine Technologist who surveyed the packages immediately notified the vendor/shipper, who serves as the final delivery carrier, about the contaminated package at about 9 AM ET. [The VA National Programs] office was not notified until about 4 PM ET.
"As corrective actions: the packaging materials were bagged and set aside in a restricted area at the VA Medical Center and were reclaimed later in the day by the radiopharmacy.
[The VA has also] notified NRC Region III Project Manager (K. Null) ..."
HOO Note: A similar incident at the same facility was reported on 02/11/13 - see EN #48742.
"[The Department of Veterans Affairs, Veterans Health Administration (VHA) National Health Physics Programs] has a master materials license from the Nuclear Regulatory Commission. License number is 03-23853-01VA.
"Per 10 CFR 20.1906(d), [the VA] is reporting receipt of a package of radioactive material with removable surface contamination on the outside of the package greater than NRC reporting limits.
"The package was received today (February 15, 2013) at around 7 AM ET by Carl Vinson VA Medical Center, Dublin, Georgia. The package was checked-in and surveyed around 8:30 AM ET. This medical center holds permit number 10-09569-01 under the VHA master materials license.
"Wipe tests performed on the external surface of the package indicated a removable contamination level of 4190 dpm/cm2 as compared to the regulatory limit of 220 dpm/cm2 for beta-gamma emitters.
"The package contained eight unit dosages of radiopharmaceuticals ranging between 6 and 40 millicuries each of Technetium-99m and was shipped from Cardinal Health in Augusta, Georgia. The inner packaging materials were also found to be contaminated.
"The VA facility Nuclear Medicine Technologist who surveyed the packages immediately notified the vendor/shipper, who serves as the final delivery carrier, about the contaminated package at about 9 AM ET. [The VA National Programs] office was not notified until about 4 PM ET.
"As corrective actions: the packaging materials were bagged and set aside in a restricted area at the VA Medical Center and were reclaimed later in the day by the radiopharmacy.
[The VA has also] notified NRC Region III Project Manager (K. Null) ..."
HOO Note: A similar incident at the same facility was reported on 02/11/13 - see EN #48742.