Skip to main content

Event Notification Report for June 20, 2012

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
06/19/2012 - 06/20/2012

EVENT NUMBERS
4803948163

Power Reactor
Event Number: 48039
Facility: TURKEY POINT
Region: 2     State: FL
Unit: [3] [4] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: CHRISTOPHER TRENT
HQ OPS Officer: DONALD NORWOOD
Notification Date: 06/20/2012
Notification Time: 17:24 [ET]
Event Date: 06/20/2012
Event Time: 08:57 [EDT]
Last Update Date: 06/20/2012
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 - FITNESS FOR DUTY
Person (Organization):
ALAN BLAMEY (R2DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Refueling 0 Refueling
4 N Y 100 Power Operation 100 Power Operation
Event Text
FITNESS FOR DUTY EVENT

A non-licensed contract employee supervisor had a confirmed positive for illegal drugs during a random fitness-for-duty test. The employee's access to the plant has been terminated. Contact the Headquarters Operations Officer for additional details.


Part 21
Event Number: 48163
Rep Org: ITT ENIDINE
Licensee: ITT ENIDINE
Region: 1
City: WESTMINSTER   State: SC
County:
License #:
Agreement: Y
Docket:
NRC Notified By: JEFFREY GOTTHELF
HQ OPS Officer: JOHN SHOEMAKER
Notification Date: 08/07/2012
Notification Time: 09:09 [ET]
Event Date: 06/20/2012
Event Time: 00:00 [EDT]
Last Update Date: 08/07/2012
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21(d)(3)(i) - DEFECTS AND NONCOMPLIANCE
Person (Organization):
LAWRENCE DOERFLEIN (R1DO)
DANIEL RICH (R2DO)
CHRISTINE LIPA (R3DO)
MICHAEL VASQUEZ (R4DO)
PART 21 REACTORS (EMAI)
Event Text
PRESSURE TRANSDUCERS FAILURE TO COMPLY WITH SPECIFICATIONS

The following was received via fax.

"The ITT Conoflow model GT25 series current to pressure transducer specifies air consumption of 0.2 scfm. On June 20, 2012, a discrepancy between the published air consumption specification and the acceptance procedure for production verification was discovered. Units manufactured prior to June 20, 2012 may have air consumption as high as 0.299 scfm.

"Corrective and preventive actions have been implemented to bring the product into specification, and insure compliance to specification prior to shipment.

"Nuclear facilities which use this product should evaluate this potential increase in instrument air consumption against their systems air capacity, to determine if this condition could pose a safety risk.

"ITT Enidine will evaluate and correct any affected product. The attached table [below] is a list of customers, and the specific part numbers procured from ITT since 2002. These customers will be notified of this potential product defect by August 17, 2012."

Contact ITT ENIDINE - JEFFREY GOTTHELF Ph. 864-647-9521 Ext. 318 for details.

The following is an ITT GT25 Series customer list (2002 to present):
CUSTOMER NAME PRODUCT
ACSYR SL GT25CA1826
ALABAMA POWER COMPANY GT25CA1826
ASIAM INT'L (TAIWAN) INC. GT25CA1826
ONTARIO POWER GENERATION GT25CD1826
CONTROL COMPONENTS INC GT25CD1826
DETROIT EDISON GT25CD1826
DTE ENERGY GT25CD1826
ENERGY NORTHWEST GT25CA1826
ERGYTECH INC GT25CD1826
ENRICO FERMI POWER PLANT 2 GT25CD1826
EXELON BUSINESS SERVICES GT25CA1826
FLOWSERVE GT25CA1826
GEFRAN BENELUX NV GT25CA1826
KOREA HYDRO & NUCLEAR PWR GT25CA1826
NEBRASKA PUBLIC POWER GT25CA1826
NUCLEAR POWER PLANT KRSKO GT25CA1826
OMAHA PUBLIC POWER DIST GT25FA1826
TVA NUCLEAR ASSURANCE AND LICENSING GT25CD1826 and GT65CD1826
CENTRAL NUCLEAR DE ALMARAZ GT25CD1826
AMERGEN ENERGY, LLC GT25CA1826