Event Notification Report for May 15, 2012
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/14/2012 - 05/15/2012
EVENT NUMBERS
47924
Power Reactor
Event Number: 47924
Facility: FARLEY
Region: 2 State: AL
Unit: [1] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: STEVE GATES
HQ OPS Officer: MARK ABRAMOVITZ
Region: 2 State: AL
Unit: [1] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: STEVE GATES
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 05/15/2012
Notification Time: 10:39 [ET]
Event Date: 05/15/2012
Event Time: 07:20 [CDT]
Last Update Date: 05/15/2012
Notification Time: 10:39 [ET]
Event Date: 05/15/2012
Event Time: 07:20 [CDT]
Last Update Date: 05/15/2012
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
SCOTT FREEMAN (R2DO)
SCOTT FREEMAN (R2DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
TECHNICAL SUPPORT CENTER PLANNED MAINTENANCE
"The Farley Nuclear Plant Technical Support Center (TSC) has been rendered non-functional due to a pre-planned and scheduled maintenance period to perform PMs [Preventive Maintenance] on the TSC ventilation system. The TSC ventilation maintenance will be worked with high priority to include around the clock support. Pre-planned compensatory measures are in place in accordance with site procedures to include the conditional relocation of the TSC staff should the Emergency Director deem the TSC to be uninhabitable.
"This report is being generated per Technical Requirements Manual TRM section 13.13.1 condition B for the TSC emergency response facility being out of service for greater than 30 minutes. The projected return to service is on 5/15/12 at 16:30 CDT."
The licensee notified the NRC Resident Inspector.
"The Farley Nuclear Plant Technical Support Center (TSC) has been rendered non-functional due to a pre-planned and scheduled maintenance period to perform PMs [Preventive Maintenance] on the TSC ventilation system. The TSC ventilation maintenance will be worked with high priority to include around the clock support. Pre-planned compensatory measures are in place in accordance with site procedures to include the conditional relocation of the TSC staff should the Emergency Director deem the TSC to be uninhabitable.
"This report is being generated per Technical Requirements Manual TRM section 13.13.1 condition B for the TSC emergency response facility being out of service for greater than 30 minutes. The projected return to service is on 5/15/12 at 16:30 CDT."
The licensee notified the NRC Resident Inspector.