Power Reactor
Event Number: 46633
Facility: PALO VERDE
Region: 4     State: AZ
Unit: [1] [] [3]
RX Type: [1] CE,[2] CE,[3] CE
NRC Notified By: BRADFORD ROBINSON
HQ OPS Officer: BILL HUFFMAN
Notification Date: 02/22/2011
Notification Time: 02:23 [ET]
Event Date: 02/21/2011
Event Time: 20:01 [MST]
Last Update Date: 02/22/2011
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
VINCENT GADDY (R4DO)
FREDERICK BROWN (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
AUTO START AND LOAD OF EDGs ON UNITS 1&3 FOLLOWING LOSS OF START-UP TRANSFORMER

"On February 21, 2011, at approximately 2001 Mountain Standard Time (MST) a valid actuation of the Palo Verde Nuclear Generating Station Unit 1 Train 'B' Emergency Diesel Generator (EDG) and Unit 3 Train 'A' Emergency Diesel Generator occurred as a result of undervoltage on their respective safety buses. Both EDGs started and loaded as designed to energize the respective safety buses. No Emergency Plan declaration was made and none was required.

"The loss of power to the Unit 1 and Unit 3 safety buses was the result of protective relay actuations on the A-E-NANX02 Startup Transformer which deenergized the transformer and the Unit 1 13.8KV Intermediate Bus 1-E-NAN-S06 and the Unit 3 13.8KV Intermediate Bus 3-E-NAN-SOS. The affected intermediate buses provide power to the Unit 1 safety bus 1-E-PBB-S04 and the Unit 3 safety bus 3-E-PBA-S03 respectively. The Auxiliary Operators responded to inspect the Startup Transformer and affected buses and determined that there was no fire or smoke and no obvious equipment damage to transformers or associated 13.8 KV Buses. At the time of the actuations, the Unit 1 Control Room received alarms for Startup Transformer A-E-NAN-X02 'Phase, Winding Ground Differential Trip'.

"Subsequent inspection by the Electricians identified damage to the cabling from the 'Y' winding of A-E-NAN-X02 Start-Up Transformer to the alternate supply breaker on Unit 2 Intermediate Bus 2-E-NAN-SOS. Unit 1 and Unit 3 entered Technical Specification LCO 3.8.1, Condition 'A', for one (of two) required offsite circuits inoperable. Unit 2 currently has the 'B' EDG out of service for a planned maintenance outage and the Unit 2 safety buses and required offsite circuits were unaffected by the Startup Transformer trip. Unit 2 safety buses are being supplied by Startup Transformers A-E-NAN-X01 and A-E-NAN-X03.

"Both Unit 1 and Unit 3 were at approximately 100% power, at normal operating temperature and pressure prior to and following the EDG actuations. No other ESF actuations occurred and none were required. No major equipment was inoperable prior to the event that contributed to the event.

"The event did not result in any challenges to fission product barriers and there were no adverse safety consequences as a result of this event. The event did not adversely affect the safe operation of the plant or the health and safety of the public.

"The NRC Resident Inspector has been notified of the ESF actuations and this ENS notification."

The licensee is working to restore normal electrical power to the affected safety buses from alternate available sources on Startup Transformers X01 and X03. The licensee stated that no significant non-safety related equipment has been deenergized. The licensee noted that while the cause of the damaged cabling noted in the above report is still under investigation, water intrusion repairs were recently conducted near the location where the current damages were found.

* * * UPDATE AT 0356 EST ON 2/22/11 FROM ROBINSON TO HUFFMAN * * *

The licensee has restored offsite power to the affected safety buses. The Unit 3 safety bus was restored from Startup Transformer X03 at 0106 MST. The Unit 1 safety bus was restored from Startup Transformer X01 at 0153 MST. The EDGs are in the process of being shutdown and reset. The LCO for required offsite power source to the buses has been exited.

R4DO (Gaddy) and NRR (Brown) notified.


Agreement State
Event Number: 46635
Rep Org: COLORADO DEPT OF HEALTH
Licensee: NUQUEST PHARMACY
Region: 4
City: GRAND JUNCTION   State: CO
County:
License #: 1022-01
Agreement: Y
Docket:
NRC Notified By: ED STROUD
HQ OPS Officer: PETE SNYDER
Notification Date: 02/22/2011
Notification Time: 15:09 [ET]
Event Date: 02/21/2011
Event Time: 00:00 [MST]
Last Update Date: 02/22/2011
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
VIVIAN CAMPBELL (R4DO)
DUNCAN WHITE (FSME)
Event Text
AGREEMENT STATE REPORT - PHARMACOLOGICAL PACKAGE WITH SURFACE CONTAMINATION IN EXCESS OF LIMITS

The state of Colorado submitted the following information via e-mail:

"On 2/21/11, a medical licensee, St. Mary's Hospital in Grand Junction, Colorado (CO License # 14-03), notified the Department that they received a package containing medical isotopes that was externally contaminated in excess of reporting limits. The package originated from NuQuest Pharmacy (CO License # 1022-01) also located in Grand Junction, Colorado. Hospital staff reported that the package, which contained about 50 millicuries of I-131, was intact but had about 1 microcurie of external contamination present.

"Hospital staff immediately notified the RSO at NuQuest who was able to contact their driver and perform contamination surveys, which were negative. NuQuest's RSO conducted an investigation and reported that the driver, who also works at the pharmacy as a helper, is a new employee. The RSO believes that the new employee must have forgotten to change his gloves after handling some I-131 waste, and touched the package before it was loaded into the vehicle.

"The RSO stated that he provided additional training to the new employee as a corrective action. Also, as a precaution, the RSO plans to perform a thyroid scan to verify that there was no uptake of I-131 by the new employee. No other details are available at this time."