Event Notification Report for October 08, 2010
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/07/2010 - 10/08/2010
Power Reactor
Event Number: 46321
Facility: VOGTLE
Region: 2 State: GA
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: CECIL H. WILLIAMS, JR.
HQ OPS Officer: JOHN SHOEMAKER
Region: 2 State: GA
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: CECIL H. WILLIAMS, JR.
HQ OPS Officer: JOHN SHOEMAKER
Notification Date: 10/08/2010
Notification Time: 13:54 [ET]
Event Date: 10/08/2010
Event Time: 11:00 [EDT]
Last Update Date: 11/09/2010
Notification Time: 13:54 [ET]
Event Date: 10/08/2010
Event Time: 11:00 [EDT]
Last Update Date: 11/09/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
GERALD MCCOY (R2DO)
GERALD MCCOY (R2DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 98 | Power Operation | 98 | Power Operation |
INTEGRATED PLANT COMPUTER REMOVED FROM SERVICE FOR UPGRADE WORK
"At 1100, October 8, 2010, Unit 1 Integrated Plant Computer (IPC) was shutdown for upgrade work. This includes the SPDS [Safety Parameter Display System] system which is a function of the IPC. The IPC will be returned to service in approximately two weeks and SPDS function will be restored at that time. In addition, the ERDS [Emergency Response Data System] is out of service and will be restored in the same time frame. Per the 50.54.Q that was prepared by our Emergency Preparedness group, notification has been made to the NRC ERDS group of the unavailability of the ERDS system. While the IPC is out of service, control board indications are being utilized by the control room crew. In addition, the safety-related Plant Safety Monitoring System (PSMS) is OPERABLE. Restoration of SPDS and ERDS functions have been given the highest priority during restoration of the system. Both the NRC Ops Center and the NRC ERDS group will be notified when SPDS and ERDS capability have been restored."
The NRC Resident Inspector has been notified.
* * * UPDATE ON 11/9/2010 AT 1555 EST FROM CECIL WILLIAMS TO MARK ABRAMOVITZ * * *
"On Oct 8, 2010, EN# 46321 was made for notification that the Unit 1 Integrated Plant Computer (IPC) was shutdown for upgrade and that the SPDS function was out of service until the upgrade was completed. The IPC has been returned to service sufficiently to support SPDS Functionality. All data points have been verified and associated Control Room annunciator tested. Therefore, at this time SPDS is considered returned to service. The ERDS function has previously been tested with the NRC ERDS Group and returned to service."
The licensee notified the NRC Resident Inspector.
Notified the R2DO (Blamey).
"At 1100, October 8, 2010, Unit 1 Integrated Plant Computer (IPC) was shutdown for upgrade work. This includes the SPDS [Safety Parameter Display System] system which is a function of the IPC. The IPC will be returned to service in approximately two weeks and SPDS function will be restored at that time. In addition, the ERDS [Emergency Response Data System] is out of service and will be restored in the same time frame. Per the 50.54.Q that was prepared by our Emergency Preparedness group, notification has been made to the NRC ERDS group of the unavailability of the ERDS system. While the IPC is out of service, control board indications are being utilized by the control room crew. In addition, the safety-related Plant Safety Monitoring System (PSMS) is OPERABLE. Restoration of SPDS and ERDS functions have been given the highest priority during restoration of the system. Both the NRC Ops Center and the NRC ERDS group will be notified when SPDS and ERDS capability have been restored."
The NRC Resident Inspector has been notified.
* * * UPDATE ON 11/9/2010 AT 1555 EST FROM CECIL WILLIAMS TO MARK ABRAMOVITZ * * *
"On Oct 8, 2010, EN# 46321 was made for notification that the Unit 1 Integrated Plant Computer (IPC) was shutdown for upgrade and that the SPDS function was out of service until the upgrade was completed. The IPC has been returned to service sufficiently to support SPDS Functionality. All data points have been verified and associated Control Room annunciator tested. Therefore, at this time SPDS is considered returned to service. The ERDS function has previously been tested with the NRC ERDS Group and returned to service."
The licensee notified the NRC Resident Inspector.
Notified the R2DO (Blamey).
General Information or Other
Event Number: 46322
Rep Org: NJ RAD PROT AND REL PREVENTION PGM
Licensee: SOR TESTING LABS
Region: 1
City: Carteret State: NJ
County:
License #:
Agreement: Y
Docket:
NRC Notified By: JAMES MCCULLOUGH
HQ OPS Officer: BILL HUFFMAN
Licensee: SOR TESTING LABS
Region: 1
City: Carteret State: NJ
County:
License #:
Agreement: Y
Docket:
NRC Notified By: JAMES MCCULLOUGH
HQ OPS Officer: BILL HUFFMAN
Notification Date: 10/08/2010
Notification Time: 19:45 [ET]
Event Date: 10/08/2010
Event Time: 15:00 [EDT]
Last Update Date: 10/08/2010
Notification Time: 19:45 [ET]
Event Date: 10/08/2010
Event Time: 15:00 [EDT]
Last Update Date: 10/08/2010
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
JUDY JOUSTRA (R1DO)
PAUL MICHALAK (FSME)
JUDY JOUSTRA (R1DO)
PAUL MICHALAK (FSME)
AGREEMENT STATE REPORT - DAMAGE TO TROXLER PORTABLE DENSITY GAUGE
A Troxler portable density gauge was run over by a front end loader, at a construction site, causing damage and bending the source rod. The source rod is retracted but the shutter door is open. The density gage was returned to its storage container. Survey of the device and area indicates that no leakage occurred. The unit will be returned the licensee location for storage in a locked area for the weekend. The density gauge will be sent out for repair next week.
The density gauge is a Model 3430 Troxler with a nominal 8 mCi Cs-137 gamma source and a 40 mCi Am-241:Be neutron source.
A Troxler portable density gauge was run over by a front end loader, at a construction site, causing damage and bending the source rod. The source rod is retracted but the shutter door is open. The density gage was returned to its storage container. Survey of the device and area indicates that no leakage occurred. The unit will be returned the licensee location for storage in a locked area for the weekend. The density gauge will be sent out for repair next week.
The density gauge is a Model 3430 Troxler with a nominal 8 mCi Cs-137 gamma source and a 40 mCi Am-241:Be neutron source.